NH Water/Wastewater Operator study materials
NH Water/Wastewater Operator study resources

NH Water/Wastewater Operator study plan

NH Water/Wastewater Operator · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Drinking Water Treatment and Distribution & Wastewater Treatment and Collection

  • Map the Domain 1 blueprint into treatment-train stages (source, coagulation/flocculation, sedimentation, filtration, disinfection, storage, distribution) and label each stage with its key operator-controlled parameters

  • Trace a drop of surface water from intake to customer tap, writing the purpose and failure mode of each unit process from memory

  • Sketch the parallel wastewater train (collection, screening/grit, primary, secondary biological, disinfection, discharge) and match each stage to its regulatory limit category

  • Build a one-page glossary of 40 core terms spanning both domains (NTU, CT, SDWA, MCL, BOD, TSS, SRT, MLSS, RAS/WAS, SVI) and self-quiz until 90 percent recall

Your checkpoint

A two-column side-by-side process-flow diagram of the drinking water and wastewater trains, each stage annotated with parameters and governing limit type, plus the completed 40-term glossary

Week 2

Drinking Water Treatment and Distribution

  • Calculate chlorine dose, demand, and residual for at least five practice scenarios and explain how pH and temperature shift CT credit

  • Compute filter loading rate, backwash rate, and run time from given plant data, and identify when a rate exceeds typical design guidance

  • Explain coagulation jar-test interpretation and dose adjustment logic for a turbidity upset

  • Convert between common units (mg/L to lb/MG, gpm to MGD, psi to feet of head) without a reference sheet

Your checkpoint

A worked problem set of 20 calculations spanning disinfection, filtration, and unit conversion, with every step shown and answers checked

Week 3

Wastewater Treatment and Collection

  • Calculate BOD, TSS, and solids-loading values from given lab and flow data, and explain what each result implies for process control

  • Interpret SVI, MLSS, and sludge age to decide whether to increase or decrease wasting

  • Diagnose three classic secondary-treatment upsets (bulking, pin floc, rising sludge) from a described set of observations and prescribe a corrective action for each

  • Describe collection-system capacity problems (infiltration/inflow, SSOs) and the inspection or flow-monitoring response

Your checkpoint

Three written troubleshooting case responses (one per upset) each naming the likely cause, the supporting evidence, and a specific corrective action with a follow-up measurement

Week 4

Water Quality Analysis, Sampling, and Reporting

  • Match each core lab method (turbidity, chlorine residual, pH, BOD, TSS, coliform) to its holding time, preservation requirement, and container type

  • Explain the difference between process control samples and compliance samples and why chain-of-custody matters for the latter

  • Interpret a set of results against an MCL or permit limit and state whether a repeat or confirmation sample is triggered

  • Identify the top five sampling errors that invalidate results and the field practice that prevents each

Your checkpoint

A sampling and reporting reference table covering at least eight analytes with method, container, preservation, holding time, and applicable limit, plus three worked result-interpretation scenarios

Week 5

Water Quality Analysis, Sampling, and Reporting & Regulations, Safety, and Administration

  • Outline the regulatory reporting chain for a drinking water system: monitoring, results review, public notification triggers, and CCR content

  • Outline the wastewater side: DMR submission, permit limit exceedance reporting, and bypass/upset notification duties

  • List the recordkeeping and operator certification requirements that apply to daily operations, including who may sign reports

  • Explain the difference between an MCL, a treatment technique, and a monitoring/reporting violation and give one example of each

Your checkpoint

A one-page decision flowchart showing what an operator does after an out-of-limit result, from resampling through notification and documentation, for both water and wastewater

Week 6

Regulations, Safety, and Administration

  • Identify confined-space, lockout/tagout, and electrical hazards in a treatment plant and state the required control for each

  • Describe chemical handling and storage rules for chlorine, fluoride, and treatment polymers, including secondary containment and PPE

  • Explain the reporting obligations and immediate actions for a chlorine release or a sewer overflow

  • Apply the hierarchy of controls to three realistic plant accident scenarios and rank the corrective measures

Your checkpoint

A hazard-and-control matrix covering at least ten plant hazards with the required control, the governing rule or standard, and the first response action

Week 7

Drinking Water Treatment and Distribution & Wastewater Treatment and Collection & Regulations, Safety, and Administration

  • Re-solve missed calculation types from weeks 2 and 3 until each is correct twice in a row without notes

  • Answer 60 mixed practice questions across all four domains under timed conditions and log every miss by domain and cause

  • Review the ten most-missed items and write the underlying rule or formula in your own words

  • Walk through two full operational scenarios (a turbidity exceedance and a permit exceedance) end to end, including reporting

Your checkpoint

A timed 60-question practice set with a scored answer log, a ranked list of weak areas, and a written correction note for the ten most-missed items

Week 8

Drinking Water Treatment and Distribution & Wastewater Treatment and Collection & Water Quality Analysis, Sampling, and Reporting & Regulations, Safety, and Administration

  • Re-drill every weak area identified in week 7 until each is answered correctly twice

  • Recite from memory the key limits, holding times, and formulas on a single self-made sheet

  • Complete two full-length timed practice exams and compare scores to the week 7 baseline

  • Confirm exam-day logistics: registration, ID, allowed references, and calculator policy

Your checkpoint

Two completed timed practice exams with scores, a final one-page formula and limits sheet, and a written list of remaining weak areas with a review plan for the final days

Milestones

Week 2: Can complete disinfection, filtration, and unit-conversion calculations unaided and explain CT credit dependence on pH and temperature

Week 4: Can state holding time, preservation, and container for at least eight core analytes and correctly judge whether a result triggers resampling

Week 6: Can name the required control for ten plant hazards and describe the notification chain after an out-of-limit result or release

Week 8: Scored at least 80 percent on both timed practice exams with no domain below 70 percent, and can reproduce the formula and limits sheet from memory