OR HVAC Contractor study materials
OR HVAC Contractor study resources

OR HVAC Contractor cheat sheet

OR HVAC Contractor · Keep the key ideas within reach.

Quick reference

Oregon Contractor Business Practices and Law

  • Oregon CCB license types: residential general contractor, residential specialty contractor, commercial general contractor, and commercial specialty contractor; each carries a separate endorsement scope.

  • A residential specialty contractor may not take a project whose combined structural and non-structural work exceeds the specialty threshold; exceeding scope is an unlicensed-activity violation.

  • CCB license renewal runs on a two-year cycle; the licensee must show continuing education and a current surety bond before renewal is granted.

  • Oregon requires a surety bond filed with the CCB; a residential general contractor bond is $20,000 and a residential specialty contractor bond is $10,000, with commercial bonds higher.

  • A written contract is required for residential work above $2,000; it must state the contractor's CCB number, the work scope, price, and payment schedule.

  • Oregon's right-to-cure notice process: the owner must give written notice and allow the contractor a chance to inspect and offer to repair before filing suit on a defect.

  • The Construction Contractors Board handles consumer complaints and can order arbitration or mediation; unpaid CCB civil penalties can suspend the license.

  • Lien rights: a construction lien must be perfected by recording within 75 days after the claimant stops providing labor, materials, or equipment.

  • A HVAC contractor performing work on a structure must carry workers' compensation coverage or hold a valid exemption on file with the CCB.

Quick reference

Oregon Building Codes and Administrative Provisions

  • Oregon adopts the statewide specialty codes through the Building Codes Division; local jurisdictions may amend only where the state authorizes, so the state code edition controls.

  • The Oregon Residential Specialty Code (ORSC) governs one- and two-family dwellings and townhouses; commercial and multi-family work falls under the Oregon Structural Specialty Code (OSSC).

  • A permit is required before installing, altering, or replacing a HVAC appliance, duct system, or fuel gas piping; permit fees are set by the jurisdiction's adopted fee schedule.

  • Inspection sequence for HVAC: rough-in (ductwork, refrigerant lines, gas piping, venting) before concealment, then final inspection after equipment startup and controls are complete.

  • Oregon Mechanical Code clearance requirements: appliances must maintain the manufacturer's listed clearances to combustibles, and vent terminations must meet the code's minimum distances from openings and intakes.

  • The Oregon Energy Efficiency Specialty Code sets duct insulation R-values, duct sealing, and equipment efficiency minimums for new and altered systems.

  • A code change or field modification that deviates from the approved plans requires a revised permit application and re-review before the work is covered.

  • Stop-work orders may be issued for work without a permit or work that creates an imminent hazard; the contractor must obtain approval before resuming.

Quick reference

Heating, Ventilating, and Air Conditioning Systems

  • Sensible heat formula: Btu/h = 1.08 x CFM x delta-T (dry air at standard conditions); latent heat: Btu/h = 0.68 x CFM x delta-grains.

  • Total heat = 4.5 x CFM x delta-enthalpy (Btu/h), useful when comparing coil loads on a psychrometric chart.

  • Equipment sizing follows ACCA Manual J for load, Manual S for equipment selection, and Manual D for duct design; oversized equipment causes short cycling and poor latent removal.

  • Static pressure budget: typical residential supply static 0.1-0.2 in. w.c., return 0.05-0.1 in. w.c., and total external static pressure must stay within the air handler's rated limit.

  • Duct sizing by equal friction or velocity method; supply trunk velocities commonly 600-900 fpm residential, branch runs 400-700 fpm, and return ducts lower to limit noise.

  • Refrigerant superheat at the evaporator outlet is typically 8-12 degrees F in fixed-orifice systems; subcooling at the condenser outlet is typically 8-12 degrees F in TXV systems.

  • A heat pump's balance point is where building load equals capacity; below it, supplemental electric resistance or fossil fuel heat stages in.

  • Combustion air: a confined space needs two permanent openings sized at 1 square inch per 1,000 Btu/h of input when both openings communicate with the outdoors.

Quick reference

Refrigeration Systems and Components

  • The refrigeration cycle: compressor raises pressure and temperature, condenser rejects heat and subcools, metering device drops pressure, evaporator absorbs heat and superheats.

  • Superheat = actual evaporator outlet temperature minus the saturated suction temperature at that pressure; low superheat risks liquid floodback to the compressor.

  • Subcooling = saturated condensing temperature minus liquid line temperature; low subcooling suggests undercharge, high subcooling suggests overcharge or a restricted liquid line.

  • Common refrigerants: R-410A operates at roughly 60% higher pressure than R-22; R-134a is a medium-pressure refrigerant used in chillers and medium-temperature refrigeration.

  • A receiver stores liquid on the high side in systems with a thermostatic expansion valve; a suction accumulator protects the compressor from liquid slugging.

  • A TEV maintains constant superheat by modulating refrigerant flow; a capillary tube is a fixed restriction whose flow varies with pressure difference.

  • Refrigerant oil miscibility matters: mineral oil suits CFC/HCFC systems, while POE oil is required with HFC refrigerants and absorbs moisture readily.

  • Recovery cylinders must not be filled above 80% of capacity by weight; DOT cylinders require hydrostatic testing on a defined interval.

Quick reference

Electrical and Controls for HVAC/R Equipment

  • Ohm's law: E = I x R; power in a resistive circuit: P = E x I; for single-phase motors, brake horsepower relates to watts by 746 W per hp.

  • Locked-rotor amps (LRA) exceed running-load amps (RLA); a start capacitor and potential relay or PTC device provide the extra starting torque.

  • A run capacitor wired in series with the start winding shifts phase; a failed run capacitor causes high current, low torque, and motor overheating.

  • Control transformer sizing: VA rating must exceed the sum of connected control loads; a 24 V secondary at 40 VA supplies about 1.67 A.

  • Thermostat wiring conventions: R power, W heat, Y compressor, G fan, O/B reversing valve, C common; a missing C wire prevents smart thermostats from powering.

  • Defrost controls on heat pumps use time-temperature or demand-defrost boards; a stuck defrost termination can leave the unit in defrost and cause cold blow indoors.

  • Electrical safety: lockout/tagout before servicing, verify with a meter rated for the circuit's category, and discharge capacitors before touching terminals.

  • NEC requires a disconnecting means within sight of the HVAC equipment and a dedicated branch circuit sized to the nameplate minimum circuit ampacity.

Quick reference

Fuel Gas Piping and Combustion Appliances

  • Gas piping sizing uses the longest-run method with tables keyed to inlet pressure, specific gravity, and pressure drop; natural gas is typically 0.60 specific gravity.

  • A manifold or drip leg is required at the appliance connection, and a sediment trap must be installed downstream of the shutoff valve ahead of the controls.

  • Combustion air for a confined space: openings sized at 1 square inch per 1,000 Btu/h of total input when both communicate with outdoors; 1 per 2,000 Btu/h if one opening is high and one low.

  • Venting categories: Category I natural draft (negative pressure, non-condensing), Category III positive pressure non-condensing, Category IV positive pressure condensing.

  • A B-vent is a listed double-wall natural-draft vent; single-wall connectors require clearance to combustibles and must slope upward toward the vent.

  • Combustion analysis targets: natural gas flue CO2 roughly 8-9% at steady state, and CO in flue gas should stay well under 100 ppm air-free; ambient CO must be near zero.

  • A manifold gas pressure check confirms the appliance's rated input; natural gas appliances commonly require 3.5 in. w.c. manifold pressure, LP appliances 10-11 in. w.c.

  • Leak testing: a new gas piping system is pressure-tested with air or inert gas per the code's test pressure and duration before the gas is turned on.

Quick reference

Safety, Tools, and Jobsite Practices

  • Refrigerant safety: ASHRAE classifications A1 (low toxicity, no flame propagation) through B3; A2L refrigerants are mildly flammable and require ignition-source controls and ventilation.

  • Oxygen-acetylene torch setup: open the acetylene valve no more than 1.5 turns, use a flashback arrestor, and never use acetylene above 15 psig.

  • Brazing requires nitrogen purge through the tubing to prevent internal oxidation (scale) that can clog metering devices and damage compressors.

  • Personal protective equipment for HVAC work: safety glasses, gloves, hearing protection near compressors, and fall protection above six feet.

  • Refrigerant exposure limits: use a calibrated leak detector and monitor oxygen levels before entering a confined equipment room; refrigerant displaces oxygen.

  • Electrical lockout/tagout: isolate the disconnect, apply a lock, verify zero voltage with a meter, and tag the equipment before service.

  • Ladder and scaffold safety: maintain a 4:1 ladder angle, three points of contact, and secure access to rooftops with a guardrail or tie-off point.

  • Jobsite documentation: record refrigerant added and recovered by weight, equipment model and serial numbers, and readings taken at startup for warranty and code compliance.