CSLB Land Development Engineering flashcards
CSLB Land Development Engineering · Build recall with a focused review session.
34 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Floor Area Ratio
- Ratio of gross building floor area to net lot area. Used by zoning to control building intensity independent of lot size or use type.
- Dwelling Units per Acre
- Density measure equal to the number of residential units divided by the net developable lot area in acres. Common zoning metric for housing capacity.
- General Plan Consistency
- Legal requirement that local zoning and land-use decisions be consistent with the jurisdiction's adopted general plan. Inconsistency can invalidate a permit approval.
- Hillside Ordinance
- Local regulation triggered by average site slope, typically over 15 percent, imposing reduced density, grading limits, and design standards on steep terrain.
- Parkland Dedication
- Requirement that new residential subdivisions dedicate land for parks, commonly 3 to 5 acres per 1,000 residents, or pay an in-lieu fee.
- Rational Method
- Peak flow formula Q = CiA, where C is runoff coefficient, i is rainfall intensity in inches per hour, and A is area in acres. Valid for small urban catchments.
- Time of Concentration
- Travel time for runoff from the hydraulically most distant point of a catchment to the design point. Used to select rainfall intensity for the Rational Method.
- Average End Area Method
- Earthwork volume formula: (A1 + A2)/2 times the distance L between cross sections. Approximates cut or fill volume between stations.
- Prismoidal Formula
- Volume = L/6 times (A1 + 4Am + A2), where Am is the mid-section area. More accurate than average end area for varying sections.
- Freeboard
- Vertical separation between the design flood elevation and the lowest finished floor or structure. Typically 1 to 2 feet to account for uncertainty.
- Standard Proctor Test
- ASTM D698 laboratory compaction test using a 5.5-lb hammer. Establishes maximum dry density and optimum moisture content for soil.
- Modified Proctor Test
- ASTM D1557 compaction test using a 10-lb hammer and greater energy. Yields higher maximum dry density and lower optimum moisture than Standard Proctor.
- Relative Compaction
- Field dry density divided by laboratory maximum dry density, expressed as a percentage. Typical structural fill specifications require 90 to 95 percent.
- Expansive Soil
- Soil with high plasticity index that swells with moisture and shrinks when dried. Requires overexcavation, lime treatment, or moisture conditioning before construction.
- Allowable Bearing Capacity
- Maximum soil pressure a foundation may impose, determined by the geotechnical engineer. Common values for native soils are 1,500 to 4,000 psf.
- Stopping Sight Distance
- Sum of perception-reaction distance and braking distance. Must be provided along a roadway so drivers can stop before a hazard.
- Superelevation
- Pavement banking on horizontal curves that helps resist centrifugal force. Combined with side friction, it determines the minimum safe curve radius.
- Vertical Curve K Value
- Length of vertical curve divided by the algebraic grade change. Relates curve length to stopping sight distance for a given design speed.
- Cul-de-Sac Turnaround
- Dead-end street terminus allowing vehicles to reverse direction. Commonly requires a 50 to 60 foot diameter right-of-way.
- Hazen-Williams Equation
- Empirical head loss formula for water mains: hf = 4.73 L Q^1.852 / (C^1.852 d^4.87) in US customary units, with C as roughness coefficient.
- Residual Pressure
- Pressure remaining in a water distribution system during fire flow. A minimum of 20 psi is commonly required to protect against contamination and collapse.
- Backflow Prevention
- Device such as an RPZ or double check valve installed at cross-connections to prevent contaminated water from entering the potable supply.
- Manning's Equation
- Open-channel flow formula Q = (1.486/n) A R^(2/3) S^(1/2) in US customary units. Used for sewer, storm drain, and channel capacity.
- Self-Cleaning Velocity
- Minimum flow velocity of about 2 feet per second in sanitary sewers that prevents solids from depositing. Maximum is about 10 feet per second.
- Infiltration and Inflow
- Groundwater and stormwater entering sanitary sewers through defects, joints, and illegal connections. Added to design flow for capacity sizing.
- Detention Basin
- Storage facility that temporarily holds stormwater and releases it slowly. Reduces peak outflow to pre-development levels using stage-storage-discharge routing.
- Base Flood Elevation
- Water surface elevation of the 100-year flood. Used to set minimum finished floor elevations and floodplain development restrictions.
- Inlet Control
- Culvert flow condition limited by the entrance geometry rather than downstream conditions. Headwater depth depends on inlet area and shape.
- RUSLE
- Revised Universal Soil Loss Equation: A = R K LS C P. Estimates annual soil loss from rainfall erosivity, soil erodibility, slope, cover, and practices.
- Silt Fence
- Fabric barrier staked on contour downslope of disturbed areas, with the bottom keyed into the ground, to trap sediment from sheet flow.
- Check Dam
- Small structure placed across a swale or ditch to reduce flow velocity and promote sediment deposition. Often built of rock, gravel bags, or logs.
- SWPPP
- Storm Water Pollution Prevention Plan required under the NPDES Construction General Permit for sites disturbing one acre or more. Describes BMPs and inspections.
- Section 404 Permit
- Clean Water Act permit issued by the US Army Corps of Engineers for discharge of dredged or fill material into waters of the United States.
- CEQA
- California Environmental Quality Act. Requires environmental review and disclosure for discretionary projects, with mitigation of significant impacts where feasible.