PE Industrial study materials
PE Industrial study resources

PE Industrial: Safety, Health, and Environment

PE Industrial · Work through your exam, one topic at a time.

All guide sections

Safety, Health, and Environment

Protecting people, plant, and environment, measured with the formulas OSHA and EPA actually use.

Hazard and control

The hierarchy of controls, from most to least effective: elimination, substitution, engineering controls, administrative controls, then personal protective equipment. PPE is the last line of defense, not the first. Hazard analysis tools: HAZOP applies guide words to process nodes; FMEA scores risk priority number = severity × occurrence × detection; fault trees reason deductively from a top event; job safety analysis breaks a task into steps and hazards. Lockout/tagout controls hazardous energy during maintenance, and confined-space entry requires atmospheric testing, ventilation, an attendant, and a permit.

Exposure measurement

OSHA noise: 90 dBA time-weighted average over 8 hours as the permissible exposure limit, 85 dBA action level for hearing conservation, and a 5 dB exchange rate - so 95 dBA is allowed for only 4 hours. Heat stress is assessed with WBGT plus acclimatization and work/rest cycles. Industrial hygiene limits include TLV-TWA, STEL, and ceiling; an 8-hour exposure is concentration × time ÷ 8 hours.

Metrics

Incidence rate = (recordable cases × 200,000) ÷ hours worked, where 200,000 = 100 workers × 40 hours × 50 weeks. DART counts days away, restricted, or transferred cases. First aid is generally not recordable; medical treatment beyond first aid is.

Environment

Clean Air Act, Clean Water Act, RCRA (cradle-to-grave hazardous waste; large quantity generator ≥ 1,000 kg/month), CERCLA, and EPCRA/SARA Title III reporting. Pollution prevention hierarchy: source reduction, recycling, treatment, disposal.

Traps

Calling PPE an engineering control; using a 3 dB instead of 5 dB exchange rate; using 100,000 instead of 200,000 in the incidence rate; treating a first-aid case as recordable.

Worked example

Seven recordable cases over 450,000 hours: (7 × 200,000)/450,000 = 3.11 cases per 100 full-time workers.