NICET ITFAS Level II cheat sheet
NICET ITFAS Level II · Keep the key ideas within reach.
Inspection and Testing of Fire Alarm Systems
Testing follows NFPA 72 Chapter 14 (Inspection, Testing, and Maintenance); record results on a fire alarm system record of completion and inspection/test forms per the applicable tables.
Acceptance testing is required for new systems and for modifications, repairs, or additions; the scope of retest is limited to affected devices plus verification that the system still functions as designed.
Initiating devices must be tested at their installed location using a listed test method (smoke: aerosol/calibrated test smoke or manufacturer method; heat: listed heat source). Magnets or jumpers alone are not acceptable substitutes for smoke entry testing.
Smoke detector sensitivity must be verified within the listed range (typically 0.5 to 4.0 percent per foot obscuration); detectors found outside the range must be cleaned, recalibrated, or replaced and retested.
Notification appliance testing verifies audibility and intelligibility: sound pressure at least 15 dBA above average ambient or 5 dBA above maximum ambient (whichever is greater), and 10 dBA above ambient in sleeping areas with 520 Hz low-frequency requirements where adopted.
Battery calculations must show capacity for 24 hours of standby plus 5 minutes of alarm (or 4 minutes for emergency voice systems where permitted); measure charging voltage and load-test batteries to confirm performance.
Inspection frequency minimums: annual for most initiating devices, notification appliances, and control equipment; semiannual for supervising station and remote station functions; quarterly for batteries; monthly for certain supervising station and in-building fire emergency voice systems.
Ground fault and open/short circuit conditions must be verified as annunciated at the control unit; test each initiating device circuit and notification appliance circuit for trouble response.
Interconnected systems and releasing service circuits require testing of cross-zone logic, time delays, abort switches, and discharge verification; document each sequence step in the test record.