PE Transportation study materials
PE Transportation study resources

PE Transportation study plan

PE Transportation · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Traffic Engineering

  • Compute saturation flow, capacity, v/c ratio, and control delay for a signalized intersection from given volumes, lane geometry, and phasing

  • Evaluate unsignalized intersection capacity and rank approaches by delay to identify the critical movement

  • Calculate yellow and all-red clearance intervals from approach speed, grade, and perception-reaction time, then build a two-phase timing plan that satisfies the minimum cycle length

  • Convert raw counts to peak-hour factor, design hourly volume, and directional distribution, and explain how each enters design decisions

  • Apply the eight MUTCD signal warrant categories conceptually to decide whether a signal is justified at a described location

Your checkpoint

A one-page signal timing worksheet with 10 self-written problems (capacities, intervals, cycle length) fully solved, with units shown and arithmetic checked

Week 2

Geometric Design

  • Compute stopping sight distance, decision sight distance, and passing sight distance for given design speeds and grades

  • Determine minimum horizontal curve radius and required superelevation by balancing side friction and superelevation rate against design speed

  • Calculate crest and sag vertical curve lengths using K-values and rate-of-change criteria, then verify the curve fits the available sight distance

  • Lay out a superelevation transition (tangent runout, spiral or curve runoff) and check that the calculated length fits the curve length

  • Check a described cross section against standard lane width, shoulder width, clear zone, and side-slope criteria

Your checkpoint

A 12-problem design calculation set plus a single-page formula sheet listing every geometric-design equation with variable definitions

Week 3

Transportation Planning

  • Perform trip generation for a described development using published trip rates and compute entering/exiting peak-hour volumes

  • Distribute trips with a gravity model and allocate them to the network by assignment, showing the resulting link volumes

  • Apply a logit-style mode choice model to split person trips among drive-alone, transit, and non-motorized modes

  • Compute and interpret K-factor, D-factor, and design hourly volume for a planning-level roadway

  • Evaluate pedestrian and bicycle level of service indicators for a described corridor and recommend one improvement

Your checkpoint

A completed travel demand forecast for a synthetic 500-unit residential development, from trip generation through link assignment, presented as a one-page memo with the supporting table

Week 4

Traffic Safety Analysis

  • Compute crash frequency, crash rate per million vehicle-miles, and crash rate per million entering vehicles for described sites

  • Screen a list of sites by both frequency and rate methods and justify which sites survive to the high-crash-location list

  • Apply the predictive-method structure (safety performance function, crash modification factors, calibration factor) to estimate expected crashes at a site

  • Select and rank countermeasures by crash modification factor and estimated benefit-cost, stating the assumption behind each factor

  • Classify collision types from a written crash narrative set and link each pattern to a plausible contributing factor

Your checkpoint

A mock safety study memo ranking five sites by crash rate with expected-crash calculations and a ranked countermeasure table

Milestones

Week 2: Score at least 70% on a 25-question self-written set covering only Domains 1 and 2, closed-book, timed at 1.5 minutes per question

Week 4: Score at least 70% on a 40-question mixed set across Domains 1-4; log every missed item by error type (concept, formula, unit, misread)

Week 6: Complete one design or quantity calculation in Domains 5 and 6 under 20 minutes each without notes, and confirm both calculation packages are finished

Week 8: Complete a full 80-question timed simulation covering all six domains, score at least 75%, and produce a final one-page list of the five weakest topics with the fix for each