NFPA PACE / RP study materials
NFPA PACE / RP study resources

NFPA PACE / RP study plan

NFPA PACE / RP · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Public Assembly Code Enforcement (PACE)

  • Map the PACE domain into its core subtopics: occupancy classification, means of egress, crowd manager duties, and inspection/enforcement workflow, and write a one-page outline of each

  • Define the three egress components (exit access, exit, exit discharge) in your own words and sketch a sample assembly layout labeling each

  • List the occupancy groups most often found in public assembly venues and state the trigger that changes a classification

  • Build a personal glossary of 25 PACE terms with a plain-language definition for each

Your checkpoint

A 4-page PACE subtopic outline plus a 25-term glossary, self-scored against the outline for gaps

Week 2

Public Assembly Code Enforcement (PACE)

  • Compute required egress width and number of exits for three worked assembly scenarios using occupant load factors

  • Explain travel distance and common path limits and apply them to two floor plans you draw yourself

  • Describe the difference between a permit review, a periodic inspection, and a complaint-driven inspection, and note what documentation each produces

  • Draft a 10-item pre-inspection checklist an inspector could carry into an assembly venue

Your checkpoint

Three solved occupant-load/egress worksheets showing inputs, formulas, and final answers

Week 3

Public Assembly Code Enforcement (PACE)

  • Identify the most common assembly violations (blocked exits, overcrowding, inadequate crowd managers, obstructed signage) and state the corrective action for each

  • Outline the enforcement escalation path from verbal correction to citation to closure, and note where due process and appeals fit

  • Practice writing two mock notices of violation with specific code references and a compliance deadline

  • Summarize crowd manager ratio requirements and the duties that follow from that role

Your checkpoint

Two mock notices of violation plus a one-page enforcement escalation flowchart

Week 4

Public Assembly Code Enforcement (PACE) & Residential Property (RP)

  • Complete a timed 40-question mixed set drawn from PACE subtopics and log every miss by cause (knowledge gap, misread, calculation error)

  • Review each logged miss and write the underlying rule in one sentence

  • Skim the RP domain headings to preview what weeks 5-7 will cover and flag overlaps with PACE

Your checkpoint

A scored 40-question practice set with a written error log categorizing every miss

Week 5

Residential Property (RP)

  • Map the RP domain into its core subtopics: rental property registration, inspection triggers, habitability standards, and owner/tenant responsibilities

  • Define the minimum habitability elements (sanitation, heat, water, structural integrity, smoke/CO detection) and the standard each is measured against

  • Explain how a rental registration or licensing program works and what happens when a property is unregistered

  • List the records a landlord must keep and the retention period you can confirm

Your checkpoint

A 3-page RP subtopic map with a habitability standards table

Week 6

Residential Property (RP)

  • Trace the lifecycle of a residential inspection from complaint intake through reinspection and closure

  • Draft a 12-point residential inspection checklist covering exterior, interior, mechanical, and life-safety items

  • Describe tenant remedies and landlord defenses in habitability disputes and identify where the code inspector's authority ends

  • Compare inspection frequency and triggers for single-family rentals versus multi-unit buildings

Your checkpoint

A 12-point residential inspection checklist plus a one-page inspection lifecycle diagram

Week 7

Residential Property (RP)

  • Work through five scenario questions on nuisance, overoccupancy, and illegal unit conversions, writing the reasoning before checking any answer

  • Summarize how registration data supports proactive enforcement and what data quality problems arise

  • Review your week 4 error log and confirm each PACE gap is now closed or flag it for week 8

Your checkpoint

Five written scenario analyses with reasoning shown and a closed/flagged status on each week 4 error

Week 8

Public Assembly Code Enforcement (PACE) & Residential Property (RP)

  • Take two full-length timed practice exams under test conditions and record section-level scores

  • Re-drill only the subtopics scoring below 75 percent, capping each drill at 20 questions

  • Write a one-page final review sheet of formulas, ratios, and enforcement steps from memory, then correct it against your notes

Your checkpoint

Two timed practice exam scores plus a corrected one-page final review sheet

Milestones

Week 2: Can compute occupant load, required egress width, and minimum exits for an assembly space without notes, and explain each step aloud

Week 4: Scores at least 70 percent on the 40-question PACE-heavy mixed set, with every miss logged and categorized

Week 6: Can describe the full residential inspection lifecycle and the minimum habitability standards from memory in under 10 minutes

Week 8: Scores at least 80 percent on both full-length timed practice exams with no subtopic below 75 percent