CEA study materials
CEA study resources

CEA study plan

CEA · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Developing an Energy Audit Strategy & Plan & Energy Use Analysis

  • Draft a full audit strategy outline that names the audit level (walk-through, targeted, or comprehensive) and justifies that choice from the client's stated objectives and budget.

  • Build a work-breakdown checklist that sequences pre-site document requests, site survey tasks, metering duration, and reporting milestones against a calendar.

  • Define the audit boundary and baseline year in writing, listing which energy streams (electric, gas, chilled water, steam) are inside the boundary.

  • Compute a whole-facility energy intensity metric and break total consumption into end-use categories using a first-pass estimate.

  • Assemble a stakeholder and data-owner contact map covering facility staff, utility account reps, and controls vendors.

Your checkpoint

A two-page audit plan document containing scope, boundary, level justification, task schedule, and a first-pass end-use breakdown table.

Week 2

Data Collection & Analysis & Economic Analysis

  • Write a data-collection request list specifying interval, duration, and responsible party for each meter and submeter.

  • Build a spreadsheet template that imports 15-minute interval data and flags gaps, zero-runs, and out-of-range values.

  • Practice screening utility bills for rate-structure mismatches, power factor charges, and demand ratchets.

  • Calculate simple payback, net present value, and internal rate of return for three sample measures at two different discount rates.

  • Explain to a hypothetical client why a measure with a long payback can still clear a hurdle rate when energy escalation is included.

Your checkpoint

A working analysis spreadsheet with one cleaned interval dataset, a data-quality log, and a lifecycle cost comparison of three measures.

Week 3

Lighting Systems & Heating, Ventilation & Air Conditioning Systems

  • Compute lighting power density for a sample space and compare it against an applicable code or benchmark value.

  • Estimate annual energy savings from replacing a specified lamp-and-ballast combination with an LED alternative, including hours-of-use assumptions.

  • Sketch a simplified HVAC system schematic from a set of written equipment nameplate and sequence-of-operation notes.

  • Calculate fan and pump power at varying flow using affinity laws, and state the savings implication of a variable-speed drive.

  • Identify three economizer or ventilation-control opportunities and quantify each with an outside-air and enthalpy assumption.

Your checkpoint

A measure sheet for two lighting and two HVAC measures, each with baseline, proposed condition, savings calculation, and cost estimate.

Week 4

Domestic Hot Water Systems & Motors & Drives & Compressed Air Systems

  • Estimate domestic hot water load from fixture counts and occupancy, then compare the estimate to metered gas or electric input.

  • Evaluate a solar thermal or heat-pump water heater option against the existing system on a life-cycle basis.

  • Build a motor inventory template capturing horsepower, load factor, hours, and duty cycle.

  • Calculate compressed-air leak load from a no-load compressor run test and convert it to annual cost.

  • Size the savings from reducing compressed-air header pressure and from adding a VSD compressor, stating assumptions.

Your checkpoint

A motor and compressed-air opportunity register with at least six line items, each carrying estimated kWh and dollar savings.

Week 5

Building Envelope & BAS, PAS, and EMCS

  • Estimate envelope heat loss through walls, roof, and glazing using a documented U-value assumption set.

  • Quantify infiltration savings from an air-sealing measure using a degree-day method.

  • Map a building automation system point list to the sequences it controls and flag three scheduling or setback opportunities.

  • Describe how to trend-log a BAS point and use the resulting data to verify a measure's savings.

  • Draft a measurement-and-verification approach for one measure, naming the baseline, boundary, and adjustment method.

Your checkpoint

A one-page M&V plan for a single measure plus an envelope and controls opportunity list with calculations.

Week 6

Alternative Generation & Storage & Transport

  • Screen a solar PV, battery storage, and combined heat-and-power option against the facility load profile.

  • Calculate simple payback and levelized cost of energy for a PV array using a stated capacity factor and incentive.

  • Build a fleet fuel and utilization baseline for a sample vehicle fleet.

  • Evaluate one fleet measure such as telematics, route optimization, or electrification, and state the boundary conditions.

  • Identify the demand-charge and resilience value that storage can provide and explain how to monetize each.

Your checkpoint

An alternatives screening memo comparing three generation or storage options and one transport measure on cost and emissions.

Week 7

Developing an Energy Audit Strategy & Plan & Economic Analysis

  • Consolidate all measure sheets into a single prioritized table ranked by cost of conserved energy.

  • Re-run each measure's economics under a low, base, and high energy-price scenario.

  • Write the executive summary of a mock audit report in under 400 words with a clear recommendation.

  • Build a chart pack showing baseline end-use split, savings by measure, and cumulative cash flow.

  • Peer-review the report against a self-made checklist covering assumptions, units, and traceability.

Your checkpoint

A complete mock audit report draft with executive summary, prioritized measure table, scenario analysis, and chart pack.

Week 8

Energy Use Analysis & Data Collection & Analysis & Lighting Systems & Heating, Ventilation & Air Conditioning Systems & Domestic Hot Water Systems & Motors & Drives & Compressed Air Systems & Building Envelope & BAS, PAS, and EMCS & Alternative Generation & Storage & Transport

  • Take two full-length timed practice exams and log every missed item by domain.

  • Re-derive the ten formulas you missed most often, including payback, NPV, affinity laws, and degree-day savings.

  • Rewrite your weakest three measure sheets so each assumption is sourced or explicitly flagged.

  • Deliver a 15-minute verbal walkthrough of the mock report to a colleague or recorded session, defending the top three recommendations.

Your checkpoint

A scored practice-exam log with a remediation list, plus a final revised report and a one-page formula sheet.

Milestones

Week 2: You can clean a raw interval dataset and defend a lifecycle cost comparison without referring to notes.

Week 4: You have four completed measure sheets spanning lighting, HVAC, water heating, and motors or compressed air, each with traceable assumptions.

Week 6: You can screen a generation or storage option and a transport measure on cost and emissions in under 30 minutes.

Week 8: Practice-exam scores are stable across two attempts and every missed domain has a written remediation action.