Diesel Load Outruns the Auxiliary Ventilation

PE Mining · Put your knowledge to work in context.

All case studies

Diesel Load Outruns the Auxiliary Ventilation

A single-heading decline at 350 m is ventilated by a 1.2 m diameter forcing column delivering 22 m3/s at the face; the fan is rated 30 m3/s at the collar. Working at the face: one 200 kW development jumbo and two 250 kW diesel loaders, all running during mucking. The heading is 6.0 m wide x 5.5 m high. The site standard requires a minimum of 0.05 m3/s of air per kW of installed diesel power at the face, and a minimum air velocity of 0.25 m/s in development headings. Operators report headaches and eye irritation by mid-shift. NO2 at the operator position reads 4.5 ppm against an 8-hour TWA limit of 3 ppm (ceiling 5 ppm). Rock temperature is 31 degrees C and the decline is dry.

1. Calculate the airflow required at the face and assess compliance.

Read the worked answer

Diesel dilution requirement

  • Installed diesel power at the face = 200 + 2 x 250 = 700 kW
  • Required air = 700 x 0.05 = 35 m3/s

Velocity check

  • Face area = 6.0 x 5.5 = 33 m2
  • Current velocity = 22 / 33 = 0.67 m/s
  • Velocity needed for 35 m3/s = 35 / 33 = 1.06 m/s

Assessment

  • The heading passes the velocity rule (0.67 m/s is above the 0.25 m/s floor) and fails the diesel rule: 22 m3/s delivered against 35 m3/s required, a 13 m3/s (37%) shortfall.
  • This is the trap in the question: velocity compliance is a floor for mixing, not a design criterion. Where diesel is the contaminant source, the kW-based rule governs.
  • Note also that 35 m3/s is a contaminant criterion, not a thermal one. At 31 degrees C with 700 kW of diesel dumping heat into the airway, the heat balance may require more air again - check it before sizing the fan.

2. The fan is rated 30 m3/s at the collar but only 22 m3/s reaches the face. What do you do?

Read the worked answer

First, diagnose the loss

  • 8 m3/s lost over 350 m = 27% loss, about 0.077% per metre. Well-maintained ducting runs at 0.02-0.03%/m (a few percent to about 10% total).
  • Suspect torn or holed sections, badly made or taped joints, crushed duct behind the jumbo, tight bends, and a baggy column running with excess internal pressure. Survey and repair.

Then recognise that repair alone is not enough Even a perfect column gives 30 m3/s, still short of 35 m3/s. So you have two levers:

  1. Reduce the diesel kW at the face - restrict to one loader at a time at the face (200 + 250 = 450 kW, needing 22.5 m3/s, which a repaired system nearly delivers), park the second unit on the fresh-air side, or move to an electric loader. This is usually the fastest and cheapest intervention and buys time.
  2. Upsize the system - larger duct (1.4-1.6 m), higher-pressure fan, or a dedicated secondary circuit. Beware bolting a booster onto the same flexible column: pressure rating and recirculation are real failure modes if intake and return are close.

Do not keep running by relying on the re-entry timer alone - the exposure is during the shift, not after the blast.

3. NO2 at the operator position is 4.5 ppm. Where is that coming from and what controls it?

Read the worked answer

Source and mechanism

  • Diesel engines are the source; the forcing column delivers air but the jet has not mixed at the muck pile, so the loader operator works in a pocket of exhaust downstream of the machine while nominally 'ventilated'.
  • NO2 is the acute problem (headaches, eye irritation, risk of methaemoglobin effects and, at higher concentrations, delayed pulmonary oedema). It is not fixed by adding airflow alone; the geometry matters.

Controls, in order of effectiveness

  1. Geometry: extend the duct to within about 10-15 m of the face and orient it to sweep the muck pile and the operator's position; keep the loader working on the fresh-air side with the exhaust discharging downwind.
  2. Source reduction: low-NOx engines, correct injector maintenance and tuning, diesel particulate filters or scrubbers, and reduced idling.
  3. Substitution: electric loader where the infrastructure allows.
  4. Monitoring: personal NO2 monitors with an alarm and a stop-work trigger; occupational hygiene sampling to confirm the TWA, not a one-off reading.
  5. Blasting: base the re-entry time on measured NO2 clearance rather than a fixed clock, and record it.

The 4.5 ppm reading is already close to the 5 ppm ceiling and comfortably above the 3 ppm TWA - treat it as a reportable over-exposure and investigate the whole shift, not just the sampling instant.