Traffic Engineering

  • Fundamental flow identity: q = k × u, where flow is in veh/h, density in veh/mi, and speed in mi/h; any two variables determine the third in uninterrupted flow.

  • Freeway basic segment LOS is set by density (pc/mi/ln): A ≤ 10; B >10–20; C >20–28; D >28–35; E >35–45; F >45.

  • Signalized intersection LOS is set by average control delay (s/veh): A ≤ 10; B >10–20; C >20–35; D >35–55; E >55–80; F > 80.

  • Two-way stop-controlled minor-street capacity: c = v·e^(−v·t)/(1 − e^(−v·t_f)), with v the conflicting flow rate, t the critical gap, and t_f the follow-up time.

  • HCM base saturation flow is 1900 pc/h/ln for through lanes; adjustments cover lane width, heavy vehicles, grade, parking, bus blockage, area type, and turning movements.

  • Webster optimal cycle length: C_o = (1.5L + 5)/(1 − Y), where L is total lost time per cycle in seconds and Y is the sum of critical flow ratios.

  • Peak hour factor: PHF = peak-hour volume / (4 × peak 15-min volume); values range from 0.25 to 1.00, and the 15-min flow rate equals the hourly volume divided by PHF.

  • Greenshields linear model: u = u_f(1 − k/k_j); capacity occurs at k = k_j/2 and u = u_f/2.

  • Yellow change interval: y = t + v/(2a + 2gG), with t ≈ 1.0 s perception-reaction, v in ft/s, a ≈ 10 ft/s², and G the approach grade.

Quick reference

Geometric Design

  • Stopping sight distance: SSD = 1.47Vt + V²/[30(f ± G)], with V in mph, brake reaction time t = 2.5 s, and the grade term added on upgrades and subtracted on downgrades.

  • Minimum horizontal curve radius: R = V²/[15(e + f_s)], with V in mph and superelevation e and side friction f_s as decimals.

  • Typical maximum superelevation is 4% to 8% (commonly 6% in urban areas, 8% in rural); the allowable side friction factor drops as design speed rises.

  • Crest vertical curve with S < L: L = A·S²/2158, where A is the algebraic grade change in percent and S is stopping sight distance in feet (eye 3.5 ft, object 2.0 ft).

  • Sag vertical curve with S < L: L = A·S²/(400 + 3.5S), based on headlight sight distance with the headlamp 2 ft above pavement at a 1-degree upward angle.

  • Vertical curve K = L/A is the horizontal distance for a 1% grade change; larger K produces flatter curves, and minimum K is tabulated by design speed for SSD.

  • Normal pavement crown is 2%; maximum grades for level terrain are roughly 3% to 4% at high design speeds and increase for rolling and mountainous terrain.

  • Intersection sight triangles use legs measured along each approach, with the length along the major road set by the stopping sight distance of the major-road approach.

  • Passing sight distance on two-lane highways is tabulated by design speed (for example about 2,135 ft at 60 mph and 2,480 ft at 70 mph).

Quick reference

Transportation Planning

  • The four-step model runs sequentially: trip generation, trip distribution, mode choice, and route assignment, producing link volumes and ridership estimates.

  • Gravity distribution: T_ij = P_i·A_j·F_ij / Σ_k(A_k·F_ik), where F is an impedance (friction) factor typically decaying with travel time or cost.

  • Federal law requires a metropolitan planning organization for every urbanized area with population of 50,000 or more.

  • ITE Trip Generation data provide an independent variable (e.g., 1,000 sq ft GFA), an average rate, a regression equation, the R², and the number of data points; rates are preferred unless the equation fits better.

  • Functional classification - arterial, collector, local - balances mobility against access and drives design standards, federal funding eligibility, and reporting.

  • Transportation conformity requires long-range plans and TIPs to not worsen air-quality violations relative to the state implementation plan for NAAQS.

  • Demand elasticity = percent change in demand divided by percent change in price, fare, or travel cost; short-run fuel elasticities are small, long-run values are larger.

  • Volume-to-capacity ratios and planning LOS thresholds are used for sketch-level screening before detailed HCM analysis.

  • Travel demand management measures - parking pricing, transit subsidies, rideshare programs, telework - target peak-period single-occupant vehicle trips.

Quick reference

Traffic Safety Analysis

  • Crash rate per million entering vehicles: R = (N × 1,000,000)/(ADT × 365 × T), where N is the number of crashes in T years.

  • Roadway segment rate per 100 million vehicle-miles: R = (N × 100,000,000)/(ADT × 365 × L × years), with L the segment length in miles.

  • Critical crash rate: Rc = Ra + K·√(Ra/M) + 1/(2M), where Ra is the average rate of similar sites, M is exposure in million entering vehicles, and K sets the confidence level.

  • HSM predictive method: N_predicted = N_SPF × CMF1 × CMF2 × … × C, multiplying the safety performance function output by crash modification factors and a calibration factor.

  • A crash modification factor below 1.0 indicates a crash reduction; above 1.0 indicates an increase, and combined CMFs are multiplied together.

  • Empirical Bayes: N_EB = w·N_predicted + (1 − w)·N_observed, with w = 1/(1 + k·N_predicted); this corrects for regression to the mean in observed counts.

  • KABCO severity scale: K fatal, A suspected serious (disabling) injury, B minor (evident) injury, C possible injury, O property-damage-only.

  • EPDO analysis converts injury crashes into property-damage-only equivalents using severity weighting factors so sites with different severity mixes can be ranked.

  • Before-after evaluations use comparison groups or the empirical Bayes method to separate treatment effects from crash count trends and regression to the mean.

Quick reference

Pavement Design and Materials

  • Structural number: SN = a1·D1 + a2·m2·D2 + a3·m3·D3, with typical layer coefficients near 0.44 for asphalt concrete and 0.14 for granular base.

  • AASHTO 1993 flexible design: log10W18 = ZR·S0 + 9.36·log10(SN+1) − 0.20 + log10[ΔPSI/(4.2 − 1.5)]/[0.40 + 1094/(SN+1)^5.19].

  • AASHTO 1993 rigid design uses slab thickness D and a serviceability loss of (4.5 − 1.5) rather than (4.2 − 1.5) in the performance equation.

  • An 18,000-lb single axle with dual tires equals one ESAL; the truck factor is the ESALs per truck and is multiplied by design-lane truck volume and growth.

  • Resilient modulus for fine-grained subgrade soils with CBR ≤ 10: Mr (psi) ≈ 1500 × CBR.

  • Performance-graded binder such as PG 64-22 must satisfy a high pavement temperature of 64 °C for rutting and a low temperature of −22 °C for thermal cracking.

  • Superpave volumetric design targets 4% air voids at the design traffic level and checks VMA, VFA, and dust-to-binder ratio (typically 0.6 to 1.2).

  • Rigid pavement design uses the modulus of subgrade reaction k (psi/in) and concrete modulus of rupture; dowel bars transfer load across transverse joints.

  • Reliability enters AASHTO design through ZR: 50% ≈ 0, 90% ≈ −1.282, 95% ≈ −1.645, 99% ≈ −2.327, with S0 about 0.45 flexible and 0.35 rigid.

Quick reference

Construction and Maintenance of Transportation Facilities

  • Dense-graded asphalt mixtures are typically accepted at 92% or more of maximum theoretical specific gravity (Gmm), determined from cores or gauges and reported as lot averages.

  • MUTCD merging taper length: L = W·S²/60, where W is the lateral offset in feet and S is the speed limit in mph.

  • Tack coat is applied to the existing surface at roughly 0.05 to 0.15 gal/yd² of emulsion, with the rate reduced for open, coarse surfaces versus tight surfaces.

  • Quality assurance acceptance commonly uses percent within limits (PWL), which credits both the lot mean and lot variability relative to specification limits.

  • Pavement condition index ranges from 0 to 100, with 100 for new pavement and 0 for failed pavement; it drives treatment selection in pavement management systems.

  • Concrete joint sawing must begin within the window before random cracking develops, often about 4 to 12 hours after placement depending on weather and mix.

  • Preventive maintenance treatments include crack sealing, fog seal, chip seal, slurry seal, microsurfacing, and thin overlays; each addresses a specific distress.

  • Recycled asphalt pavement is routinely allowed at 15% to 25% in hot-mix surface courses, with higher percentages in base layers and cold recycling.

  • Work zone activity areas require a buffer space plus longitudinal buffer based on speed, and drop-offs at milled edges must be controlled before opening to traffic.