The Principles and Practice of Engineering (PE) exam in Mining and Mineral Processing is one of the more than 20 PE discipline exams offered by NCEES. It is a computer-based licensure exam that tests for a minimum level of competency in the discipline; NCEES describes the PE exam generally as designed for engineers who have gained a minimum of four years of post-college work experience in their chosen engineering field. The PE Mining case studies are 6 cases and about 4,390 words.

1

Marginal Cut-off Grade With a Half-Empty Mill

You are the planning engineer at an underground gold mine. The 1.20 Mt/y mill is fed by a 0.90 Mt/y sublevel stoping operation, so 300 kt/y of mill capacity sits idle.

640 words, about 3 min
2

Load-Out Bay Widening in Weak, Jointed Ground

During widening of a 5.0 m x 5.5 m decline into a 9 m wide load-out bay, a 1.5 m thick slab of crown rock fell between existing bolts in altered andesite (UCS about 25 MPa). Two joint sets control the failure: one smooth, clay-coated set striking across the drive at 45 degrees, and a second set at 70 degrees with 0.3-0.6 m spacing.

564 words, about 3 min
3

Vibration Limit, Fragmentation and a Village at 100 m

A 100 mm hole open-pit blast (8 m bench, 3.5 m burden, 3.0 m spacing, 42 kg emulsion per hole, 25 ms pyrotechnic delays) is 100 m from a village. Your seismograph at the nearest house records 14 mm/s peak particle velocity, and the site-specific regression from 20 monitored events is PPV = 700 x SD^(-1.5), where SD = distance (m) / square root of charge weight per delay (kg).

803 words, about 4 min
4

Diesel Load Outruns the Auxiliary Ventilation

A single-heading decline at 350 m is ventilated by a 1.2 m diameter forcing column delivering 22 m3/s at the face; the fan is rated 30 m3/s at the collar. Working at the face: one 200 kW development jumbo and two 250 kW diesel loaders, all running during mucking.

769 words, about 4 min
5

Grind Finer, Feed Less: A Concentrator Trade-Off

A 2.4% Cu porphyry concentrator treats 900 t/h at P80 = 150 micrometres with 88% rougher-scavenger copper recovery. Locked-cycle pilot work shows that grinding to P80 = 106 micrometres lifts recovery to 91.0%, but Bond work index testing and the installed power indicate throughput would fall to about 780 t/h at the same draw.

767 words, about 4 min
6

Pedestrian-Vehicle Interaction, an Improvement Notice and a Tonnage Bonus

At a 480,000 t/y underground gold mine (2.6 g/t, 92% recovery), three lost-time injuries in 14 months have all involved pedestrians and load-haul-dump units on the 240 m level. Management proposes a 1.8 M proximity-detection and tagging system.