Surveying and Geoinformatics Practice

  • Traverse closure: linear misclosure = sqrt(ΔE² + ΔN²); relative precision = misclosure / total traverse length, expressed as 1:N (e.g., 1:10,000).

  • Bowditch (compass) rule distributes misclosure proportionally to leg length; the transit rule distributes it proportionally to the northing/easting change of each leg.

  • Angular misclosure for an n-sided closed traverse = sum of observed interior angles − (n−2)×180°; permissible error commonly set as a×√n where a is the instrument's specified seconds per setup.

  • Resection (three-point problem) fixes an unknown station from three known points; the danger circle is the locus of positions where the three points lie on one circle, giving an indeterminate solution.

  • Horizontal curve: T = R tan(Δ/2); L = RΔ (Δ in radians) = 100Δ/D where D is degree of curve; M = R(1/cos(Δ/2) − 1).

  • Vertical curve elevation: y = y_BVC + g1x + ((g2−g1)/2L)x², with x measured from the BVC and grades as decimals.

  • Contour interval is chosen from map scale and terrain relief; contours crossing a stream form a V pointing upstream, and contours never cross except at an overhang or cliff.

  • GNSS RTK horizontal accuracy is typically 10 mm + 1 ppm (and roughly double vertically); fix quality degrades with PDOP, multipath, and loss of correction link.

Quick reference

Cadastral Surveying and Land Registration

  • Torrens registration: title is registered and guaranteed by the state, so the register is conclusive evidence of ownership rather than the deed itself.

  • Boundary retracement principle: follow the original monument first, then bearings and distances, then area, then adjoining parcel lines, in that order of precedence.

  • Adverse possession requires open, notorious, exclusive, continuous, and hostile possession for the statutory period; it does not extinguish a registered Torrens title in most Torrens jurisdictions.

  • A metes-and-bounds description must close; the record misclosure is checked before accepting the description, and area is computed by the coordinate (shoelace) method.

  • Easement vs. fee: an easement conveys a right of use, not ownership; the servient tenement remains in the owner's title.

  • Lot-and-block and parcel-identifier systems link the cadastral map to the land register; the cadastral index map is not itself the legal evidence of title.

  • Riparian and littoral boundaries follow the ordinary high-water mark or thread of the stream, depending on jurisdiction; accretion is gradual and belongs to the riparian owner, avulsion does not.

Quick reference

Geodesy and Positioning

  • Geodetic vs. geocentric latitude: geodetic latitude is the angle between the ellipsoid normal and the equatorial plane; geocentric latitude is measured from the ellipsoid center, differing by up to about 11.5 arcminutes.

  • Ellipsoid parameters: flattening f = (a − b)/a; first eccentricity e² = 2f − f²; radius of curvature in the meridian M = a(1−e²)/(1−e²sin²φ)^(3/2).

  • WGS84 and GDA2020 are geocentric datums; transformations between them require a 7-parameter Helmert (3 translations, 3 rotations, scale) or a time-dependent plate-motion model.

  • Geoid undulation N relates ellipsoidal height h and orthometric height H by h = H + N; GNSS gives h, leveling gives H.

  • UTM: 60 zones of 6° longitude, central meridian scale factor 0.9996, false easting 500,000 m; the scale error grows with distance from the central meridian.

  • Map projection distortion: conformal projections preserve angles and local shape but not area; equal-area projections preserve area but distort shape.

  • DOP: PDOP² = HDOP² + VDOP²; a PDOP below about 4 is generally needed for reliable RTK fixes.

  • Coordinate transformation: a minimum of 2 control points for a 4-parameter (2D Helmert) and 3 for a 6-parameter (3D) similarity transformation; residuals reveal control quality.

Quick reference

Professional Ethics and Survey Regulations

  • A surveyor signs and seals only work performed by themselves or under their direct supervision; sealing work outside one's competence is a disciplinary offence.

  • Conflict of interest must be disclosed in writing before accepting an engagement; a surveyor may not act for both parties in the same boundary dispute without informed consent.

  • Records, field notes, and coordinates are retained for the statutory period (commonly 7 years or the jurisdiction's specified term) and are the property of the client or the public record as defined by law.

  • Boundary opinions are professional opinions, not legal determinations; the surveyor reports evidence and does not adjudicate title.

  • Confidentiality: client information may be disclosed only with consent or where required by law, subpoena, or public safety.

  • Continuing professional development is a condition of registration renewal in most jurisdictions; falsifying CPD records is misconduct.

  • Advertising and fees must not be misleading; contingency fees tied to a boundary outcome are generally prohibited as compromising independence.