NY Well Driller study plan
NY Well Driller · Give each week a clear focus.
8 weeks · About 7 hours per week
Well Siting, Geology, and Hydrogeology & Well Design and Construction
Explain how the local geology (bedrock type, overburden thickness, fractures) affects well siting and design, using at least two examples from your region.
Identify the key hydrogeologic parameters (transmissivity, storativity, hydraulic conductivity) and describe how they influence well yield and drawdown.
List the regulatory setback distances and isolation zone requirements for a residential well in New York, and describe how they affect the well location.
Describe the purpose and basic design of a well casing, screen, and gravel pack, and explain how each component is selected based on formation and water quality.
Given a site description (topography, nearby contamination sources, property lines), propose a defensible well location and justify it in 3–4 sentences.
Your checkpoint
A one-page site assessment memo for a hypothetical property, including a labeled sketch of the proposed well location, setback distances, and a short justification.
Well Design and Construction & Drilling Methods, Equipment, and Operations
Compare rotary, cable-tool, and air-percussion drilling methods in terms of formation suitability, sample quality, and typical well construction.
Sequence the steps of well construction from drilling to completion, including casing installation, grouting, screen placement, and development.
Calculate the required volume of grout or bentonite for a given annular space and well depth, showing your work.
Describe how to recognize and respond to drilling problems such as lost circulation, stuck tools, and artesian flow.
Explain the importance of sanitary seals and proper grouting for preventing contamination, and list the NYSDOH requirements for grout placement.
Your checkpoint
A completed well construction checklist for a 200-foot bedrock well, with each step, responsible party, and inspection point noted.
Well Design and Construction & Drilling Methods, Equipment, and Operations & Safety, Environmental Protection, and Professional Practice
Select appropriate casing material and wall thickness for a given depth and formation, referencing ASTM or AWWA standards.
Explain the design and installation of a well screen and filter pack for a sand-and-gravel aquifer, including slot size and pack gradation.
Describe safe handling and storage of drilling fluids and additives, and the spill prevention measures required on a drill site.
Identify the personal protective equipment and site safety practices for common drilling operations, including rigging, electrical, and confined space hazards.
Outline the steps to properly close out a drilling site, including fluid containment, waste disposal, and restoration.
Your checkpoint
A design specification sheet for a screened well in unconsolidated material, including casing, screen, filter pack, and grout details, plus a site safety and spill response plan.
Well Development, Testing, and Disinfection & Pumps, Water Systems, and Controls
Describe the purpose and methods of well development (surging, jetting, air-lifting, bailing) and select an appropriate method for a given well type.
Interpret a pump test (drawdown vs. time) to estimate well yield and specific capacity, and explain the difference between yield and safe yield.
Explain the procedure for disinfection of a new or repaired well, including chlorine concentration, contact time, and flushing.
Compare submersible, jet, and centrifugal pumps for typical residential and small community wells, including selection criteria and limitations.
Describe the components of a typical pressure tank and control system, and explain how pressure switch settings and tank precharge affect system operation.
Your checkpoint
A well development and testing report for a hypothetical well, including development method, disinfection record, pump test data, calculated specific capacity, and recommended pump setting.
Pumps, Water Systems, and Controls & Well Abandonment and Decommissioning
Size a pump and pressure tank for a given household demand, showing calculations for total dynamic head and drawdown volume.
Explain the electrical requirements and safety controls for a submersible pump installation, including wire sizing, grounding, and lightning protection.
Describe the conditions that require well abandonment and the NYSDOH requirements for decommissioning a well.
Outline the steps to properly abandon a well, including removal of obstructions, filling and sealing with approved materials, and documentation.
Compare acceptable and unacceptable fill materials for well abandonment and explain why each is accepted or rejected.
Your checkpoint
A pump system design worksheet for a 3-bedroom home, including pump curve selection, pressure tank size, and electrical specifications, plus a step-by-step well abandonment plan for a 150-foot well.
Well Abandonment and Decommissioning & Regulations, Permits, and Reporting
Identify the permits and notifications required before drilling a new well or abandoning an existing well in New York, and describe the application process.
List the information that must be recorded on a well completion report (NYSDOH form) and explain why each item is important.
Describe the water quality testing requirements for new wells and the parameters that must be tested, including bacteria, nitrate, and arsenic.
Explain the process for handling a contamination incident, including notification, sampling, and remediation steps.
Outline the recordkeeping requirements for well drilling and pump installation, including retention periods and access by regulators.
Your checkpoint
A completed sample well completion report and a permit application checklist for a new well, with a brief explanation of each required field.
Well Siting, Geology, and Hydrogeology & Regulations, Permits, and Reporting & Safety, Environmental Protection, and Professional Practice
Explain how to protect a well from surface contamination through proper grading, casing height, and sanitary seal, and describe the inspection steps to verify these.
Describe the potential impacts of nearby land uses (septic systems, agriculture, industry) on well water quality and the siting considerations to mitigate them.
Outline the professional and ethical responsibilities of a well driller, including accurate reporting, client communication, and avoiding conflicts of interest.
Describe the procedures for responding to a well emergency such as loss of water, contamination, or mechanical failure, including immediate actions and notifications.
Explain the importance of continuing education and staying current with regulations and best practices.
Your checkpoint
A wellhead protection inspection checklist and a one-page emergency response plan for a contaminated well scenario.
Well Design and Construction & Drilling Methods, Equipment, and Operations & Well Development, Testing, and Disinfection & Pumps, Water Systems, and Controls & Well Abandonment and Decommissioning & Regulations, Permits, and Reporting & Safety, Environmental Protection, and Professional Practice
Complete a full-length practice exam under timed conditions and score at least 80% overall.
Review all incorrect answers and write a brief explanation for each correct answer, identifying the source of the error.
Create a one-page summary sheet of key formulas, regulatory deadlines, and design criteria for final review.
Practice explaining a well design or abandonment procedure aloud as if to a client or inspector, ensuring clarity and accuracy.
Revisit the weakest domain from the practice exam and complete 20 additional focused questions or case studies.
Your checkpoint
A scored practice exam with a log of incorrect answers, corrected explanations, and a personal summary sheet of key facts and formulas.
Milestones
Week 2: Can you correctly sequence well construction steps and calculate grout volume for a given well? Score at least 80% on a 10-question quiz covering domains 1 and 2.
Week 4: Can you interpret a pump test and design a basic pump system? Complete the week 4 deliverable and explain your calculations to a peer or mentor.
Week 6: Can you list all required permits and reporting items for a new well and an abandonment? Score at least 80% on a 15-question quiz covering domains 6 and 7.
Week 8: Achieve a score of 80% or higher on a full-length practice exam, with no domain below 70%.