SURCON Technologist study materials
SURCON Technologist study resources

SURCON Technologist flashcards

SURCON Technologist · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Linear misclosure
The straight-line distance between the computed and known endpoint of a traverse, equal to the square root of the sum of squared easting and northing misclosures.
Relative precision
Linear misclosure divided by total traverse length, expressed as a ratio 1:N; a smaller N indicates poorer relative accuracy.
Bowditch rule
A traverse adjustment that distributes misclosure in proportion to each leg's length, applied separately to eastings and northings.
Angular misclosure
The difference between the sum of observed traverse angles and the theoretical sum, which is (n−2)×180° for interior angles of an n-sided polygon.
Danger circle
The locus of observer positions from which three known resection points appear on one circle, making the three-point resection indeterminate.
Degree of curve
The central angle subtended by a 100-unit arc; arc length L equals 100 times the deflection angle divided by the degree of curve.
Vertical curve equation
Elevation at distance x from the BVC equals BVC elevation plus g1x plus (g2−g1)x² divided by twice the curve length, grades as decimals.
Contour V rule
Contours crossing a valley or stream form a V shape pointing upstream, indicating the direction of increasing elevation along the drainage line.
Torrens system
A land registration system in which the state register, not the deed, is conclusive evidence of title and the state guarantees the registered title.
Boundary evidence hierarchy
The order of precedence in retracement: original monuments, then bearings and distances, then area, then adjoining parcel lines.
Adverse possession elements
Possession that is open, notorious, exclusive, continuous, and hostile to the owner's interest for the statutory period required to claim title.
Metes and bounds
A boundary description using bearings, distances, and monuments; it must close, and its record misclosure is checked before acceptance.
Easement
A right of use over another's land (the servient tenement) that does not transfer ownership of the land itself.
Accretion vs. avulsion
Accretion is gradual, imperceptible addition of land by water and belongs to the riparian owner; avulsion is sudden change and does not shift the boundary.
Cadastral index map
A map showing parcel boundaries and identifiers that links the land register to the ground; it is not itself conclusive proof of title.
Geodetic latitude
The angle between the ellipsoid normal at a point and the equatorial plane, differing from geocentric latitude by up to about 11.5 arcminutes.
Flattening
The ellipsoid parameter f equal to (a−b)/a, where a is the semi-major and b the semi-minor axis of the ellipsoid.
First eccentricity squared
The ellipsoid parameter e² equal to 2f − f², used in the formulas for radii of curvature and geodetic computations.
Geoid undulation
The separation N between the ellipsoid and the geoid, related to heights by h = H + N, where h is ellipsoidal and H orthometric height.
Helmert transformation
A seven-parameter similarity transformation using three translations, three rotations, and a scale factor to convert coordinates between geodetic datums.
UTM central meridian
The meridian at the center of each 6-degree UTM zone, assigned a scale factor of 0.9996 and a false easting of 500,000 metres.
Conformal projection
A map projection that preserves local angles and shape but distorts area, exemplified by the transverse Mercator used in UTM.
PDOP
Position dilution of precision, the square root of the sum of HDOP squared and VDOP squared; values below about 4 favour reliable RTK.
Four-parameter transformation
A 2D similarity transformation using two translations, one rotation, and a scale factor, requiring a minimum of two common control points.
Seal and signature rule
A surveyor signs and seals only work they performed or directly supervised, and only within their demonstrated area of competence.
Conflict of interest
A personal or financial interest that could bias professional judgement; it must be disclosed in writing before the engagement is accepted.
Record retention
The statutory obligation to keep field notes, computations, and coordinates for a defined period, commonly seven years or as the jurisdiction specifies.
Boundary opinion
A surveyor's professional statement of evidence and position on a boundary, which is not a legal adjudication of title.
Confidentiality duty
The obligation not to disclose client information except with consent or where required by law, subpoena, or public safety.
Continuing professional development
Mandatory ongoing learning required to renew registration; falsifying CPD records constitutes professional misconduct.
Contingency fee prohibition
A rule barring fees contingent on a boundary or legal outcome, because such arrangements compromise the surveyor's independence and objectivity.
Misleading advertising
Promotional or fee statements that overstate qualifications or accuracy, which are prohibited as unethical conduct under survey regulations.