NY Well Driller study materials
NY Well Driller study resources

NY Well Driller flashcards

NY Well Driller · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Static water level
The level at which water stands in a well when the pump is off and the water has recovered to equilibrium.
Drawdown
The difference between the static water level and the pumping water level in a well during pumping.
Specific capacity
Pumping rate divided by drawdown, usually expressed in gallons per minute per foot (gpm/ft); a measure of well performance.
Transmissivity
The rate at which water is transmitted through a unit width of aquifer under a unit hydraulic gradient; equals hydraulic conductivity times saturated thickness.
Cone of depression
The downward-curved water table or potentiometric surface around a pumping well caused by drawdown.
Annular seal
The grouted space between the well casing and the borehole wall, placed to prevent surface and shallow groundwater from entering the well.
Tremie grouting
Placing grout by pumping it from the bottom of the annular space upward so the casing is sealed without voids.
Sanitary well seal
A watertight, vented cap at the top of the casing that excludes surface water, insects, and debris while allowing access.
Pitless adapter
A fitting that lets the pump discharge line exit the casing below frost line while keeping the well sealed.
Gravel pack
A graded sand or gravel placed around a well screen in unconsolidated formations to reduce sand production and improve yield.
Mud rotary drilling
A rotary method using bentonite-based drilling fluid to cool the bit, lift cuttings, and stabilize the borehole.
Cable-tool drilling
A percussion method that advances a hole by repeatedly dropping a heavy bit and removes cuttings with a bailer.
Lost circulation
The loss of drilling fluid into a permeable or fractured formation, reducing cuttings return and hole stability.
Well development
The process of removing drilling fluid, cuttings, and fines from the formation around a well to improve yield and water clarity.
Constant-rate pump test
A test that pumps a well at a fixed rate while measuring drawdown over time to estimate yield and aquifer properties.
Well disinfection
Treating a well with a chlorine solution after construction or repair, holding contact time, then flushing before sampling.
Total coliform
A group of bacteria used as an indicator of sanitary quality; a positive result in a well signals possible contamination.
Pressure tank precharge
The air pressure in a pressure tank, typically set about 2 psi below the pump cut-in pressure to prevent rapid cycling.
Cut-in pressure
The low pressure setting at which the pressure switch starts the pump to restore system pressure.
Total dynamic head
The total head a pump must overcome, including static lift, drawdown, friction loss, and pressure head.
Submersible pump setting
The depth at which a submersible pump is installed, below the pumping water level but above the well bottom.
Check valve
A one-way valve on the pump discharge that prevents backflow and keeps the drop pipe primed.
Well abandonment
The permanent decommissioning of an unused well by sealing it with grout to prevent contamination of the aquifer.
Grout plug
A continuous seal of cement or bentonite placed in an abandoned well from bottom to top to block vertical water movement.
Abandonment record
Documentation of a well's decommissioning, including method, materials, volumes, and final condition, filed with the authority.
10 NYCRR Subpart 5-1
The New York State drinking water regulation that sets requirements for well construction, setbacks, and water quality for potable supplies.
Well completion report
A record filed after drilling that documents well location, depth, casing, screen, grout, yield, and water-quality results.
Well permit
An authorization from the local health department or DEC to construct a well, subject to setback, casing, and grouting conditions.
Call 811
The free utility-locating service that must be contacted before drilling to mark underground gas, electric, and communication lines.
Confined space entry
Entering a well pit or vault with limited access and possible hazardous atmosphere, requiring testing, ventilation, and a rescue plan.
Drilling fluid containment
On-site measures to contain and properly dispose of drilling mud and cuttings so they do not contaminate soil or surface water.
Lockout/tagout
An energy-isolation procedure used before servicing pumps or electrical controls to prevent accidental startup and injury.