Floor Area Ratio
Ratio of gross building floor area to net lot area. Used by zoning to control building intensity independent of lot size or use type.
Dwelling Units per Acre
Density measure equal to the number of residential units divided by the net developable lot area in acres. Common zoning metric for housing capacity.
General Plan Consistency
Legal requirement that local zoning and land-use decisions be consistent with the jurisdiction's adopted general plan. Inconsistency can invalidate a permit approval.
Hillside Ordinance
Local regulation triggered by average site slope, typically over 15 percent, imposing reduced density, grading limits, and design standards on steep terrain.
Parkland Dedication
Requirement that new residential subdivisions dedicate land for parks, commonly 3 to 5 acres per 1,000 residents, or pay an in-lieu fee.
Rational Method
Peak flow formula Q = CiA, where C is runoff coefficient, i is rainfall intensity in inches per hour, and A is area in acres. Valid for small urban catchments.
Time of Concentration
Travel time for runoff from the hydraulically most distant point of a catchment to the design point. Used to select rainfall intensity for the Rational Method.
Average End Area Method
Earthwork volume formula: (A1 + A2)/2 times the distance L between cross sections. Approximates cut or fill volume between stations.
Prismoidal Formula
Volume = L/6 times (A1 + 4Am + A2), where Am is the mid-section area. More accurate than average end area for varying sections.
Freeboard
Vertical separation between the design flood elevation and the lowest finished floor or structure. Typically 1 to 2 feet to account for uncertainty.
Standard Proctor Test
ASTM D698 laboratory compaction test using a 5.5-lb hammer. Establishes maximum dry density and optimum moisture content for soil.
Modified Proctor Test
ASTM D1557 compaction test using a 10-lb hammer and greater energy. Yields higher maximum dry density and lower optimum moisture than Standard Proctor.
Relative Compaction
Field dry density divided by laboratory maximum dry density, expressed as a percentage. Typical structural fill specifications require 90 to 95 percent.
Expansive Soil
Soil with high plasticity index that swells with moisture and shrinks when dried. Requires overexcavation, lime treatment, or moisture conditioning before construction.
Allowable Bearing Capacity
Maximum soil pressure a foundation may impose, determined by the geotechnical engineer. Common values for native soils are 1,500 to 4,000 psf.
Stopping Sight Distance
Sum of perception-reaction distance and braking distance. Must be provided along a roadway so drivers can stop before a hazard.
Superelevation
Pavement banking on horizontal curves that helps resist centrifugal force. Combined with side friction, it determines the minimum safe curve radius.
Vertical Curve K Value
Length of vertical curve divided by the algebraic grade change. Relates curve length to stopping sight distance for a given design speed.
Cul-de-Sac Turnaround
Dead-end street terminus allowing vehicles to reverse direction. Commonly requires a 50 to 60 foot diameter right-of-way.
Hazen-Williams Equation
Empirical head loss formula for water mains: hf = 4.73 L Q^1.852 / (C^1.852 d^4.87) in US customary units, with C as roughness coefficient.
Residual Pressure
Pressure remaining in a water distribution system during fire flow. A minimum of 20 psi is commonly required to protect against contamination and collapse.
Backflow Prevention
Device such as an RPZ or double check valve installed at cross-connections to prevent contaminated water from entering the potable supply.
Manning's Equation
Open-channel flow formula Q = (1.486/n) A R^(2/3) S^(1/2) in US customary units. Used for sewer, storm drain, and channel capacity.
Self-Cleaning Velocity
Minimum flow velocity of about 2 feet per second in sanitary sewers that prevents solids from depositing. Maximum is about 10 feet per second.
Infiltration and Inflow
Groundwater and stormwater entering sanitary sewers through defects, joints, and illegal connections. Added to design flow for capacity sizing.
Detention Basin
Storage facility that temporarily holds stormwater and releases it slowly. Reduces peak outflow to pre-development levels using stage-storage-discharge routing.
Base Flood Elevation
Water surface elevation of the 100-year flood. Used to set minimum finished floor elevations and floodplain development restrictions.
Inlet Control
Culvert flow condition limited by the entrance geometry rather than downstream conditions. Headwater depth depends on inlet area and shape.
RUSLE
Revised Universal Soil Loss Equation: A = R K LS C P. Estimates annual soil loss from rainfall erosivity, soil erodibility, slope, cover, and practices.
Silt Fence
Fabric barrier staked on contour downslope of disturbed areas, with the bottom keyed into the ground, to trap sediment from sheet flow.
Check Dam
Small structure placed across a swale or ditch to reduce flow velocity and promote sediment deposition. Often built of rock, gravel bags, or logs.
SWPPP
Storm Water Pollution Prevention Plan required under the NPDES Construction General Permit for sites disturbing one acre or more. Describes BMPs and inspections.
Section 404 Permit
Clean Water Act permit issued by the US Army Corps of Engineers for discharge of dredged or fill material into waters of the United States.
CEQA
California Environmental Quality Act. Requires environmental review and disclosure for discretionary projects, with mitigation of significant impacts where feasible.