Quick reference

Mining methods and mine planning

  • Cutoff grade c = (mining + processing + refining + G&A costs) / (metal price × recovery × payable factor).

  • NSR = Σ(grade_i × recovery_i × price_i × payable_i) − treatment and refining charges.

  • Break-even stripping ratio = (ore value per tonne − ore mining and processing cost per tonne) / waste mining cost per tonne.

  • Room-and-pillar recovery = mined area / total area; pillar strength is estimated empirically and recovery commonly falls in the 50–70% range.

  • Longwall mining gives high extraction and controlled subsidence; it requires a continuous moving face with hydraulic roof supports.

  • Open pit versus underground selection depends on depth, orebody geometry, grade, stripping ratio, and geotechnical conditions.

  • Planning hierarchy: life-of-mine strategic plan, five-year tactical plan, and weekly operational plan; reserves are the mineable subset of resources.

  • Dilution lowers grade and ore loss reduces recovery; both are modeled explicitly in stope and phase design.

Quick reference

Geotechnical engineering and ground control

  • RMR sums scores for UCS, RQD, joint spacing, joint condition, and groundwater; 0–20 is very poor and 81–100 is very good.

  • Q = (RQD/Jn)(Jr/Ja)(Jw/SRF); Q values span roughly 0.001 to 1000 and guide support selection.

  • GSI estimates rock mass strength from blockiness and joint condition; Hoek-Brown parameters include mb = mi exp((GSI−100)/(28−14D)).

  • Pillar stress is often estimated as γH × (total area / pillar area); pillar factor of safety = pillar strength / pillar stress.

  • The subsidence angle of draw defines the surface influence zone above extraction and depends on rock mass, depth, and geometry.

  • Support systems include rock bolts, mesh, shotcrete, and steel sets; selection is tied to RMR, Q, span, and expected stand-up time.

  • Slope factor of safety = resisting forces / driving forces; groundwater pressure reduces effective stress and lowers slope stability.

  • Ground monitoring includes convergence stations, extensometers, piezometers, and microseismic arrays.

Quick reference

Drilling and blasting

  • Powder factor = explosive mass / blasted rock volume or tonnes; it links blast design to fragmentation and cost.

  • Burden is the distance from a hole to the nearest free face; spacing is commonly set at 1.0–1.5 times burden.

  • Stemming length is typically about 0.7–1.0 times burden and reduces flyrock and airblast by confining gases.

  • Charge mass per hole = explosive density × loaded length × hole cross-sectional area × loading efficiency.

  • Millisecond delays between holes and rows change free-face conditions and influence fragmentation, vibration, and muckpile shape.

  • Presplit and smooth blasting use closely spaced, lightly charged perimeter holes to protect the final wall.

  • Airblast and vibration are assessed with scaled distance; vibration often uses SD = D/√Q and airblast uses D/Q^(1/3).

  • A misfire is handled by stopping work, marking the area, clearing fumes, and removing the charge under controlled procedures.

Quick reference

Mine ventilation and environmental control

  • Atkinson equation: ΔP = R Q²; resistance R depends on friction factor k, airway length L, perimeter P, and area A as R = kLP/A³.

  • Series airways add resistance: R_eq = ΣR_i; parallel airways satisfy 1/√R_eq = Σ(1/√R_i).

  • Fan laws: airflow varies with fan speed, pressure with speed squared, and shaft power with speed cubed.

  • Air quantity Q = A × V; required airflow is set by personnel, diesel equipment, dust, gas, and heat loads.

  • Methane is explosive at roughly 5–15% by volume in air; dilution, monitoring, and drainage are key controls.

  • Respirable dust control uses water sprays, ventilation, filtration, and enclosure; silica-bearing dust causes silicosis.

  • Heat and humidity are managed with airflow, refrigeration, insulation, and limiting time in hot work areas.

  • Environmental controls include acid mine drainage prevention and treatment, tailings management, and water balancing.

Quick reference

Materials handling and mineral processing

  • Bond equation: W = 10 Wi (1/√P80 − 1/√F80) kWh/t, with P80 and F80 expressed in micrometres.

  • Bond work index Wi is ore-specific; a higher Wi means more grinding energy is required.

  • Comminution increases liberation; the grade-recovery curve shows the trade-off between concentrate grade and recovery.

  • Froth flotation uses collectors to make target minerals hydrophobic and frothers to stabilize bubbles.

  • Gravity and dense-medium separation rely on density differences; they are common for coal and coarse heavy minerals.

  • Thickening and filtration dewater slurries, recover process water, and prepare tailings for transport or storage.

  • Conveyor mass capacity = belt cross-sectional area × belt speed × bulk density.

  • Truck cycle time = load + haul + dump + return + queue; it sets truck productivity and shovel-truck matching.

Quick reference

Mine economics, health, and safety

  • NPV = Σ CF_t/(1+r)^t − initial capital; a positive NPV creates value at the selected discount rate.

  • IRR is the discount rate at which NPV equals zero; it is compared with the hurdle rate.

  • Payback period is the time to recover initial capital from cumulative cash flow; discounted payback uses present values.

  • AISC includes cash costs, sustaining capital, royalties, and G&A; it is used to compare operating performance across mines.

  • LTIFR = lost-time injuries × 1,000,000 / hours worked.

  • Risk is commonly scored as likelihood × consequence in a risk matrix to rank hazards and controls.

  • Hierarchy of controls: eliminate, substitute, engineer, administrate, and PPE; higher-level controls are more reliable.

  • Health and safety controls address ground control, traffic management, explosives, dust, noise, diesel emissions, and emergency response.