SURCON Technologist study plan
SURCON Technologist · Give each week a clear focus.
8 weeks · About 7 hours per week
Surveying and Geoinformatics Practice & Geodesy and Positioning
Map the Domain 1 and Domain 3 exam objectives into a personal checklist and mark each item as known, shaky, or unknown
Define and correctly distinguish horizontal and vertical control, traverse, triangulation, and GNSS static versus RTK workflows
Compute a closed traverse angular misclosure and distribute it using the equal-correction method on a worked example
Convert between grid, geodetic, and geocentric coordinates for a single point using published projection parameters
Your checkpoint
A one-page control-surveying and coordinate-conversion cheat sheet plus 20 solved traverse and conversion practice problems with worked steps
Surveying and Geoinformatics Practice & Geodesy and Positioning
Explain the role of reference frames and datums and convert coordinates between a local datum and a modern terrestrial reference frame
Describe GNSS observation types, error sources, and mitigation (ionosphere, troposphere, multipath, satellite geometry) and interpret DOP values
Outline a leveling network adjustment and identify the purpose of redundant observations and least squares
List the components of a topographic survey deliverable (surface model, contours, breaklines, feature codes) and the quality checks applied to each
Your checkpoint
A 1,500-word summary of GNSS positioning and leveling adjustment with five self-written exam-style questions and answer keys
Cadastral Surveying and Land Registration & Surveying and Geoinformatics Practice
Trace the cadastral survey workflow from field evidence collection through boundary determination to plan lodgment
Identify the types of boundary evidence and rank their weight in boundary re-establishment
Describe how a survey plan and its associated dataset are structured and what attributes link parcels to the register
Compare subdivision, consolidation, and easement survey requirements and the plan type each produces
Your checkpoint
A process flowchart of a cadastral survey from instruction to registration, annotated with the evidence and documents required at each step
Cadastral Surveying and Land Registration & Professional Ethics and Survey Regulations
Explain the principles of a land registration system, including the distinction between title registration and deed registration
Describe the register, parcel identifier, and cadastral index, and how they stay consistent with the survey record
Identify the statutory duties of a surveyor when lodging a plan, including certification, accuracy statements, and disclosure of discrepancies
Apply a conflict-of-interest and record-keeping scenario to the relevant professional conduct obligations
Your checkpoint
A 1,200-word case analysis of a boundary discrepancy that reaches registration, with the surveyor's statutory and ethical obligations identified at each decision point
Professional Ethics and Survey Regulations & Cadastral Surveying and Land Registration
Summarize the surveyor's duties to the public, clients, and the profession, and distinguish them where they conflict
Describe the purpose and process of a professional standards or disciplinary investigation and the surveyor's obligations during it
Explain continuing professional development, competence limits, and the duty to decline work outside one's competence
Apply privacy and data-handling obligations to cadastral records and client survey data
Your checkpoint
A two-column ethics reference table listing 15 obligations alongside a concrete breach example and the correct course of action for each
Cadastral Surveying and Land Registration & Surveying and Geoinformatics Practice
Re-establish a lost boundary corner from recorded bearings and distances and from physical evidence, and document the reasoning
Compute a parcel area from coordinates and reconcile it against the recorded area, explaining acceptable tolerances
Describe the accuracy standards and positional uncertainty statements expected in cadastral and engineering surveys
Identify common sources of cadastral plan error and the correction or amendment process for each
Your checkpoint
A worked boundary re-establishment report for a hypothetical two-lot parcel, including coordinate computation, area check, and a written justification of the boundary adopted
Surveying and Geoinformatics Practice & Geodesy and Positioning
Describe the geoid, ellipsoid, and height systems and convert between ellipsoidal and orthometric heights
Explain map projection distortion and select an appropriate projection for a given survey extent
Outline a control survey specification covering accuracy class, observation method, redundancy, and reporting
Interpret survey measurement uncertainty and propagate error through a simple traverse
Your checkpoint
A control survey specification for a 200-hectare project covering datum, projection, accuracy class, observation schedule, and adjustment report contents
Surveying and Geoinformatics Practice & Cadastral Surveying and Land Registration & Geodesy and Positioning & Professional Ethics and Survey Regulations
Complete a timed 100-question mixed mock exam across all four domains and score each domain separately
Review every missed item and classify the cause as knowledge gap, misread question, or calculation error
Revisit the weakest two objectives from the week 1 checklist and close them with targeted practice
Recite the key formulas, tolerances, and statutory duties from memory in a single condensed sheet
Your checkpoint
A scored mock exam report with per-domain percentages, a ranked list of remaining weaknesses, and a one-page final revision sheet
Milestones
Week 2: Score at least 70% on a self-written 25-question set covering traverse computation, coordinate conversion, and GNSS error sources
Week 4: Explain the full cadastral survey-to-registration pathway without notes and correctly answer 8 of 10 scenario questions on statutory duties and conflicts of interest
Week 6: Produce a boundary re-establishment with a documented decision trail and an area reconciliation within stated tolerance
Week 8: Achieve at least 75% overall on the mixed mock exam with no single domain below 65%