NICET ITFAS Level II study materials
NICET ITFAS Level II study resources

NICET ITFAS Level II flashcards

NICET ITFAS Level II · Build recall with a focused review session.

33 cards. Read the term and the definition here. The deck at the top of this page is optional.

Acceptance test purpose
Verifies that a newly installed or modified fire alarm system complies with its design, is installed per the plans, and functions as intended before being placed into service.
Record of completion
A document completed at installation and updated at acceptance testing that lists system features, device counts, and signatures of the installer and the authority accepting the system.
Smoke detector sensitivity range
Listed smoke detectors typically must respond within 0.5 to 4.0 percent per foot obscuration; readings outside this range require cleaning, recalibration, or replacement followed by retest.
Smoke entry test
Testing that introduces aerosol or listed test smoke into the detector chamber to verify alarm response; magnet or jumper tests only verify wiring and are not substitutes for smoke entry testing.
Heat detector test method
Applying a listed heat source or manufacturer-approved method at the installed detector to confirm it operates at its rated temperature and before reaching its maximum listing threshold.
Audibility requirement
Alarm sound must exceed average ambient by at least 15 dBA, or exceed maximum ambient by 5 dBA, whichever is greater, measured at the required locations.
Sleeping area sound level
In sleeping areas, the alarm must produce at least 75 dBA at the pillow level, or 15 dBA above ambient, and low-frequency 520 Hz sounders are required where adopted.
Intelligibility testing
Verification that voice messages are understandable at occupied locations, typically measured using speech transmission index or common intelligibility scale methods per the design.
Standby battery duration
Secondary batteries must support 24 hours of standby followed by 5 minutes of alarm load, or 4 minutes for emergency voice alarm systems, unless a longer time is required.
Battery load test
Discharging the battery under a measured load to confirm it delivers at least 80 percent of rated capacity; batteries failing this criterion must be replaced and the calculation rechecked.
Annual testing interval
Most initiating devices, notification appliances, and control units must be inspected or tested at least annually, with the results documented on the inspection and testing form.
Semiannual supervising station test
Supervising station and remote station functions, including signal transmission and processing, must be tested at least semiannually to confirm correct reporting to the off-site location.
Quarterly battery inspection
Batteries are inspected quarterly for corrosion, terminal tightness, electrolyte level where applicable, and charging voltage, with results recorded on the inspection form.
Ground fault test
Introducing a controlled ground fault on a circuit to confirm the control unit annunciates the trouble condition and identifies the affected circuit.
Open circuit test
Opening an initiating device circuit or notification appliance circuit to verify the control unit reports a trouble condition within the required time.
Cross-zone logic test
Verifying that a releasing or suppression system activates only after the required combination of detectors operates, with the correct time delay and sequence.
Abort switch test
Confirming that activating the abort switch during the release countdown halts discharge and that the abort function resets properly after the event.
Notification appliance circuit voltage
Measured voltage at the end of the circuit must meet the appliance listing and manufacturer tolerance under alarm load, confirming wiring loss is within design limits.
Inspection versus testing
Inspection is a visual check of condition and installation; testing is the functional operation of a device or system to confirm performance against its listing and design.
Test plan contents
A written test plan identifies devices to be tested, test methods, sequence, personnel, and documentation requirements, and is reviewed before testing begins.
Detector cleaning interval
Smoke detectors are cleaned per manufacturer instructions when sensitivity testing shows drift or when the environment warrants; cleaning is followed by sensitivity retest.
Duct smoke detector test
Testing by introducing smoke or listed aerosol into the duct sampling tubes and confirming detector alarm and correct supervisory fan shutdown response.
Waterflow switch test
Operating the inspector's test valve or bypass to simulate flow and confirming alarm initiation within the required time, typically 90 seconds or less.
Valve tamper switch test
Partially closing a supervised control valve to confirm the tamper switch reports a supervisory signal to the control unit and identifies the valve.
Supervisory signal test
Verifying that off-normal conditions such as valve closure, low air pressure, or power loss annunciate as supervisory signals distinct from alarm and trouble signals.
Trouble signal response time
The control unit must annunciate a trouble condition within 200 seconds of the fault occurring, and the trouble must be recorded and displayed.
Alarm signal response time
The control unit must process and annunciate an alarm signal within 10 seconds of receipt from a detector or initiating device, unless otherwise listed.
Remote annunciator test
Confirming that each remote annunciator displays alarm, supervisory, and trouble conditions correctly and that its controls function as intended.
Reacceptance test
Testing required after system modification, repair, or addition; it covers affected components plus verification that the overall system still operates as designed.
Documentation retention
Inspection, testing, and maintenance records must be retained and made available to the authority having jurisdiction for a period specified by code or local requirement.
Impedance measurement
Measuring circuit resistance or impedance to verify wiring is within design limits and that notification appliances receive adequate voltage under worst-case alarm load.
Visual inspection scope
Checking device mounting, labeling, accessibility, damage, contamination, and proper installation location without operating the device; deficiencies are logged for correction.
Test record signatures
Inspection and testing forms must be signed by the person performing the work and by a representative of the owner, with dates and results recorded for each device.