Lead SCADA Security Manager study materials
Lead SCADA Security Manager study resources

Lead SCADA Security Manager cheat sheet

Lead SCADA Security Manager · Keep the key ideas within reach.

Quick reference

SCADA Security

  • Purdue model levels: 0 physical process, 1 controllers (PLC/RTU), 2 supervisory (SCADA/HMI), 3 site operations, 3.5 DMZ, 4 enterprise, 5 external; conduits between levels must be controlled and monitored.

  • SCADA availability-first ordering: safety, availability, integrity, confidentiality; IT ordering (CIA) is inverted, so control selection must not trade process availability for confidentiality gains.

  • IEC 62443 zones and conduits: group assets sharing security requirements into zones, then define conduits with allowed protocols, direction, and inspection point; reference model in IEC 62443-3-2.

  • Security Levels SL1-SL4 (IEC 62443-3-3) apply to systems, target SL (SL-T) derives from risk assessment, achieved SL (SL-A) from verification; capability SL (SL-C) is vendor-claimed.

  • Modbus TCP and DNP3 have no native authentication or encryption; compensating controls are network segmentation, deep-packet inspection at the conduit, and protocol-aware anomaly detection.

  • IEC 61850 GOOSE and SV messages are Layer 2 multicast with tight latency budgets; encryption or added latency is generally infeasible, so isolation and MAC/frame filtering are the controls.

  • Passive network monitoring (SPAN/TAP, unidirectional gateways) is preferred in Level 0-2 because active scanning can crash fragile controllers and disturb real-time loops.

  • Known ICS attack classes: Stuxnet (air-gap crossing via removable media), TRITON (safety instrumented system targeting), Industroyer (grid protocol abuse), PIPEDREAM/INCONTROLLER (toolkit for PLC manipulation).

  • Default and shared credentials on HMI, engineering workstations, and network gear are a leading initial-access vector; asset inventory with firmware versions is prerequisite to patching decisions.

Quick reference

Cybersecurity Management

  • NIST CSF 2.0 functions: Govern, Identify, Protect, Detect, Respond, Recover; Govern was added in 2.0 and covers risk strategy, roles, policy, and supply chain.

  • Program maturity models: C2M2 (10 domains, MIL0-MIL3) for energy and critical infrastructure; IEC 62443-2-1 for asset-owner security management systems.

  • Risk = likelihood x impact; ICS scoring must weight physical consequence (safety, environmental release, production loss) alongside data loss.

  • Incident response for OT requires a manual fallback plan: defined safe-state procedures, operator runbooks, and tested ability to run the plant without SCADA for a stated duration.

  • Change management for OT: every controller or HMI change passes through a maintenance window, rollback plan, and post-change verification; unmanaged changes are a top audit finding.

  • Tabletop exercises should include operations, engineering, IT security, and physical security; a tabletop that never reaches the 'safe state' decision is incomplete.

  • Metrics that matter: mean time to detect OT anomalies, percentage of OT assets in monitored zones, patch latency for critical PLC firmware, and number of shared accounts remaining.

  • Third-party risk: vendors with remote access need time-bound, logged, MFA-protected jump-host sessions; standing VPN access to Level 2 is a control failure.

Quick reference

Information Security

  • Defense in depth layers for SCADA: perimeter firewall, DMZ with replicated data (historian mirror), zone firewalls, host hardening, application allowlisting, and physical access control.

  • Unidirectional gateways (data diodes) allow telemetry out of the control zone with no return path; they replace bidirectional firewall rules where the business only needs to read data.

  • Network segmentation rule: no direct routing between Level 3.5 DMZ and Level 2; all traffic terminates at a proxy or broker in the DMZ.

  • Identity controls: unique accounts per engineer, MFA at remote access and jump hosts, privileged access management vaulting for controller and switch credentials.

  • Cryptography: TLS 1.2+ for northbound flows, no reliance on outdated ciphers; where legacy devices lack TLS, terminate at a protocol-aware proxy rather than weakening the tunnel.

  • Logging: forward Windows event logs, firewall logs, and IDS alerts to a SIEM; retain per policy and include OT-specific sources such as PLC change events and engineering workstation USB activity.

  • Vulnerability management in OT: prioritize by exploitability and process exposure, not CVSS alone; a CVSS 9.8 on an unreachable engineering tool ranks below a CVSS 6.0 on an internet-facing HMI.

  • Backup integrity: configuration backups of PLCs, HMIs, and switches must be stored offline, versioned, and restore-tested; ransomware recovery depends on this more than on detection.

Quick reference

Governance, Risk, and Compliance

  • Regulatory landscape for critical infrastructure: NERC CIP applies to bulk electric systems in North America; IEC 62443 and ISO/IEC 27001 are voluntary frameworks unless contractually required.

  • NERC CIP core requirements: asset categorization (CIP-002), security management controls (CIP-003), personnel and training (CIP-004), electronic security perimeters (CIP-005), and incident reporting (CIP-008).

  • ISO/IEC 27001 requires a risk assessment and treatment plan, Statement of Applicability, and management review; certification is a point-in-time audit, not continuous assurance.

  • Policy hierarchy: board-approved policy, standards that specify mandatory controls, procedures with step-level instructions, and records that evidence execution.

  • Risk register entries need owner, asset, threat, vulnerability, likelihood, impact, treatment (mitigate/transfer/accept/avoid), residual rating, and review date.

  • Exceptions are time-bound and formally approved at a level above the risk owner; an accepted risk without a compensating control and expiry date is an audit exception.

  • Audit evidence: access reviews, change tickets, training records, backup restore tests, and incident post-mortems; evidence must be dated and traceable to the control.

  • Supply chain governance: require vendor security documentation, secure development attestations (IEC 62443-4-1), and vulnerability disclosure terms in procurement contracts.

Quick reference

Continuity, Resilience, and Recovery

  • Recovery objectives: RTO is maximum tolerable downtime, RPO is maximum tolerable data loss; SCADA RPO is often zero for process state because state is re-read from the field.

  • BIA sequence: identify critical processes, map dependencies (SCADA, network, power, staff), set RTO/RPO, then derive recovery strategies and test plans.

  • Resilience design: redundant controllers, redundant networks (ring topologies), redundant historians, and geographically separate control centers with tested failover.

  • Manual operation capability is a continuity control: operators must be trained and drilled to run the process in manual or local mode when SCADA is unavailable.

  • Recovery from ransomware in OT: isolate the zone, restore from offline backups, verify firmware integrity, rotate all credentials, and validate controller logic before reconnecting.

  • Continuity testing cadence: tabletop annually, functional failover at least annually, full recovery exercise per policy; every exercise produces corrective actions with owners and dates.

  • Crisis communication: pre-agreed notification paths to regulators (NERC CIP-008 timelines), customers, and internal leadership; regulatory reporting clocks start at recognition, not resolution.

  • Alternate site readiness: verify that backup control centers have current network configurations, licenses, and operator credentials; an untested failover site is an assumption, not a control.