OR HVAC Contractor study materials
OR HVAC Contractor study resources

OR HVAC Contractor practice questions

One question at a time. Build your OR HVAC Contractor understanding.

First 50 of 200 questions. Each one lists the choices, the correct answer, and an explanation. The checker at the top of this page saves progress in this browser when it is available.

Continue in the practice tool above to load more questions, 50 at a time.

Question 1Oregon Contractor Business Practices and Law

Under Oregon contractor law administered by the Oregon Construction Contractors Board (CCB), a residential general contractor license is required before performing which of the following activities?

  1. Offering to undertake a project that requires two or more unrelated trades Correct answer.
  2. Performing work on a structure less than 10 feet tall
  3. Repairing a single-family home the contractor personally owns and occupies
  4. Installing flooring as a sole-trade contractor with no other trades involved

Explanation

Oregon ties the residential general contractor license to projects involving two or more unrelated building trades, or work that requires a building permit. A single-trade specialty contractor works under a specialty license instead, and owner-occupants working on their own residence are exempt.

Question 2Oregon Contractor Business Practices and Law

A licensed Oregon contractor is preparing a written home improvement contract for a $14,000 remodeling job. Which element must the contract contain to comply with CCB requirements?

  1. A notarized signature from each homeowner
  2. A copy of the contractor's general liability policy
  3. The contractor's CCB license number Correct answer.
  4. An arbitration clause naming the CCB as arbitrator

Explanation

Oregon requires home improvement contracts to display the contractor's CCB license number along with other disclosures such as the buyer's right to cancel. Notarization, policy copies, and CCB arbitration are not mandatory contract elements.

Question 3Oregon Contractor Business Practices and Law

An Oregon contractor receives a $6,000 deposit from a homeowner for a kitchen remodel and deposits it into the company's general operating account, spending part of it on unrelated payroll before ordering materials. Which statement best describes the contractor's legal position?

  1. This may violate Oregon trust-fund and misapplication-of-funds rules Correct answer.
  2. This is permitted because the amount is below the CCB complaint threshold
  3. This is permitted because the deposit is company revenue once received
  4. This is permitted if the contractor eventually completes the work

Explanation

Oregon law treats money received for a specific construction project as held in trust for that project, and using it for unrelated purposes can constitute misapplication of construction funds. The violation exists regardless of whether the project is later finished.

Question 4Oregon Contractor Business Practices and Law

A homeowner files a CCB complaint alleging defective workmanship by a licensed contractor. What is the CCB's primary role in the dispute process?

  1. Prosecuting the contractor criminally for construction defects
  2. Investigating the complaint and offering mediation or arbitration Correct answer.
  3. Recording the complaint as a deed restriction on the property
  4. Issuing a binding court judgment enforceable as a lien

Explanation

The CCB investigates complaints against licensed contractors and provides dispute resolution through mediation and, where applicable, arbitration. It does not enter court judgments, bring criminal charges, or encumber property records.

Question 5Oregon Contractor Business Practices and Law

An Oregon contractor wants to bid on a project that involves both structural framing and electrical rough-in. Which licensing arrangement satisfies Oregon requirements?

  1. A residential general contractor license, or a specialty license plus a properly licensed electrical subcontractor Correct answer.
  2. No license, because the electrical work is performed by a licensed electrician
  3. A specialty license limited to framing, with the electrician hired as a subcontractor
  4. A single specialty license covering both framing and electrical trades

Explanation

When a project involves two or more unrelated trades, the prime contractor needs a residential general contractor license unless it holds a specialty license and subcontracts the other trade to a properly licensed contractor. Electrical work also requires a separate electrical license from the state.

Question 6Oregon Contractor Business Practices and Law

A contractor licensed in Washington begins work on an Oregon residential project without an Oregon CCB license. Which consequence is most consistent with Oregon law?

  1. The contractor loses the right to sue to collect compensation for the work Correct answer.
  2. The contractor may sue to foreclose a construction lien on the property
  3. The contract is automatically void and the homeowner must return all materials
  4. The contractor may enforce the contract but must pay a late licensing fee

Explanation

Oregon denies an unlicensed contractor the right to bring suit or foreclose a lien to collect compensation for work requiring a license. Out-of-state licensure does not substitute for an Oregon CCB license.

Question 7Oregon Contractor Business Practices and Law

Which bond must a licensed Oregon residential contractor maintain to satisfy CCB requirements?

  1. A bid bond submitted with every estimate
  2. A performance bond for each individual project
  3. A fiduciary bond covering employee retirement funds
  4. A surety bond conditioned on compliance with contractor law Correct answer.

Explanation

Oregon requires licensed contractors to carry a surety bond conditioned on faithful compliance with the contractor licensing law, filed with the CCB. Project-specific performance bonds and bid bonds are separate commercial instruments not required for licensure.

Question 8Oregon Contractor Business Practices and Law

A homeowner signs a home improvement contract at the kitchen table on a Tuesday evening. Under Oregon's home solicitation rules, what right does the homeowner generally have?

  1. A right to demand the contractor begin work within 24 hours
  2. A right to cancel the contract within three business days Correct answer.
  3. A right to require the contractor to hold the deposit in escrow
  4. A right to renegotiate the price after the first payment

Explanation

Oregon gives buyers a three-business-day right to cancel certain home solicitation contracts, and the contract must disclose that right. The cancellation right protects buyers approached outside the contractor's normal place of business.

Question 9Oregon Contractor Business Practices and Law

A contractor's CCB license lapses on March 1 for failure to renew. The contractor continues working on an active residential job through April. What is the most accurate statement?

  1. The work is unlawful and may expose the contractor to CCB sanctions Correct answer.
  2. The work is lawful if the homeowner signs a waiver of licensing
  3. The work is lawful because the project began while the license was active
  4. The work is lawful if no complaint is filed during the lapse

Explanation

Oregon requires a contractor to be licensed at all times while performing work that requires a license; a lapse means the contractor is unlicensed during that period. Continuing to work can draw CCB disciplinary action and affects the contractor's ability to collect.

Question 10Oregon Contractor Business Practices and Law

Which statement correctly describes the CCB's disciplinary authority over a licensed Oregon contractor?

  1. The CCB may impose criminal fines only through a grand jury
  2. The CCB may act only on complaints filed by the attorney general
  3. The CCB may suspend, revoke, or condition a license after notice and hearing Correct answer.
  4. The CCB may discipline only after a court enters a civil judgment

Explanation

The CCB can suspend, revoke, or place conditions on a contractor license following the administrative process, including notice and an opportunity for hearing. Discipline is administrative rather than criminal or dependent on a court judgment.

Question 11Oregon Contractor Business Practices and Law

An Oregon contractor signs a contract containing a clause requiring all disputes to be resolved by binding arbitration administered by a private provider. Which statement is most accurate?

  1. The clause automatically waives the homeowner's right to file a CCB complaint
  2. The clause is void unless the CCB approves the arbitrator's fee schedule
  3. The clause is unenforceable because the CCB has exclusive jurisdiction
  4. The clause is enforceable if properly disclosed and agreed to by the parties Correct answer.

Explanation

Oregon generally recognizes arbitration agreements in construction contracts when they are properly disclosed and agreed to. Such a clause does not strip the homeowner of the ability to file a licensing complaint with the CCB.

Question 12Oregon Contractor Business Practices and Law

A contractor advertises 'Licensed, bonded, and insured' in a newspaper ad. Which Oregon requirement applies to contractor advertising?

  1. The ad must list at least three references
  2. The ad must state the contractor's hourly rate
  3. The ad must include the CCB license number Correct answer.
  4. The ad must be pre-approved by the CCB

Explanation

Oregon requires contractor advertisements to include the contractor's CCB license number so consumers can verify licensure. Pre-approval, rate disclosure, and reference lists are not advertising requirements.

Question 13Oregon Contractor Business Practices and Law

A homeowner refuses to pay a $9,500 invoice for completed work, disputing the quality. The contractor wants to preserve lien rights. What must the contractor generally do to perfect a construction lien in Oregon?

  1. File a CCB complaint against the homeowner first
  2. Obtain a court judgment before recording anything
  3. Record a lien claim within the statutory period and give required notice to the owner Correct answer.
  4. Wait until the homeowner sells the property

Explanation

Perfecting a construction lien in Oregon requires timely recording of a claim of lien and providing the notices the statute requires, including notice to the owner. A CCB complaint or prior judgment is not a prerequisite to recording.

Question 14Oregon Contractor Business Practices and Law

Which Oregon rule governs how a contractor must handle a written change order on a home improvement project?

  1. Changes are valid only if witnessed by a CCB inspector
  2. Oral changes are sufficient if the contractor documents them later
  3. Changes under $500 need no documentation
  4. Changes must be documented in a signed writing before the extra work proceeds Correct answer.

Explanation

Oregon expects changes to home improvement contracts to be documented in a signed writing before the additional work is performed, protecting both parties. Relying on later documentation or undocumented oral changes invites disputes.

Question 15Oregon Contractor Business Practices and Law

A contractor holds a CCB license but lets the required liability insurance policy lapse for two months. What is the most likely consequence under Oregon rules?

  1. The contractor must reduce the contract price by the premium amount
  2. The license may be suspended until proof of insurance is restored Correct answer.
  3. The contractor may continue working but must post a public notice
  4. Nothing, because insurance is optional for licensed contractors

Explanation

Oregon requires contractors to maintain the required general liability insurance as a condition of licensure, and a lapse can lead to suspension of the license. Working during a suspension carries the same risks as working unlicensed.

Question 16Oregon Contractor Business Practices and Law

An Oregon contractor is hired to build a detached garage. The homeowner wants the contractor to also act as the general contractor coordinating a roofer and an electrician. What license does the contractor need?

  1. A residential general contractor license Correct answer.
  2. No license, because the garage is a detached structure
  3. A commercial general contractor license only
  4. A residential specialty license limited to carpentry

Explanation

Coordinating two or more unrelated trades on a residential project requires a residential general contractor license. The nature of the structure, detached or attached, does not remove the licensing requirement.

Question 17Oregon Contractor Business Practices and Law

Which practice best reflects an Oregon contractor's obligation regarding subcontractors on a residential project?

  1. The prime contractor is responsible for licensing only the trades it performs itself
  2. The prime contractor should verify each subcontractor holds a current CCB license Correct answer.
  3. The prime contractor may use unlicensed subs if the prime supervises them closely
  4. The prime contractor may rely on the homeowner to check subcontractor licenses

Explanation

Oregon's licensing scheme expects contractors to use properly licensed subcontractors, and the prime contractor bears practical responsibility for verifying that status. Close supervision or homeowner checks do not substitute for a valid license.

Question 18Oregon Contractor Business Practices and Law

A homeowner wants to cancel a home solicitation contract two days after signing it in their living room. Which statement is most accurate under Oregon law?

  1. Cancellation is allowed only if the contractor has not yet started work
  2. Cancellation within the three-business-day window is generally allowed with written notice Correct answer.
  3. Cancellation is allowed only for contracts over $10,000
  4. Cancellation requires the homeowner to pay a 25 percent penalty

Explanation

Oregon's home solicitation rules give buyers a three-business-day right to cancel, exercised by written notice to the contractor. The right is not conditioned on a dollar threshold or on whether work has begun.

Question 19Oregon Contractor Business Practices and Law

Which statement best describes the CCB's dispute resolution process for a homeowner complaint about workmanship?

  1. The CCB automatically issues a criminal citation to the contractor
  2. The CCB transfers all complaints to the circuit court for trial
  3. The CCB requires the homeowner to pay the contractor's attorney fees
  4. The CCB may order the contractor to repair or pay damages through its administrative process Correct answer.

Explanation

The CCB can order remedies such as repair, correction, or payment of damages through its administrative complaint process. It is not a criminal enforcement body and does not automatically route every complaint to court.

Question 20Oregon Contractor Business Practices and Law

A contractor is asked to provide a written estimate. Under Oregon practice, which statement is most accurate about estimates and contracts?

  1. An estimate must be notarized to be enforceable
  2. An estimate is always a binding contract at the stated price
  3. An estimate may not be provided before the CCB license number is issued
  4. An estimate is not binding unless the parties agree it is a firm offer Correct answer.

Explanation

An estimate is generally a good-faith projection rather than a binding contract unless the parties expressly agree otherwise. Binding obligations arise from the signed contract, which must contain required disclosures.

Question 21Oregon Contractor Business Practices and Law

Which document must an Oregon contractor provide to a homeowner at the time of contracting to address the homeowner's potential claim against the contractor's bond?

  1. A list of the contractor's prior clients
  2. A notice of the homeowner's right to file a claim against the contractor's bond Correct answer.
  3. A letter from the contractor's bank confirming credit
  4. A copy of the contractor's tax return

Explanation

Oregon's contractor bond framework gives consumers a route to claim against the surety bond, and required notices inform homeowners of that right. Tax returns, bank letters, and client lists are not required contract disclosures.

Question 22Oregon Contractor Business Practices and Law

A contractor completes a job and the homeowner later discovers a defect. Which statement best reflects Oregon's approach to contractor responsibility after completion?

  1. The contractor is immune from claims once final payment is received
  2. The contractor is liable only if the defect appears within 30 days
  3. The contractor may still face CCB complaints and civil claims within applicable limits Correct answer.
  4. The contractor's bond covers all defects indefinitely

Explanation

Completion and final payment do not extinguish a contractor's exposure to CCB complaints or civil claims within the applicable statutes and contract terms. Bonds and insurance have their own limits and do not provide indefinite coverage.

Question 23Oregon Contractor Business Practices and Law

An Oregon contractor wants to use a contract clause that requires the homeowner to waive all claims against the contractor before any work begins. How is such a clause likely treated?

  1. It is enforceable because parties may contract freely
  2. It is enforceable if the homeowner initials each page
  3. It is enforceable only if the contract exceeds $25,000
  4. It is likely unenforceable as against public policy Correct answer.

Explanation

Oregon consumer protection principles disfavor clauses that prospectively strip homeowners of statutory rights, and such waivers are likely unenforceable. Initialing pages or a dollar threshold does not cure an otherwise invalid waiver.

Question 24Oregon Contractor Business Practices and Law

Which fee or filing does Oregon require of a contractor at the time of initial licensing with the CCB?

  1. A deposit held by the CCB equal to the largest contract the contractor will sign
  2. A membership fee paid to a private trade association
  3. A one-time application fee and proof of the required bond and insurance Correct answer.
  4. An annual payment to the state building codes division equal to 10 percent of revenue

Explanation

Initial Oregon contractor licensing involves an application fee plus evidence of the required surety bond and liability insurance. Revenue-based payments, large deposits, and private association dues are not licensing requirements.

Question 25Oregon Contractor Business Practices and Law

A contractor's license is suspended by the CCB. Which statement best describes the contractor's ability to enter new contracts during the suspension?

  1. The contractor may contract only for jobs under $1,000
  2. The contractor may sign new contracts if a deposit is refundable
  3. The contractor may not lawfully contract for or perform work requiring a license Correct answer.
  4. The contractor may sign new contracts but not start work

Explanation

A suspended license means the contractor is not licensed, so entering contracts for or performing work that requires a license is unlawful during the suspension. There is no small-job or refundable-deposit exception.

Question 26Oregon Contractor Business Practices and Law

Under Oregon CCB rules, what is the minimum required general liability insurance coverage for a licensed residential general contractor?

  1. $100,000 per occurrence
  2. $500,000 per occurrence
  3. $1,000,000 per occurrence Correct answer.
  4. $250,000 per occurrence

Explanation

Oregon requires residential general contractors to carry at least $1,000,000 in general liability insurance per occurrence. This coverage must be maintained continuously while the license is active. The CCB verifies insurance through the insurer, and a lapse can lead to license suspension.

Question 27Oregon Contractor Business Practices and Law

An Oregon contractor is preparing a bid for a public improvement project. Which statement about bid requirements is correct?

  1. The contractor must be licensed at the time of bid opening. Correct answer.
  2. Bid bonds are optional and not regulated by the CCB.
  3. The contractor may submit a bid without a license if licensed by award.
  4. A bid bond is required for all public projects regardless of size.

Explanation

Oregon law requires that a contractor be licensed at the time of bid opening for public improvement projects. This ensures only qualified contractors can bid. Being licensed only at the time of award is not sufficient.

Question 28Oregon Contractor Business Practices and Law

A contractor licensed by the CCB wants to add a new business name to their license. What is the correct procedure?

  1. Submit a license change request to the CCB and pay the required fee. Correct answer.
  2. Notify the CCB in writing within 10 days of the change.
  3. No action is needed if the contractor operates as a sole proprietor.
  4. File an assumed business name with the Secretary of State only.

Explanation

To add a business name, the contractor must file a change request with the CCB and pay the applicable fee. The CCB must approve the change before the contractor can operate under the new name. Simply filing with the Secretary of State does not update the CCB license.

Question 29Oregon Contractor Business Practices and Law

Which Oregon law governs the handling of funds received by a contractor for residential construction?

  1. The contractor must deposit all funds into a trust account. Correct answer.
  2. The contractor must maintain separate records but may commingle funds.
  3. There is no specific law; it is a matter of contract.
  4. The contractor may use funds from one project for another as long as debts are paid.

Explanation

Oregon's construction trust law requires that funds received for a residential project be held in trust for the benefit of subcontractors, material suppliers, and others. Commingling or using funds for other projects can constitute theft. Contractors must maintain proper accounting.

Question 30Oregon Contractor Business Practices and Law

A homeowner files a complaint with the CCB about a contractor's workmanship. What is the CCB's typical first step?

  1. Attempt to resolve the dispute through mediation or arbitration. Correct answer.
  2. Immediately suspend the contractor's license.
  3. Require the contractor to refund all payments.
  4. Refer the complaint to the Attorney General for prosecution.

Explanation

The CCB generally attempts to resolve disputes through its mediation or arbitration programs before taking disciplinary action. This gives both parties an opportunity to resolve issues informally. Only if resolution fails does the CCB pursue formal disciplinary measures.

Question 31Oregon Contractor Business Practices and Law

Under Oregon's home improvement contract requirements, what must be included in the contract regarding the homeowner's right to cancel?

  1. No cancellation notice is required if the contract is signed at the contractor's office.
  2. A clause waiving the homeowner's right to cancel if work begins immediately.
  3. A notice of the homeowner's right to cancel if the contract was solicited at the home. Correct answer.
  4. A statement that the homeowner has three days to cancel for any reason.

Explanation

Oregon law requires home improvement contracts to include a notice of the homeowner's right to cancel when the contract results from a home solicitation. The notice must be in a specific format and inform the homeowner of the three-day cancellation period. Failure to include it can extend the cancellation period.

Question 32Oregon Contractor Business Practices and Law

An Oregon contractor is hired to remodel a kitchen. The contract includes a clause stating that the contractor is not responsible for any defects in the work. Is this clause enforceable?

  1. No, because Oregon law prohibits waivers of the implied warranty of workmanlike performance. Correct answer.
  2. No, unless the contractor provides a written warranty.
  3. Yes, because the parties are free to contract as they wish.
  4. Yes, if the homeowner initialed the clause separately.

Explanation

Oregon law implies a warranty of workmanlike performance in construction contracts, and contractors cannot disclaim it. Such a clause is void as against public policy. Homeowners retain the right to hold contractors accountable for defective work.

Question 33Oregon Contractor Business Practices and Law

What is the maximum civil penalty the CCB may impose per violation against a licensed contractor?

  1. $10,000
  2. $2,000
  3. $5,000 Correct answer.
  4. $1,000

Explanation

Under Oregon law, the CCB may impose a civil penalty of up to $5,000 per violation. This penalty is in addition to any other disciplinary actions, such as suspension or revocation. The amount is determined based on the severity of the violation.

Question 34Oregon Contractor Business Practices and Law

A contractor's license is revoked by the CCB. How soon may the contractor apply for a new license?

  1. After two years from the date of revocation. Correct answer.
  2. After five years from the date of revocation.
  3. Immediately, if all fines are paid.
  4. After one year from the date of revocation.

Explanation

Oregon law requires a two-year waiting period after license revocation before a contractor may apply for a new license. This period allows the CCB to ensure the contractor has addressed the issues leading to revocation. Applying earlier is not permitted.

Question 35Oregon Contractor Business Practices and Law

Which statement best describes the CCB's authority to inspect a contractor's records?

  1. The CCB may inspect records only with a court order.
  2. The CCB has no authority to inspect records.
  3. The CCB may inspect records only if a complaint has been filed.
  4. The CCB may inspect records during normal business hours without a warrant. Correct answer.

Explanation

The CCB has statutory authority to inspect a contractor's records during normal business hours to verify compliance with licensing laws. This authority does not require a warrant or a prior complaint. Refusing inspection can result in disciplinary action.

Question 36Oregon Contractor Business Practices and Law

A contractor is working on a residential project and receives a written notice of a construction lien from a subcontractor. What must the contractor do to protect the homeowner?

  1. Pay the subcontractor immediately to avoid lien enforcement.
  2. Ignore the lien because the subcontractor was not hired directly.
  3. Advise the homeowner to sue the subcontractor.
  4. Provide the homeowner with a lien release or bond to clear the lien. Correct answer.

Explanation

When a subcontractor files a lien, the contractor should provide the homeowner with a lien release or post a bond to remove the lien from the property. This protects the homeowner from liability. The contractor may also have a duty to indemnify the homeowner.

Question 37Oregon Contractor Business Practices and Law

Under Oregon's contractor licensing law, what is required for an initial CCB license in addition to the required pre-license education and examination?

  1. Have a minimum net worth of $10,000.
  2. Pass a written exam and have at least four years of experience.
  3. Complete a CCB-approved pre-license course.
  4. Provide proof of insurance and pay the license fee. Correct answer.

Explanation

An initial CCB license applicant must provide proof of general liability insurance and pay the required license fee. The ordinary process also includes pre-license education and examination through the responsible managing individual (RMI), which the stem has already accounted for. These are requirements within a larger licensing process.

Question 38Oregon Contractor Business Practices and Law

A contractor is hired to build a new home. The contract states that arbitration is required for any dispute. The homeowner later sues for construction defects. What is the likely outcome?

  1. The court may compel arbitration unless the homeowner can show the clause is unconscionable. Correct answer.
  2. The court will automatically dismiss the lawsuit because of the arbitration clause.
  3. The arbitration clause is unenforceable in residential construction contracts.
  4. The homeowner may choose between arbitration and litigation.

Explanation

Oregon courts generally enforce valid arbitration clauses in construction contracts. However, the court may refuse to compel arbitration if the clause is unconscionable or violates public policy. The homeowner cannot simply choose to litigate if a valid clause exists.

Question 39Oregon Contractor Business Practices and Law

What is the purpose of the CCB's contractor education requirement for license renewal?

  1. To ensure contractors are aware of changes in building codes and laws. Correct answer.
  2. To satisfy federal mandates.
  3. To generate revenue for the CCB.
  4. To provide a barrier to entry for new contractors.

Explanation

The CCB requires continuing education to keep contractors informed about updates to building codes, safety regulations, and business practices. This helps maintain industry standards and protect consumers. It is not intended as a revenue source or barrier.

Question 40Oregon Contractor Business Practices and Law

An Oregon contractor is offered a job that requires a specialty license they do not hold. What should the contractor do?

  1. Accept the job and subcontract the specialty work to a licensed subcontractor. Correct answer.
  2. Accept the job and perform the work under their existing license.
  3. Accept the job and apply for the specialty license after starting work.
  4. Decline the job unless they obtain the required specialty license.

Explanation

A contractor may accept a job that includes specialty work if they subcontract that portion to a properly licensed specialty contractor. The general contractor remains responsible for the overall project but cannot perform specialty work without the appropriate license. Performing the work without a license can lead to penalties.

Question 41Oregon Building Codes and Administrative Provisions

Under the Oregon Residential Specialty Code, who may lawfully perform HVAC work on a one- and two-family dwelling without holding a license issued by the Building Codes Division?

  1. Any person employed by a licensed general contractor
  2. The real estate agent listing the property
  3. The owner of the dwelling who occupies it as a residence Correct answer.
  4. Any person supervised by a licensed electrician

Explanation

Oregon's residential specialty code and licensing statutes allow an owner-occupant of a single-family dwelling or duplex to do work on their own home without a contractor license, provided the property is their residence and not offered for sale or rent within a set period. Employees of a general contractor must still hold the appropriate trade license, and neither real estate agents nor electricians are authorized to perform HVAC work.

Question 42Oregon Building Codes and Administrative Provisions

A licensed HVAC contractor in Oregon must notify the Building Codes Division within what timeframe after a change in the business's principal address?

  1. 60 days
  2. 30 days
  3. 10 days Correct answer.
  4. 180 days

Explanation

Oregon contractor licensing rules require licensees to report certain changes, including a change of business address, to the Building Codes Division within 10 days of the change. Prompt notice keeps the license record accurate so the division can reach the contractor about permits, complaints, and renewals. Longer periods apply to other events such as license renewal, not to address changes.

Question 43Oregon Building Codes and Administrative Provisions

Which Oregon permit type is required before installing a new forced-air furnace in an existing single-family home?

  1. An electrical permit only
  2. No permit, because the home is existing
  3. A plumbing permit only
  4. A mechanical permit Correct answer.

Explanation

Replacing or installing a furnace is mechanical work and requires a mechanical permit from the local building department or the Building Codes Division. A separate electrical permit may also be needed for the circuit, but it does not substitute for the mechanical permit. Existing occupancy does not exempt new mechanical installations.

Question 44Oregon Building Codes and Administrative Provisions

In Oregon, a permit for mechanical work generally expires if the work has not commenced within what period after issuance, unless the permit is extended?

  1. Six months Correct answer.
  2. Twelve months
  3. Twenty-four months
  4. Thirty-six months

Explanation

Oregon building permit provisions state that a permit expires if work does not begin within six months of issuance, and it may also expire after six months of inactivity. Contractors must therefore schedule installation promptly or request an extension from the issuing authority. The longer periods listed do not match the standard permit expiration rule.

Question 45Oregon Building Codes and Administrative Provisions

Which document must an Oregon-licensed HVAC contractor provide to a homeowner before signing a contract for a residential installation?

  1. A performance bond equal to the contract price
  2. A notarized lien waiver
  3. A written contract containing the required consumer notice and contractor license number Correct answer.
  4. A copy of the contractor's personal tax return

Explanation

Oregon consumer protection rules for residential contractors require a written contract that includes the contractor's license number and a notice informing the consumer of the right to contact the Building Codes Division and of lien rights. This disclosure protects homeowners before they commit to the work. Notarized lien waivers, tax returns, and full performance bonds are not prerequisites to signing.

Question 46Oregon Building Codes and Administrative Provisions

Oregon's specialty code adoption process requires that new editions of the mechanical code be adopted through which action?

  1. An executive order issued by the governor each code cycle
  2. A rule adopted by the Building Codes Division following public review Correct answer.
  3. Direct adoption by each city council without state involvement
  4. A vote of the licensed contractors in each county

Explanation

The Building Codes Division adopts statewide specialty codes, including the mechanical code, by administrative rule after a public review and comment process. Statewide adoption keeps requirements consistent across jurisdictions rather than varying by county or city. Individual local governments do not adopt their own competing editions of the mechanical code.

Question 47Oregon Building Codes and Administrative Provisions

An Oregon HVAC contractor performing work in a city that administers its own building program must obtain the mechanical permit from which authority?

  1. The Building Codes Division central office in Salem in all cases
  2. The county sheriff's office
  3. The city building department that administers the local program Correct answer.
  4. The Oregon Department of Environmental Quality

Explanation

Oregon allows certain cities and counties to administer their own building inspection programs, and in those jurisdictions the local building department issues the mechanical permit. The Building Codes Division issues permits where no local program exists. Law enforcement and environmental agencies have no permitting role for mechanical installations.

Question 48Oregon Building Codes and Administrative Provisions

Which Oregon rule applies to a contractor who begins HVAC work before obtaining the required permit?

  1. The contractor may proceed if the work is inspected later
  2. The contractor receives a discount on the permit fee
  3. The contractor is automatically issued a license renewal
  4. The contractor is subject to civil penalties and inspection may be required to expose concealed work Correct answer.

Explanation

Oregon building codes prohibit starting work that requires a permit before the permit is issued, and violations can result in civil penalties and orders to uncover concealed work for inspection. Beginning early does not create retroactive authorization. There is no fee discount or licensing benefit for unpermitted work.

Question 49Oregon Building Codes and Administrative Provisions

An Oregon HVAC contractor is installing a gas-fired rooftop unit on a commercial building. Which code governs the fuel-gas piping portion of the installation?

  1. The Oregon Fire Code alone
  2. The Oregon Plumbing Specialty Code's fuel gas provisions as adopted by rule Correct answer.
  3. The Oregon Structural Specialty Code alone
  4. The Oregon Electrical Specialty Code

Explanation

Oregon adopts fuel gas requirements through its plumbing specialty code, which incorporates fuel gas piping provisions for gas appliances, including commercial rooftop units. Electrical, fire, and structural codes may impose related requirements but do not govern gas piping installation. Contractors must use the adopted fuel gas provisions for sizing, materials, and testing.

Question 50Oregon Building Codes and Administrative Provisions

A homeowner in an unincorporated area wants to install a ductless heat pump. Which Oregon authority typically issues the mechanical permit when no local building program exists?

  1. The state fire marshal
  2. The local school district
  3. The Building Codes Division Correct answer.
  4. The county assessor

Explanation

Where a city or county has not been delegated building program authority, the Building Codes Division issues mechanical permits and provides inspection services. The county assessor, school district, and fire marshal do not administer mechanical permits. Contractors should verify local delegation before submitting an application.