NRCA Tile Installer study materials
NRCA Tile Installer study resources

NRCA Tile Installer study plan

NRCA Tile Installer · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Safety, Fall Protection, and Jobsites & Flashings, Penetrations, and Waterproofing Details

  • Identify the fall-protection threshold heights and duty categories that trigger guardrail, safety-net, or personal fall-arrest use on tile roofs, and state which system applies to a given pitch and eave condition.

  • Demonstrate correct inspection and donning sequence for a full-body harness, lanyard, and anchor point, listing three defects that require removing a component from service.

  • Locate and describe the required placement of roof jacks, staging planks, and ladder tie-offs for a two-story tile tear-off, including toe board and debris-chute setup.

  • Explain how valley, step, and counterflashing interfaces create water-entry paths, and sketch the correct lap sequence where a sidewall flashing meets a tile field.

Your checkpoint

A one-page jobsite safety and flashing-interface checklist you write from memory, covering fall-protection triggers, harness inspection points, staging setup, and the lap order for sidewall-to-field flashing.

Week 2

Roof Deck, Underlayment, and Substrate Preparation & Tile Materials, Types, and Standards

  • Evaluate roof deck conditions against acceptance criteria for sheathing thickness, fastener spacing, and deflection, and list the corrective actions for each deficiency found.

  • Compare tile underlayment options by material, weight, and intended slope range, and select the correct product for a 4:12 and a 2.5:12 application.

  • Classify clay, concrete, and interlocking tile by body type, water absorption, and breakage pattern, and state where each is appropriate.

  • Identify the ASTM and code references that govern tile quality, freeze-thaw durability, and fastening, and explain what each standard actually controls.

Your checkpoint

A comparison table of at least four underlayment products and three tile types with slope limits, applicable standards, and a one-line selection rule for each.

Week 3

Flashings, Penetrations, and Waterproofing Details

  • Detail the correct installation sequence for valley flashing, pan flashing, and counterflashing on a chimney, including height above the roof surface and weep provisions.

  • Explain how to flash a plumbing vent, skylight curb, and sidewall penetration through a tile roof, and describe how tile is cut and nested around each.

  • Describe the role of a batten or counter-batten system in drainage and how it interacts with underlayment laps and flashing terminations.

  • Diagnose three common water-intrusion failure modes at penetrations and state the corrective detail for each.

Your checkpoint

A hand-drawn detail set of four penetrations (chimney, vent, skylight curb, sidewall) with labeled flashing layers, lap directions, and heights.

Week 4

Tile Layout, Attachment, and Fastening & Eaves, Rakes, Hips, Ridges, and Valleys

  • Lay out a roof for tile using course gauge, side lap, and coverage calculations, and verify the layout against a given roof plan with hips and valleys.

  • Specify the correct fastener type, length, and penetration depth for tile attachment on a wood deck, and state when adhesive or mortar setting replaces mechanical fastening.

  • Detail the installation of eave closure, rake trim, hip and ridge tile, and open or closed valley treatment, and explain the order of operations for each.

  • Explain how valley lining width and tile cutting at the valley centerline differ between open and woven valleys, and select the correct approach for a given tile profile.

Your checkpoint

A complete layout worksheet for a roof with two hips and one valley: course gauge, tile count per course, fastener schedule, and a step-by-step order of operations from eave to ridge.

Week 5

Steep-Slope and Low-Slope Tile Applications & Safety, Fall Protection, and Jobsites

  • Distinguish steep-slope from low-slope tile applications by slope break, and state the underlayment and attachment requirements that change at that break.

  • Describe a low-slope tile assembly over a membrane or hot-applied system, including how tile is adhered or set and how movement is accommodated.

  • Explain how snow guard, eave ice-dam protection, and high-wind fastening requirements change the attachment plan on steep-slope tile roofs.

  • Rehearse a rescue-from-height plan for a worker suspended in fall arrest, and list the post-fall-arrest steps required before returning equipment to service.

Your checkpoint

A written scenario response: given a 3:12 roof in a high-wind, freeze-thaw climate, specify underlayment, attachment method, eave protection, and fall-protection plan with justification for each choice.

Week 6

Repair, Restoration, and Maintenance & Print Reading, Estimating, and Code Compliance

  • Perform a systematic roof inspection and document findings by defect type: cracked tile, slipped tile, failed flashing, deteriorated underlayment, and fastener corrosion.

  • Write a repair scope for a localized leak that identifies the minimum removal area, matching tile sourcing, and the flashing steps required to restore the assembly.

  • Read a roof plan and section drawing to extract slope, ridge and valley locations, penetration count, and flashing details, and convert those into a takeoff.

  • Calculate tile quantity, underlayment square footage, and fastener counts from a takeoff, applying waste factors appropriate to roof complexity.

Your checkpoint

A takeoff and repair scope for a sample roof plan: measured quantities with waste, a defect list from a described inspection, and a priced repair sequence.

Week 7

Print Reading, Estimating, and Code Compliance & Flashings, Penetrations, and Waterproofing Details & Tile Layout, Attachment, and Fastening

  • Map each major code requirement for tile roofing to its source and explain what an inspector will check on site for that requirement.

  • Resolve three code-compliance conflicts between manufacturer instructions and local code, and state the governing rule and documentation needed.

  • Re-derive the flashing and fastening details from weeks 3 and 4 without notes, and correct any errors found in your own earlier work.

  • Explain the permit and inspection sequence for a tile reroof, including what must be visible at each inspection stage.

Your checkpoint

A code cross-reference sheet listing at least ten tile-roof requirements with their source and the on-site verification method for each.

Week 8

Safety, Fall Protection, and Jobsites & Roof Deck, Underlayment, and Substrate Preparation & Tile Materials, Types, and Standards & Flashings, Penetrations, and Waterproofing Details & Tile Layout, Attachment, and Fastening & Eaves, Rakes, Hips, Ridges, and Valleys & Steep-Slope and Low-Slope Tile Applications & Repair, Restoration, and Maintenance & Print Reading, Estimating, and Code Compliance

  • Complete a full-length timed practice exam and score each domain separately to identify remaining weak areas.

  • Re-teach your two weakest domains from memory using your own notes, then verify against source material and correct misconceptions.

  • Review all deliverables from weeks 1 through 7 and consolidate them into a single indexed reference you can study from in the final days.

  • Build a test-day plan covering arrival, materials allowed, time allocation per question, and a strategy for flagging and returning to uncertain items.

Your checkpoint

A scored practice exam with a domain-by-domain error analysis and a consolidated final-review index of all prior deliverables.

Milestones

Week 2: You can state the fall-protection trigger conditions and the correct flashing lap order without notes, and you can select the right underlayment and tile type for a given slope and climate.

Week 4: You can produce a complete tile layout for a roof with hips and valleys, including gauge, counts, fastener schedule, and order of operations, with no reference material open.

Week 6: You can read a roof plan, extract quantities with waste, and write a repair scope that names the defect, the removal area, and the flashing steps.

Week 8: Practice exam score by domain shows no domain below 70 percent, and your consolidated index covers all nine domains with at least one worked example each.