Site Planning and Land Use

  • General plan land-use designations set the allowed density and intensity; zoning must be consistent with the general plan.

  • Floor area ratio (FAR) = gross building floor area / net lot area; density is usually expressed as dwelling units per acre.

  • Net lot area excludes rights-of-way and often slopes or floodplain; gross area includes them.

  • Common residential densities: 1-8 du/ac low density, 8-20 medium, 20+ high density (varies by jurisdiction).

  • Setbacks, height limits, and lot coverage are separate zoning standards applied after the land-use designation.

  • Slope analysis: sites over 15% average slope typically trigger hillside ordinances and reduced density.

  • Parkland dedication is often 3-5 acres per 1,000 residents, or an in-lieu fee.

  • Access, frontage, and emergency-vehicle turnaround requirements constrain lot layout independent of zoning.

Quick reference

Grading, Drainage, and Stormwater Management

  • Slope (%) = (vertical rise / horizontal run) x 100.

  • Cut/fill volume between stations: average end area = (A1 + A2)/2 x L.

  • Prismoidal volume = L/6 x (A1 + 4Am + A2) for more accurate earthwork between varying sections.

  • Rational method peak flow: Q = CiA, with C runoff coefficient, i intensity (in/hr), A area (acres), Q in cfs.

  • Time of concentration is the travel time from the hydraulically most distant point to the design point.

  • Balancing cut and fill on site minimizes haul and import/export costs.

  • Minimum finished floor elevation is often set at or above the 100-year flood elevation plus freeboard.

  • Stormwater quality volume and hydromodification requirements often exceed simple peak-flow control.

Quick reference

Earthwork and Geotechnical Considerations

  • Standard Proctor (ASTM D698) vs Modified Proctor (ASTM D1557): modified uses greater compactive effort and yields higher maximum dry density.

  • Relative compaction is field dry density divided by laboratory maximum dry density, expressed as a percentage.

  • Typical structural fill compaction is 90-95% relative compaction; trench backfill may require higher.

  • Expansive soils (high plasticity index) require overexcavation, lime treatment, or moisture conditioning.

  • Bearing capacity is reported by the geotechnical engineer; allowable values commonly range 1,500-4,000 psf for native soils.

  • Shrinkage and bulking factors convert in-place, loose, and compacted volumes for haul calculations.

  • Liquefaction risk depends on saturated loose granular soils, high groundwater, and seismic shaking.

  • Benching and keying into bedrock or competent native soil stabilize fill slopes.

Quick reference

Roadway and Street Design

  • Stopping sight distance = perception-reaction distance + braking distance.

  • Braking distance = V^2 / (2g(f + G)), with V in consistent units, f friction factor, G grade.

  • Superelevation counteracts centrifugal force on horizontal curves; e + f = V^2/(gR) in consistent units.

  • Minimum horizontal curve radius depends on design speed, superelevation, and side friction.

  • Vertical curves: K value = length of curve / algebraic grade change; K relates to stopping sight distance.

  • Typical local residential street: 50-60 ft right-of-way, 28-36 ft curb-to-curb, 25 mph design speed.

  • Cul-de-sac turnarounds commonly require 50-60 ft diameter right-of-way.

  • Crown and cross-slope (typically 2%) provide pavement drainage; curb-and-gutter conveys flow to inlets.

Quick reference

Water Supply and Distribution

  • Hazen-Williams head loss: hf = 4.73 L Q^1.852 / (C^1.852 d^4.87) in US customary units.

  • C factors: new ductile iron ~130-140, older unlined cast iron ~80-100.

  • Minimum residential fire flow commonly 500-1,500 gpm depending on building type and separation.

  • Distribution systems should maintain minimum residual pressure of 20 psi under fire flow conditions.

  • Normal operating pressure typically 40-80 psi; above 80 psi pressure-reducing valves are used.

  • Water main minimum size is often 8 inches for residential and larger for commercial or looped systems.

  • Storage capacity must meet peak demand plus fire flow plus emergency reserve.

  • Backflow prevention (RPZ or double check) is required at cross-connections and irrigation services.

Quick reference

Sanitary Sewer and Wastewater

  • Manning's equation: Q = (1.486/n) A R^(2/3) S^(1/2) in US customary units.

  • Typical Manning n for vitrified clay or concrete sewer is 0.013; PVC ~0.010-0.013.

  • Minimum self-cleaning velocity is 2 ft/s; maximum is 10 ft/s to limit scour and sulfide generation.

  • Minimum sewer slope for 8-inch pipe is typically 0.40% (1/240).

  • Design flow is often peaking factor times average dry weather flow plus infiltration/inflow.

  • Sewer mains are typically designed to flow 50-75% full at peak design flow.

  • Manholes are required at grade changes, direction changes, and maximum spacing (often 300-400 ft).

  • Inverted siphons and force mains require special design for velocity and maintenance.

Quick reference

Storm Drainage and Flood Control

  • Rational method Q = CiA is valid for small urban catchments, generally under 200 acres.

  • Runoff coefficient C values: pavement 0.85-0.95, lawns 0.10-0.30, roofs 0.75-0.95.

  • Rainfall intensity i is selected for the design storm (e.g., 10-year, 25-year, 100-year) and time of concentration.

  • Manning's equation is used for pipe and channel capacity; full-flow capacity Q = (1.486/n) A R^(2/3) S^(1/2).

  • Detention storage routes peak outflow below pre-development levels using a stage-storage-discharge relationship.

  • 100-year floodplain elevation is the base flood; freeboard of 1-2 ft is often required above it.

  • Culvert design considers inlet control, outlet control, and headwater limits.

  • Energy dissipators are required where high-velocity discharge could erode downstream channels.

Quick reference

Erosion and Sediment Control

  • The Revised Universal Soil Loss Equation (RUSLE): A = R K LS C P.

  • Sediment basins are sized to capture runoff from disturbed areas, often based on 2-year storm or specified volume.

  • Silt fence is placed on contour downslope of disturbance, with stakes and fabric keyed into the ground.

  • Construction sequencing limits the area and duration of exposed soil.

  • Stabilization (seeding, mulch, blankets) is required on disturbed areas within a short period after final grading.

  • Check dams reduce channel velocity and promote sediment deposition in swales and ditches.

  • Storm drain inlets must be protected with gravel bags, inserts, or filter fabric during construction.

  • Inspection and maintenance of BMPs is required after each rain event and at defined intervals.

Quick reference

Regulatory Compliance and Permitting

  • CEQA (California) requires environmental review for discretionary projects; NEPA applies to federal actions.

  • Clean Water Act Section 404 permits from the USACE are required for discharge of dredged or fill material into waters of the US.

  • NPDES Construction General Permit requires a Storm Water Pollution Prevention Plan (SWPPP) for sites disturbing 1 acre or more.

  • Section 401 Water Quality Certification from the state is required for federal 404 permits.

  • California Fish and Game Code Section 1602 requires notification for streambed alteration.

  • Local grading permits typically require engineered plans, erosion control plans, and geotechnical reports.

  • Subdivision Map Act governs tentative and final maps; the Subdivision Map Act and local ordinances control lot creation.

  • Fire safe regulations and water supply requirements apply to new development in very high fire hazard severity zones.

Quick reference

Site Planning and Land Use

  • Floor area ratio (FAR) = gross floor area / net lot area.

  • Density is usually measured in dwelling units per acre (du/ac).

  • General plan designations set allowable uses; zoning must be consistent with the general plan.

  • Parkland dedication is commonly 3-5 acres per 1,000 residents or an in-lieu fee.

  • Average slope over 15% often triggers hillside ordinances and reduced density.

  • Setbacks, height, and lot coverage are separate zoning standards from land-use designation.

Quick reference

Grading, Drainage, and Stormwater Management

  • Slope (%) = (rise / run) x 100.

  • Average end area volume = (A1 + A2)/2 x L.

  • Rational method: Q = CiA (Q in cfs, i in in/hr, A in acres).

  • Time of concentration is the travel time from the most hydraulically distant point to the design point.

  • Balancing cut and fill minimizes haul and import/export costs.

  • Minimum finished floor elevation is often set at the 100-year flood elevation plus freeboard.

Quick reference

Earthwork and Geotechnical Considerations

  • Standard Proctor (ASTM D698) uses less compactive effort than Modified Proctor (ASTM D1557).

  • Relative compaction = field dry density / lab maximum dry density x 100%.

  • Structural fill is commonly specified at 90-95% relative compaction.

  • Expansive soils with high plasticity index require overexcavation, lime treatment, or moisture conditioning.

  • Allowable bearing capacity for native soils commonly ranges 1,500-4,000 psf.

  • Shrinkage and bulking factors convert in-place, loose, and compacted volumes for haul calculations.

Quick reference

Roadway and Street Design

  • Stopping sight distance = perception-reaction distance + braking distance.

  • Braking distance = V^2 / (2g(f + G)).

  • Superelevation and side friction jointly resist centrifugal force on horizontal curves.

  • Vertical curve K value = length of curve / algebraic grade change.

  • Typical local residential street: 50-60 ft right-of-way, 28-36 ft curb-to-curb.

  • Cul-de-sac turnarounds commonly require 50-60 ft diameter right-of-way.

Quick reference

Water Supply and Distribution

  • Hazen-Williams head loss: hf = 4.73 L Q^1.852 / (C^1.852 d^4.87) in US customary units.

  • C factors: new ductile iron ~130-140, older unlined cast iron ~80-100.

  • Minimum residual pressure under fire flow is commonly 20 psi.

  • Normal operating pressure is typically 40-80 psi.

  • Water main minimum size is often 8 inches for residential systems.

  • Backflow prevention (RPZ or double check) is required at cross-connections.

Quick reference

Sanitary Sewer and Wastewater

  • Manning's equation: Q = (1.486/n) A R^(2/3) S^(1/2) in US customary units.

  • Minimum self-cleaning velocity is 2 ft/s; maximum is 10 ft/s.

  • Minimum slope for 8-inch sewer is typically 0.40%.

  • Sewer mains are typically designed to flow 50-75% full at peak design flow.

  • Manholes are required at grade and direction changes and at maximum spacing.

  • Design flow includes average dry weather flow, peaking factor, and infiltration/inflow.

Quick reference

Storm Drainage and Flood Control

  • Rational method is generally valid for urban catchments under about 200 acres.

  • Runoff coefficients: pavement 0.85-0.95, lawns 0.10-0.30, roofs 0.75-0.95.

  • Pipe full-flow capacity: Q = (1.486/n) A R^(2/3) S^(1/2).

  • Detention storage reduces peak outflow using a stage-storage-discharge relationship.

  • 100-year floodplain is the base flood; freeboard of 1-2 ft is often required above it.

  • Culvert design considers inlet control, outlet control, and allowable headwater.

Quick reference

Erosion and Sediment Control

  • RUSLE: A = R K LS C P.

  • Silt fence is placed on contour downslope of disturbance and keyed into the ground.

  • Check dams reduce channel velocity and promote sediment deposition.

  • Storm drain inlets are protected with gravel bags, inserts, or filter fabric during construction.

  • Disturbed areas require stabilization (seeding, mulch, blankets) within a defined period after final grading.

  • BMPs must be inspected after each rain event and at defined intervals.

Quick reference

Regulatory Compliance and Permitting

  • CEQA requires environmental review for discretionary projects in California; NEPA applies to federal actions.

  • Clean Water Act Section 404 permits from the USACE are required for fill into waters of the US.

  • NPDES Construction General Permit requires an SWPPP for sites disturbing 1 acre or more.

  • Section 401 Water Quality Certification from the state is required for federal 404 permits.

  • California Fish and Game Code Section 1602 requires notification for streambed alteration.

  • Local grading permits typically require engineered plans, erosion control plans, and geotechnical reports.