NV Fire Sprinkler · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Fire Sprinkler System Design and Hydraulic Calculations

  • Derive the density/area relationship for light, ordinary, and extra hazard occupancies from NFPA 13 hazard classifications and state the design density and area for each of the six occupancy groups from memory.

  • Calculate required sprinkler flow (gpm) and pressure (psi) for a single sprinkler head given K-factor, density, and spacing, working ten practice problems without a formula sheet.

  • Compute the hydraulic demand of a simple tree system by hand using the Hazen-Williams friction loss formula, showing every step from the most remote head to the base of the riser.

  • Explain the difference between pipe schedule sizing and hydraulic calculation, and identify the four conditions under which NFPA 13 permits pipe schedule sizing.

  • Build a one-page reference card listing density/area curves, K-factors, and common C-values for steel, copper, and CPVC pipe.

Your checkpoint

A hand-worked hydraulic calculation packet for a one-story ordinary hazard (Group 2) building: 12 heads, tree layout, showing density, remote area size, friction loss per segment, elevation, and total system demand at the riser base, with all steps shown.

Week 2

Fire Sprinkler System Design and Hydraulic Calculations & NFPA 13 Installation Requirements and System Components

  • Solve five pump-and-city-supply combination problems where the available supply curve must be compared against the demand curve, and determine whether a pump is required.

  • Calculate sprinkler spacing, maximum protection area per head, and minimum distance from walls for standard spray, sidewall, and extended-coverage heads per NFPA 13 tables.

  • Identify the required hydraulic placard contents and verify a sample calculation against NFPA 13 requirements for the hydraulic design information sign.

  • Diagram a wet-pipe riser assembly from memory, labeling the check valve, alarm valve, main drain, test valve, flow switch, gauges, and inspector's test connection in correct order.

  • Explain how a dry-pipe system's hydraulic calculation must account for air pressure and the dry-pipe valve friction loss, and compute a simple dry-pipe example.

Your checkpoint

A complete hydraulic design summary for a two-story building (ordinary hazard Group 1) including a hand-drawn riser diagram, a node-by-node calculation table, and a written determination of whether a fire pump is needed given a stated city supply curve.

Week 3

NFPA 13 Installation Requirements and System Components

  • List the NFPA 13 requirements for sprinkler obstructions (18-inch rule, 3x rule for structural members, and obstruction distances) and apply them to three sketch scenarios.

  • Specify the correct sprinkler temperature rating and response type (quick, standard, special) for given occupancy and ceiling conditions, citing the applicable NFPA 13 table.

  • Determine hanger spacing, rod size, and seismic bracing requirements for Schedule 40 steel pipe in a given bay width and building height, per NFPA 13 Chapter 17.

  • Trace the acceptance test sequence for a new wet-pipe system: hydrostatic test pressure and duration, flushing, flow test, and main drain test, with pass/fail criteria.

  • Identify the required clearances for sprinklers relative to ceilings, walls, and storage, and calculate minimum clearance for a rack storage scenario.

Your checkpoint

A 20-item obstruction and spacing audit checklist applied to a written description of a warehouse layout, with each item marked compliant or noncompliant and the specific NFPA 13 section cited.

Week 4

Water Supply, Pumps, and Standpipe Systems

  • Compute net positive suction head available (NPSHa) for a fire pump drawing from a ground-level tank and from a city main, and compare to the pump's NPSHr.

  • Read a fire pump performance curve and determine churn pressure, rated flow, 150% overload flow, and the maximum allowable shutoff pressure per NFPA 20.

  • Explain the acceptance test requirements for a fire pump, including the 150% flow test duration, and identify the four test points recorded.

  • Size a standpipe system for a five-story building, selecting Class I, II, or III, and determine the minimum residual pressure at the topmost outlet.

  • Describe the requirements for a fire department connection, including location, height, pipe size, and the check valve arrangement.

Your checkpoint

A water supply analysis memo for a fictitious project: pump curve plotted against a stated city supply curve, NPSH calculation, required fire flow, and a written recommendation on pump selection and standpipe classification.

Week 5

Inspection, Testing, and Maintenance (NFPA 25)

  • Build a monthly, quarterly, annual, and 5-year ITM task matrix from NFPA 25 for wet-pipe, dry-pipe, and standpipe systems, listing the specific task at each frequency.

  • Explain the main drain test procedure, the expected static and residual pressure readings, and how to interpret a pressure drop indicating a supply problem.

  • Describe the dry-pipe valve trip test procedure, including the required frequency, and identify the conditions that require an internal inspection.

  • Interpret a failed flow test result and list the diagnostic steps in order, from the inspector's test connection back to the water supply.

  • Distinguish between an impairment and a deficiency under NFPA 25, and state the required notification and corrective action timeline for each.

Your checkpoint

A completed one-page NFPA 25 annual inspection form for a wet-pipe system plus a written interpretation of three given test readings (main drain, flow switch, and gauge) identifying which are deficiencies and what action each requires.

Week 6

Nevada Contractor Licensing, Business, and Law & Nevada State Fire Code and Local Amendments

  • List the Nevada State Fire Marshal licensing requirements for a fire sprinkler contractor, including the license classification, qualifying party requirements, and renewal cycle.

  • Explain the Nevada contractor licensing rules on bid limits, the requirement for a qualifier to be actively engaged, and the consequences of unlicensed contracting.

  • Identify the key Nevada-specific amendments to the adopted fire code, including any local sprinkler thresholds for one- and two-family dwellings and small commercial occupancies.

  • Describe the permit and plan review process for a fire sprinkler installation in a Nevada jurisdiction, including who may submit and what inspections are required.

  • Summarize Nevada lien law basics and contract requirements applicable to fire protection subcontractors, including notice requirements.

Your checkpoint

A Nevada compliance one-pager covering licensing, permit submission, and inspection sequence for a sample installation, plus ten practice questions you write yourself on Nevada contractor law with cited answers.

Week 7

Safety, Plans, and Jobsite Administration & NFPA 13 Installation Requirements and System Components

  • Produce a job hazard analysis for a sprinkler installation task involving overhead work, pipe cutting, and ladder or lift use, identifying controls for each hazard.

  • Explain the plan review submittal requirements under NFPA 13, including what working plans must show and the qualifications of the person preparing them.

  • Describe the sequence of inspections required during construction and the conditions that must be met before each is signed off.

  • Identify the record-keeping and as-built documentation required at project closeout, including the material and test certificate.

Your checkpoint

A complete working-plan submittal package outline for a small commercial project: title sheet contents, plan view requirements, riser detail list, and a signed-off inspection sequence checklist.

Week 8

Special Occupancies and Alternative Suppression Systems & Fire Sprinkler System Design and Hydraulic Calculations & Inspection, Testing, and Maintenance (NFPA 25)

  • Compare the design criteria for residential sprinklers, ESFR, and CMSA sprinklers, stating where each is permitted and the key density and pressure differences.

  • Explain the requirements for clean agent, water mist, and foam-water systems and identify the occupancies where each is an acceptable alternative to a standard sprinkler system.

  • Complete a timed 100-question mixed practice exam covering all eight domains and score your performance by domain to identify remaining weak areas.

  • Re-derive the density/area selection and one full hydraulic calculation from memory as a final retention check.

  • Review all previously missed practice questions and write a corrected explanation for each.

Your checkpoint

A scored 100-question practice exam with a domain-by-domain breakdown, a list of your three weakest domains, and a written 30-day remediation plan for each.

Milestones

Week 2: Complete a full hand hydraulic calculation for a 12-head tree system end to end, with correct density/area selection, friction loss, elevation, and total demand, verified against an independent check calculation.

Week 4: Correctly determine whether a fire pump is required for a given city supply curve and plot the pump curve against the demand curve, with NPSH verified, scoring at least 8 of 10 on a self-written quiz covering Domains 1 and 3.

Week 6: Score at least 80% on a 40-question mixed quiz covering Domains 1, 2, 3, 4, 5, and 6, with no domain below 70%, and have the Nevada licensing one-pager complete.

Week 8: Score at least 75% overall on the 100-question timed practice exam and at least 70% in every domain, with a written remediation plan for any domain below 80%.