CSLB Land Development Engineering study materials
CSLB Land Development Engineering study resources

CSLB Land Development Engineering study plan

CSLB Land Development Engineering · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Site Planning and Land Use & Grading, Drainage, and Stormwater Management

  • Map each of the nine exam domains to its weight and rank study time accordingly

  • Define site-planning vocabulary from memory: zoning setback, floor-area ratio, lot coverage, density, and land-use compatibility

  • Compute floor-area ratio, lot coverage, and dwelling-unit density for three worked parcel scenarios

  • Trace the path of stormwater from a graded lot through inlets, swales, and detention to a discharge point

  • Explain how site layout decisions constrain later grading and drainage design

Your checkpoint

One-page domain-weight study budget plus three solved site-metric problems with answers checked

Week 2

Grading, Drainage, and Stormwater Management & Storm Drainage and Flood Control

  • Compute runoff volume using the rational method with a chosen runoff coefficient, intensity, and area

  • Size a detention basin volume given pre- and post-development peak flows using a simple hydrograph method

  • Sketch and label a complete storm drainage conveyance layout including inlets, laterals, trunk line, and outfall

  • Apply the concept of time of concentration to select rainfall intensity

  • Identify floodplain management constraints that affect site layout and outfall design

Your checkpoint

A worked stormwater calculation set (runoff, detention volume, pipe sizing) with a labeled drainage schematic

Week 3

Earthwork and Geotechnical Considerations & Erosion and Sediment Control

  • Classify soils by grain size and plasticity and relate each class to compaction and drainage behavior

  • Compute cut and fill volumes using the average end-area method on a simple earthwork example

  • Interpret standard compaction test results and field density test results against a target relative compaction

  • Select erosion and sediment control best management practices for a sloped construction site

  • Sequence temporary versus permanent stabilization measures across construction phases

Your checkpoint

An earthwork balance sheet (cut, fill, net import/export) plus a BMP selection table for a sample site

Week 4

Roadway and Street Design & Grading, Drainage, and Stormwater Management

  • Apply geometric design criteria for horizontal curves, vertical curves, and stopping sight distance

  • Compute pavement cross-slope drainage and identify minimum and maximum longitudinal grade limits

  • Lay out a residential street network with appropriate intersection spacing and cul-de-sac dimensions

  • Check a street profile for grade breaks and vertical curve length adequacy

Your checkpoint

A roadway plan-and-profile design exercise with sight distance and grade checks documented

Milestones

Week 4: Score at least 70% on a self-made 30-question quiz covering Domains 1, 2, 3, 4, 7, and 8