PE Mining study materials
PE Mining study resources

PE Mining study plan

PE Mining · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Mining methods and mine planning & Geotechnical engineering and ground control

  • Classify the main underground and surface coal and metal mining methods and match each to its typical equipment fleet, recovery range, and dilution profile

  • Build a sequencing logic diagram linking development, extraction, and reclamation stages for one surface and one underground case

  • Define the site characterization inputs (core logging, RQD, discontinuity mapping) that feed a ground control design

  • Compute the three most common rock mass classification indices from worked example inputs and interpret the resulting support categories

Your checkpoint

A 3-page method-selection comparison table covering at least 6 mining methods plus 20 solved rock mass classification and support-selection problems with worked steps

Week 2

Mining methods and mine planning & Drilling and blasting

  • Solve reserve, stripping ratio, and pit/underground cutoff grade problems using standard formulas without reference notes

  • Construct a production schedule that reconciles equipment productivity with monthly tonnage targets

  • Derive blast design parameters (burden, spacing, stemming, powder factor) from rock and explosive properties

  • Calculate explosive charge weights and cost per bank cubic meter for two contrasting blast layouts

Your checkpoint

One spreadsheet or handwritten model that produces a 12-month production schedule and a full blast design sheet for a specified bench geometry, checked against at least 15 practice calculations

Week 3

Geotechnical engineering and ground control & Drilling and blasting

  • Analyze slope stability using limit equilibrium concepts and identify the failure modes each method addresses

  • Diagnose pillar design, roof bolting, and longwall support requirements from given seam and strata conditions

  • Predict blast-induced vibration, flyrock, and airblast and select mitigation measures for each

  • Evaluate fragmentation and blast performance data to recommend design changes

Your checkpoint

A written ground control and blast performance case review (minimum 4 pages) resolving 3 scenario problems with calculations, recommendations, and stated assumptions

Week 4

Mine ventilation and environmental control

  • Compute air quantity requirements from tonnage, equipment fleet, and regulatory minimums for a multi-level mine

  • Size a primary and auxiliary ventilation circuit by calculating pressure losses through shafts, drifts, and ducting

  • Select fan operating points from characteristic curves and match them to the required duty

  • Apply methane, dust, diesel particulate, and heat control requirements to a ventilation layout

Your checkpoint

A complete ventilation network solution set: air quantity balance, pressure-loss table, fan selection with operating point, and a one-page compliance checklist; score at least 70% on a 40-question domain drill

Week 5

Mine ventilation and environmental control & Materials handling and mineral processing

  • Design a ventilation-on-demand or district reconfiguration response to a changed production plan

  • Trace material flow from face to product and identify the unit operations and their capacity constraints

  • Size crushers, screens, and conveyors against a specified throughput and product size distribution

  • Calculate recovery, grade, and concentration ratio from assay and mass-balance data

Your checkpoint

A closed mass balance around a two-stage crushing and screening circuit plus a two-product concentrator, reconciled to within 2% and paired with a one-page flow diagram

Week 6

Materials handling and mineral processing & Mine economics, health, and safety

  • Compute capital and operating cost estimates and derive unit costs per ton for major mining activities

  • Compare project alternatives using net present value, payback, and discounted cash flow analysis

  • Evaluate handling and processing bottlenecks and recommend debottlenecking options with cost justification

  • Apply mine health and safety regulations to typical hazard scenarios and select engineering controls in the hierarchy of controls

Your checkpoint

An investment comparison memo valuing two processing or handling alternatives with full cash flow tables, plus 20 answered health and safety scenario questions with cited regulatory basis

Week 7

Mine economics, health, and safety & Mining methods and mine planning

  • Complete economic sensitivity and risk analysis on a project and state the break-even variables

  • Define and apply the safety management system elements required for a mine site, including emergency response and incident investigation

  • Re-solve the weakest problem types from weeks 1-6 using only the permitted reference materials

  • Build a formula and reference sheet covering all six domains from memory, then verify against sources

Your checkpoint

A verified 4-page formula and reference sheet spanning all six domains plus a project risk register with 10 quantified sensitivities

Week 8

Mining methods and mine planning & Geotechnical engineering and ground control & Drilling and blasting & Mine ventilation and environmental control & Materials handling and mineral processing & Mine economics, health, and safety

  • Complete two full-length timed mock exams under exam conditions using the approved reference set

  • Classify every missed question by domain and root cause (knowledge gap, misread, calculation, reference lookup)

  • Rework every missed item to full solution and re-test on those items 48 hours later

  • Pace-check to confirm roughly 6 minutes per question and adjust lookup strategy

Your checkpoint

Two completed timed mock exams with a scored error log showing a second-attempt accuracy of at least 90% on missed items and a written final-week revision checklist

Milestones

Week 2: Score at least 70% on a 30-question mixed drill on domains 1 and 3, and complete the blast design sheet and schedule model without consulting solved examples

Week 4: Score at least 70% on a 40-question drill spanning domains 1-4, with a complete ventilation network solution and verified formula sheet started

Week 6: Score at least 75% on a 40-question drill spanning domains 4-6, with reconciled mass balance and completed cost comparison memo

Week 8: Achieve at least 75% overall on both timed mock exams, with at least 65% in every individual domain and a second-attempt accuracy above 90% on missed items