- Factor of Safety
- Related: Geometric Dimensioning and Tolerancing (GD&T)
The ratio of a component's strength, or allowable stress, to the maximum stress it is expected to carry in service. Values above one provide margin against unexpected loads, material defects, and modeling uncertainty.
- Geometric Dimensioning and Tolerancing (GD&T)
- Related: Factor of Safety, Design for Manufacturability
A standardized symbolic language on engineering drawings that specifies allowable variation in form, orientation, location, and size of features. Tolerance zones are defined relative to datums so parts assemble and function without ambiguous dimensioning.
- Time Value of Money
- Related: Minimum Attractive Rate of Return (MARR), Internal Rate of Return (IRR)
The principle that a sum of money today is worth more than the same sum received later, because money can earn interest or returns. It underlies discounting future cash flows to a common point in time.
- Minimum Attractive Rate of Return (MARR)
- Related: Internal Rate of Return (IRR), Time Value of Money
The lowest rate of return an organization requires before committing capital to a project. It reflects the cost of capital plus a risk premium and serves as the discount rate in present-worth and annual-worth comparisons.
- Internal Rate of Return (IRR)
- Related: Minimum Attractive Rate of Return (MARR), Time Value of Money
The discount rate that makes the net present value of a project's cash flows equal to zero. A project is attractive when its IRR exceeds the organization's minimum attractive rate of return.
- Payback Period
- Related: Time Value of Money
The time required for cumulative cash inflows to recover the initial investment. It is simple and widely used for screening, but it ignores cash flows after payback and the time value of money.
- Central Limit Theorem
- Related: Confidence Interval
A theorem stating that the distribution of the sum or average of many independent random variables approaches the normal distribution as sample size grows, regardless of the underlying distribution. It justifies normal-based methods for sample means.
- Confidence Interval
- Related: Central Limit Theorem, Work Sampling
A range of values computed from sample data that is expected to contain the true population parameter with a stated probability over repeated sampling. Its width shrinks as sample size increases or variability decreases.
- Type I Error
- Related: Acceptance Sampling, Confidence Interval
Rejecting a null hypothesis that is actually true, which is a false alarm. Its probability equals the significance level alpha, and it trades off against Type II error, the chance of failing to detect a real effect.
- Linear Programming
- Related: Shadow Price
An optimization method for maximizing or minimizing a linear objective function subject to linear equality and inequality constraints. The feasible region is a convex polytope, and an optimal solution occurs at a vertex.
- Shadow Price
- Related: Linear Programming
The marginal change in the optimal objective value caused by relaxing a constraint by one unit while all else is held constant. It shows which constrained resources most limit performance and are worth expanding.
- M/M/1 Queue
- Related: Little's Law
A single-server waiting-line model in which arrivals follow a Poisson process and service times are exponentially distributed, served first-come first-served. Standard formulas give utilization, average queue length, and average waiting time.
- Monte Carlo Simulation
- Related: Central Limit Theorem
A technique that repeatedly samples random values for uncertain inputs, evaluates the model each time, and summarizes the resulting distribution of outcomes. It handles complexity and randomness that closed-form analytical models cannot.
- Lean Manufacturing
- Related: Master Production Schedule
A production philosophy focused on eliminating waste such as excess inventory, waiting, motion, defects, overproduction, transport, and overprocessing while improving flow. Typical tools include just-in-time delivery, kanban, standardized work, and continuous improvement.
- Design for Manufacturability
- Related: Geometric Dimensioning and Tolerancing (GD&T), Lean Manufacturing
Designing products so they are easy and economical to make and assemble by simplifying part count, tolerances, features, and fastening. Early attention to process capability lowers cost and defects later in the program.
- Taylor Tool Life Equation
- Related: Computer Numerical Control (CNC)
An empirical relationship, VT^n = C, linking cutting speed V and tool life T for a given tool and workpiece combination. The exponent n and constant C are found experimentally and guide speed and feed selection.
- Computer Numerical Control (CNC)
- Related: Taylor Tool Life Equation
The use of programmed instructions to drive machine tools along precise paths. Programs specify coordinates, feeds, and speeds, enabling repeatable, complex, and automated machining of parts.
- Master Production Schedule
- Related: Material Requirements Planning
A statement of which end products will be produced and when, stated by item and time period over a short horizon. It drives material requirements planning and is constrained by capacity and demand forecasts.
- Material Requirements Planning
- Related: Master Production Schedule, Economic Order Quantity
A planning technique that explodes the master production schedule through bills of material to determine required quantities and timing of components, using lead times, on-hand inventory, and lot-sizing rules.
- Johnson's Rule
- Related: Master Production Schedule
A sequencing procedure that minimizes total makespan for a set of jobs processed through two machines in the same order. It repeatedly schedules the shortest processing time at the appropriate end of the sequence.
- Little's Law
- Related: M/M/1 Queue, Bullwhip Effect
For a stable system in steady state, the average number of items in the system equals the average arrival rate multiplied by the average time an item spends in the system, written L = lambda times W.
- From-To Chart
- Related: Load-Distance Model, Unit Load
A matrix showing the quantity of material flowing from each department or location to every other one. It reveals dominant flows and is used to arrange departments so heavy traffic travels short distances.
- Load-Distance Model
- Related: From-To Chart
A layout evaluation method that sums flow volumes multiplied by travel distances between departments. Lower total load-distance scores indicate more efficient arrangements when comparing layout alternatives.
- Unit Load
- Related: From-To Chart
The quantity of material handled as a single unit, such as a pallet, tote, or container. Standardizing unit loads permits mechanized handling, faster moves, and less damage than piece-by-piece handling.
- Control Chart
- Related: Process Capability Index (Cpk), Pareto Chart
A time-ordered plot of a process statistic with a center line and statistically derived control limits. Points beyond the limits or nonrandom patterns signal special-cause variation, prompting investigation instead of routine adjustment.
- Process Capability Index (Cpk)
- Related: Control Chart
An index equal to the smaller distance from the process mean to either specification limit, divided by three standard deviations. It measures how well a stable process fits inside its specifications.
- Acceptance Sampling
- Related: Type I Error
Deciding whether to accept or reject a lot by inspecting a sample rather than every unit. Plans specify sample size and acceptance number and carry defined producer's and consumer's risks.
- Pareto Chart
- Related: Control Chart
A bar chart of problem categories ordered from largest to smallest frequency, often with a cumulative percentage line. It applies the idea that a few causes account for most of the effect.
- Standard Time
- Related: Predetermined Motion Time System, Work Sampling
The time a qualified worker, working at a normal pace with a specified method, needs to complete a task, including allowances for fatigue, personal needs, and delays. It supports costing, capacity planning, and incentive plans.
- Predetermined Motion Time System
- Related: Standard Time, Work Sampling
A system that assigns tabulated times to basic motions such as reach, grasp, and move, letting a task's time be built up without stopwatch observation. MTM and MOST are common examples.
- Work Sampling
- Related: Standard Time, Confidence Interval
Estimating the proportion of time spent on various activities by taking many random instantaneous observations of a work group. Statistical confidence depends on the number of observations and the observed proportion.
- NIOSH Lifting Equation
- Related: Standard Time
A tool that computes a recommended weight limit for manual lifting by scaling a load constant with factors for horizontal and vertical distance, asymmetry, frequency, coupling, and task duration.
- Economic Order Quantity
- Related: Safety Stock, ABC Classification
The order size that minimizes the sum of annual ordering cost and annual holding cost under constant demand and known costs. It balances larger, less frequent orders against higher inventory carrying costs.
- Safety Stock
- Related: Economic Order Quantity, Bullwhip Effect
Extra inventory held to buffer against demand variability and lead-time uncertainty, reducing the chance of stockouts. Higher service-level targets require more safety stock and therefore more holding cost.
- Bullwhip Effect
- Related: Safety Stock, Little's Law
The amplification of demand variability as orders move upstream from customers to suppliers. Common causes include forecast updating, order batching, price promotions, and rationing during shortages.
- ABC Classification
- Related: Economic Order Quantity, Safety Stock
Ranking inventory items by annual dollar usage so that a small fraction, the A items, accounts for most of the value. Control effort is concentrated on A items, with looser control for B and C items.
- Hierarchy of Controls
- Related: HAZOP, Fault Tree Analysis
A ranking of hazard controls by effectiveness: elimination, substitution, engineering controls, administrative controls, and personal protective equipment. Earlier options protect everyone and depend less on individual behavior.
- HAZOP
- Related: Fault Tree Analysis, Hierarchy of Controls
A structured team study that applies guide words such as no, more, less, reverse, and as well as to process parameters at each node to identify deviations, causes, consequences, and safeguards.
- Fault Tree Analysis
- Related: HAZOP, Hierarchy of Controls
A deductive method that starts from an undesired top event and works backward through AND/OR logic gates to identify combinations of component failures and human errors that could cause it.