NY Well Driller · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Well Siting, Geology, and Hydrogeology & Well Design and Construction

  • Explain how the local geology (bedrock type, overburden thickness, fractures) affects well siting and design, using at least two examples from your region.

  • Identify the key hydrogeologic parameters (transmissivity, storativity, hydraulic conductivity) and describe how they influence well yield and drawdown.

  • List the regulatory setback distances and isolation zone requirements for a residential well in New York, and describe how they affect the well location.

  • Describe the purpose and basic design of a well casing, screen, and gravel pack, and explain how each component is selected based on formation and water quality.

  • Given a site description (topography, nearby contamination sources, property lines), propose a defensible well location and justify it in 3–4 sentences.

Your checkpoint

A one-page site assessment memo for a hypothetical property, including a labeled sketch of the proposed well location, setback distances, and a short justification.

Week 2

Well Design and Construction & Drilling Methods, Equipment, and Operations

  • Compare rotary, cable-tool, and air-percussion drilling methods in terms of formation suitability, sample quality, and typical well construction.

  • Sequence the steps of well construction from drilling to completion, including casing installation, grouting, screen placement, and development.

  • Calculate the required volume of grout or bentonite for a given annular space and well depth, showing your work.

  • Describe how to recognize and respond to drilling problems such as lost circulation, stuck tools, and artesian flow.

  • Explain the importance of sanitary seals and proper grouting for preventing contamination, and list the NYSDOH requirements for grout placement.

Your checkpoint

A completed well construction checklist for a 200-foot bedrock well, with each step, responsible party, and inspection point noted.

Week 3

Well Design and Construction & Drilling Methods, Equipment, and Operations & Safety, Environmental Protection, and Professional Practice

  • Select appropriate casing material and wall thickness for a given depth and formation, referencing ASTM or AWWA standards.

  • Explain the design and installation of a well screen and filter pack for a sand-and-gravel aquifer, including slot size and pack gradation.

  • Describe safe handling and storage of drilling fluids and additives, and the spill prevention measures required on a drill site.

  • Identify the personal protective equipment and site safety practices for common drilling operations, including rigging, electrical, and confined space hazards.

  • Outline the steps to properly close out a drilling site, including fluid containment, waste disposal, and restoration.

Your checkpoint

A design specification sheet for a screened well in unconsolidated material, including casing, screen, filter pack, and grout details, plus a site safety and spill response plan.

Week 4

Well Development, Testing, and Disinfection & Pumps, Water Systems, and Controls

  • Describe the purpose and methods of well development (surging, jetting, air-lifting, bailing) and select an appropriate method for a given well type.

  • Interpret a pump test (drawdown vs. time) to estimate well yield and specific capacity, and explain the difference between yield and safe yield.

  • Explain the procedure for disinfection of a new or repaired well, including chlorine concentration, contact time, and flushing.

  • Compare submersible, jet, and centrifugal pumps for typical residential and small community wells, including selection criteria and limitations.

  • Describe the components of a typical pressure tank and control system, and explain how pressure switch settings and tank precharge affect system operation.

Your checkpoint

A well development and testing report for a hypothetical well, including development method, disinfection record, pump test data, calculated specific capacity, and recommended pump setting.

Week 5

Pumps, Water Systems, and Controls & Well Abandonment and Decommissioning

  • Size a pump and pressure tank for a given household demand, showing calculations for total dynamic head and drawdown volume.

  • Explain the electrical requirements and safety controls for a submersible pump installation, including wire sizing, grounding, and lightning protection.

  • Describe the conditions that require well abandonment and the NYSDOH requirements for decommissioning a well.

  • Outline the steps to properly abandon a well, including removal of obstructions, filling and sealing with approved materials, and documentation.

  • Compare acceptable and unacceptable fill materials for well abandonment and explain why each is accepted or rejected.

Your checkpoint

A pump system design worksheet for a 3-bedroom home, including pump curve selection, pressure tank size, and electrical specifications, plus a step-by-step well abandonment plan for a 150-foot well.

Week 6

Well Abandonment and Decommissioning & Regulations, Permits, and Reporting

  • Identify the permits and notifications required before drilling a new well or abandoning an existing well in New York, and describe the application process.

  • List the information that must be recorded on a well completion report (NYSDOH form) and explain why each item is important.

  • Describe the water quality testing requirements for new wells and the parameters that must be tested, including bacteria, nitrate, and arsenic.

  • Explain the process for handling a contamination incident, including notification, sampling, and remediation steps.

  • Outline the recordkeeping requirements for well drilling and pump installation, including retention periods and access by regulators.

Your checkpoint

A completed sample well completion report and a permit application checklist for a new well, with a brief explanation of each required field.

Week 7

Well Siting, Geology, and Hydrogeology & Regulations, Permits, and Reporting & Safety, Environmental Protection, and Professional Practice

  • Explain how to protect a well from surface contamination through proper grading, casing height, and sanitary seal, and describe the inspection steps to verify these.

  • Describe the potential impacts of nearby land uses (septic systems, agriculture, industry) on well water quality and the siting considerations to mitigate them.

  • Outline the professional and ethical responsibilities of a well driller, including accurate reporting, client communication, and avoiding conflicts of interest.

  • Describe the procedures for responding to a well emergency such as loss of water, contamination, or mechanical failure, including immediate actions and notifications.

  • Explain the importance of continuing education and staying current with regulations and best practices.

Your checkpoint

A wellhead protection inspection checklist and a one-page emergency response plan for a contaminated well scenario.

Week 8

Well Design and Construction & Drilling Methods, Equipment, and Operations & Well Development, Testing, and Disinfection & Pumps, Water Systems, and Controls & Well Abandonment and Decommissioning & Regulations, Permits, and Reporting & Safety, Environmental Protection, and Professional Practice

  • Complete a full-length practice exam under timed conditions and score at least 80% overall.

  • Review all incorrect answers and write a brief explanation for each correct answer, identifying the source of the error.

  • Create a one-page summary sheet of key formulas, regulatory deadlines, and design criteria for final review.

  • Practice explaining a well design or abandonment procedure aloud as if to a client or inspector, ensuring clarity and accuracy.

  • Revisit the weakest domain from the practice exam and complete 20 additional focused questions or case studies.

Your checkpoint

A scored practice exam with a log of incorrect answers, corrected explanations, and a personal summary sheet of key facts and formulas.

Milestones

Week 2: Can you correctly sequence well construction steps and calculate grout volume for a given well? Score at least 80% on a 10-question quiz covering domains 1 and 2.

Week 4: Can you interpret a pump test and design a basic pump system? Complete the week 4 deliverable and explain your calculations to a peer or mentor.

Week 6: Can you list all required permits and reporting items for a new well and an abandonment? Score at least 80% on a 15-question quiz covering domains 6 and 7.

Week 8: Achieve a score of 80% or higher on a full-length practice exam, with no domain below 70%.