- Flow-speed-density equation
- Traffic flow q in veh/h equals density k in veh/mi multiplied by space mean speed u in mi/h; knowing any two of the three variables determines the third in uninterrupted flow.
- Peak hour factor
- PHF equals the peak-hour volume divided by four times the busiest 15-minute volume; it ranges from 0.25 to 1.00 and converts hourly volumes into peak 15-minute flow rates.
- Base saturation flow rate
- The HCM default of 1900 passenger cars per hour per lane for a through movement at a signalized intersection, adjusted downward for narrow lanes, heavy vehicles, grades, parking, and turns.
- Webster optimal cycle length
- C = (1.5L + 5)/(1 − Y), where L is total lost time per cycle in seconds and Y is the sum of critical flow ratios; it minimizes average delay at an isolated signal.
- Signalized intersection level of service
- Determined by average control delay per vehicle: LOS A is 10 seconds or less, B is 10 to 20, C is 20 to 35, D is 35 to 55, E is 55 to 80, and F exceeds 80 seconds.
- Greenshields speed-density model
- A linear relationship u = u_f(1 − k/k_j), where u_f is free-flow speed and k_j is jam density; capacity occurs at half the jam density and half the free-flow speed.
- Stopping sight distance
- SSD = 1.47Vt + V²/[30(f ± G)], where V is design speed in mph, t is brake reaction time of 2.5 seconds, f is friction, and G is grade in decimal form.
- Minimum horizontal curve radius
- R = V²/[15(e + f_s)], with V in mph and superelevation e and side friction f_s as decimals; design tables set e_max and speed-dependent friction values.
- Crest vertical curve length
- When stopping sight distance is shorter than the curve, L = A·S²/2158, where A is the algebraic grade change in percent and S is stopping sight distance in feet.
- Vertical curve K value
- K equals the curve length L divided by the algebraic grade change A; it is the horizontal distance required for a 1 percent grade change and grows with design speed.
- Sag vertical curve sight distance
- When S is less than L, L = A·S²/(400 + 3.5S), derived from headlight sight distance with the lamp 2 feet above pavement aimed one degree upward.
- Four-step travel demand model
- A sequential forecast of trip generation, trip distribution, mode choice, and traffic assignment that estimates regional travel demand and produces link volumes used for planning.
- Gravity model distribution
- Trip interchanges are proportional to productions and attractions and inversely related to impedance: T_ij = P_i·A_j·F_ij / Σ(A_k·F_ik), where F is a friction factor.
- MPO designation threshold
- Federal law requires a metropolitan planning organization for each urbanized area of 50,000 or more population to conduct continuing, cooperative, and comprehensive transportation planning.
- Trip generation rate
- The average number of vehicle-trip ends per unit of independent variable, such as per 1,000 square feet of floor area, from ITE surveys of a specific land use.
- Functional classification
- Grouping roadways as arterials, collectors, or locals according to the balance of mobility and access provided; classification affects design standards, funding eligibility, and federal reporting.
- Crash rate per million vehicles
- R = (N × 1,000,000)/(ADT × 365 × T), where N is the number of crashes observed over T years; it normalizes crash counts by traffic exposure for site comparison.
- Critical crash rate
- Rc = Ra + K·√(Ra/M) + 1/(2M), where Ra is the average rate for similar sites, M is exposure in million entering vehicles, and K reflects the confidence level.
- Crash modification factor
- A multiplicative estimate of how a treatment changes crash frequency relative to existing conditions; values below 1.0 indicate a reduction and above 1.0 indicate an increase.
- Empirical Bayes crash estimate
- N_EB = w·N_predicted + (1 − w)·N_observed, with weight w = 1/(1 + k·N_predicted); it blends the safety performance function with observed counts to reduce regression-to-the-mean bias.
- KABCO injury scale
- A five-level crash severity classification: K fatal, A suspected serious disabling injury, B minor evident injury, C possible injury, and O property-damage-only.
- Structural number
- SN = a1·D1 + a2·m2·D2 + a3·m3·D3, summing each layer thickness times its layer coefficient and drainage modifier; the required SN comes from the AASHTO 1993 equation.
- Equivalent single axle load
- A pavement damage unit defined by an 18,000-lb single axle with dual tires; truck factors convert truck volumes into cumulative ESALs over the design period.
- Resilient modulus from CBR
- For fine-grained soils with a CBR of 10 or less, the resilient modulus in psi is approximately 1500 times the CBR, used to characterize subgrade support in flexible design.
- PG binder grade
- A performance grade such as PG 64-22 specifies the high and low pavement service temperatures in Celsius that the asphalt binder must satisfy for rutting and thermal cracking resistance.
- AASHTO 1993 flexible design equation
- log10W18 = ZR·S0 + 9.36log10(SN+1) − 0.20 + log10[ΔPSI/(4.2−1.5)]/[0.40 + 1094/(SN+1)^5.19], relating traffic, reliability, and serviceability loss to structural number.
- Voids in mineral aggregate
- VMA is the volume of air voids plus effective asphalt binder in a compacted mix as a percent of bulk volume; minimum values ensure durable, workable asphalt mixtures.
- Percent within limits
- A quality assurance acceptance statistic giving the fraction of tested material that falls inside specification limits, accounting for both the average and the variability of the lot.
- Merging taper length
- MUTCD formula L = W·S²/60, where W is the lateral offset in feet and S is the speed limit in mph, used to shift traffic around a work zone closure.
- Tack coat application rate
- Asphalt emulsion sprayed on an existing surface to bond pavement layers, typically applied at 0.05 to 0.15 gallons per square yard depending on surface texture and condition.
- Pavement condition index
- A distress-based rating from 0 to 100, where 100 is new pavement and 0 is failed; it is used to schedule maintenance and rehabilitation in a pavement management system.
- Asphalt field compaction acceptance
- Dense-graded asphalt mixtures are usually accepted at 92 percent or more of maximum theoretical specific gravity Gmm, measured on cores or with nuclear or electromagnetic gauges.