Mistake 1

Treating a passing score on practice quizzes as proof of readiness and never drilling the calculation set (drawdown, specific capacity, well yield per foot of screen, chlorine dose to reach a target ppm, grout volume for annular seal), then freezing when a numeric item appears on the exam.

Most study time gets spent reading narrative material because it feels productive; calculations are avoided because they expose gaps. The candidate memorizes concepts but never builds fluency with unit conversions (gpm to gpd, feet to gallons per foot of casing, ounces of hypochlorite per volume of water).

What to do instead

Build a one-page formula sheet and work 10 numeric problems per study session, showing every unit. Practice converting between gpm, gpd, gallons per foot of 4-inch, 6-inch, and 8-inch casing, and between pounds and gallons of sodium hypochlorite at common strengths. Time yourself so the arithmetic is automatic before exam day.

Mistake 2

Answering regulatory items from general industry habit or from another state's rules rather than from New York-specific requirements, e.g., assuming a default casing depth, a default grout type, or a default setback distance without checking the actual NYS well construction and permitting framework.

Candidates often trained or worked in neighboring states or learned on the job from a single company's practice. Company habit and state minimums diverge, and the exam tests the regulatory floor, not the employer's standard.

What to do instead

Study the current New York well construction requirements and the state permit/notification process as a standalone topic. Make a comparison table of 'what my company does' versus 'what the regulation requires' and resolve every discrepancy. When a question asks for a minimum or maximum, look for the regulatory number, not the typical field number.

Mistake 3

Confusing the purpose and sequence of well development, testing, and disinfection, e.g., disinfecting before development is complete, or pumping a yield test before the well is properly developed, and then selecting answers that reflect that wrong order.

In the field these steps sometimes get compressed under schedule pressure, so the candidate's mental model is a jumble. Exam items that hinge on sequence look like vocabulary questions but are really about process logic.

What to do instead

Memorize the sequence as a chain: drill, set casing and screen, grout seal, develop until sand and turbidity clear, disinfect and allow contact time, then test yield and water quality. For each step, write one sentence on what it accomplishes and what goes wrong if it is skipped or reordered. Practice items that ask 'what should happen next' and justify the answer by the step's purpose.

Mistake 4

Mixing up drilling methods and the formations and conditions each suits, so the candidate picks a mud rotary answer for a boulder-filled glacial till or an air rotary answer for a situation calling for casing advance, without reasoning about hole stability, sample quality, and contamination risk.

Many candidates have hands-on experience with only one or two rig types and generalize from that. The exam tests selection reasoning across methods, and the distractors are plausible because each method does work somewhere.

What to do instead

Build a method-selection matrix: method versus formation type, hole stability, depth capability, sample quality, water use, and suitability for contaminated or potable supply work. For each method, write the one condition under which it is clearly the best choice and the one condition where it fails. Practice scenario items by naming the controlling condition first, then the method.

Mistake 5

Ignoring the hydrogeologic setting when answering siting or design questions, e.g., choosing a screen slot or gravel pack without reference to the grain-size distribution of the formation, or predicting yield without considering aquifer type, confining layers, and recharge.

Siting and design items read like construction questions, so candidates answer from construction memory and skip the geology step. They also under-use grain-size analysis and pump-test interpretation because those feel academic.

What to do instead

For every design item, first state the aquifer type, the formation material, and the confining conditions, then let that drive screen slot, gravel pack, and casing decisions. Practice reading grain-size curves and pump-test drawdown data and drawing conclusions. Know how confined and unconfined aquifers differ in storativity, drawdown behavior, and sustainable yield.

Mistake 6

Treating well abandonment as 'fill the hole with something' instead of a designed, documented procedure, and therefore missing items about seal placement, annular space, casing removal or perforation, and the required record of the work.

Abandonment is low-frequency field work for many drillers, so the details are unfamiliar and the candidate defaults to intuition. The regulatory and environmental reasoning behind proper sealing is rarely discussed on the job.

What to do instead

Study abandonment as a full procedure: what must be removed, where seals go, what material is acceptable, how the seal is verified, and what gets reported. Write out the cross-section of a properly abandoned well from memory. Connect each step to its purpose, especially preventing interaquifer migration and surface contamination.

Mistake 7

Answering pump and controls items by equipment familiarity rather than by system reasoning, e.g., sizing a pump from horsepower alone without matching to well yield, drawdown, total dynamic head, and the pump setting depth relative to the pumping water level.

Experienced candidates know the pumps they install and answer from that pattern. The exam tests whether the candidate can defend a sizing decision against well capacity and hydraulic limits, and familiarity shortcuts that reasoning.

What to do instead

Practice full pump-sizing problems end to end: static water level, drawdown at design yield, pump setting depth, total dynamic head including lift and friction, and the check that the pump does not out-pump the well. Learn the purpose of each control (pressure switch, cycle stop, low-level cutoff, pitless adapter) and the failure each one prevents.

Mistake 8

Underestimating safety and environmental items as common sense and skipping the specific hazards: confined space entry, electrical lockout, hydrogen sulfide and other gases, rig stability and overhead lines, silica dust, and the spill and containment obligations that come with drilling fluids and fuel.

Candidates assume safety questions are obvious and spend study time on technical content. The exam tests specific controls and decision points, and 'common sense' answers are often the plausible but incomplete option.

What to do instead

Study safety as a technical domain: for each hazard, know the specific control, the monitoring or permit requirement, and the stop-work trigger. Practice items by identifying the hazard first, then the control hierarchy, then the documentation. Include spill prevention, containment, and reporting for fuels and drilling additives.

Mistake 9

Confusing the driller's reporting and notification duties with the client's or the agency's, so the candidate misassigns who files what, when notice is required before work begins, and what the well completion report must contain.

On the job, office staff handle paperwork, so the driller never internalizes the reporting chain. Exam items test the driller's specific obligations and the timing of each submission.

What to do instead

Create a one-page obligations table: action, who is responsible, when it is due, and to whom it goes, covering pre-drilling notice, completion reports, water quality results, and abandonment records. Practice items that ask 'who is responsible' and 'by when' by checking the table logic rather than memory.

Mistake 10

Answering water quality and disinfection items by target chlorine number alone, ignoring contact time, pH, turbidity and chlorine demand, and the difference between disinfecting a well and disinfecting a distribution system, then choosing an answer that would fail in the field.

Chlorine dosing looks like a single formula, so candidates memorize a concentration and stop there. The exam tests whether the candidate understands why a dose fails, which is usually demand, contact time, or poor cleaning before disinfection.

What to do instead

Study disinfection as a process: clean and develop first, calculate dose from the water volume in the well and system, account for chlorine demand, maintain the target residual for the required contact time, then flush and verify with a bacteriological sample. Practice dose problems that include demand so the answer is not just concentration times volume.