Lead SCADA Security Manager study materials
Lead SCADA Security Manager study resources

Lead SCADA Security Manager study plan

Lead SCADA Security Manager · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

SCADA Security

  • Map the full SCADA/ICS reference architecture for one utility you know (field devices, RTUs/PLCs, HMIs, historians, DMZ, enterprise) and label every trust boundary and conduit

  • Enumerate Purdue Model levels 0-5 and write one sentence per level describing what a compromise at that level would let an attacker do

  • List the top six ICS-specific protocols in your environment (e.g., Modbus TCP, DNP3, OPC UA, IEC 61850, PROFINET) and note which have no native authentication or encryption

  • Draft a one-page threat-actor profile distinguishing nation-state, insider, and ransomware crews by intent, dwell time, and likely initial access vector against OT

Your checkpoint

A labeled one-page OT architecture and trust-boundary diagram plus a protocol weakness table covering at least six protocols

Week 2

SCADA Security

  • Walk through the ICS Cyber Kill Chain and the MITRE ATT&CK for ICS tactics, and place two realistic techniques under each stage

  • Analyze at least two public ICS incident case studies and extract the initial access path, the pivot into OT, and the safety consequence

  • Explain how an OT network monitoring sensor passively baselines traffic and which anomalies (new device, new protocol, unauthorized command) it should alert on

  • Compare three OT segmentation approaches (air gap, data diode, industrial firewall DMZ) on cost, operational friction, and residual risk

Your checkpoint

A two-page ICS kill-chain analysis of two incidents with the defensive control that would have broken each chain

Week 3

Cybersecurity Management

  • Build a role-and-responsibility RACI for a converged SOC that spans IT and OT monitoring and escalation

  • Design a vulnerability management workflow that triages OT CVEs by exploitability, asset criticality, compensating controls, and safe patch window rather than CVSS alone

  • Write the detection and escalation runbook steps for a suspected unauthorized HMI login, naming who gets paged and in what order

  • Draft a security awareness module for control-room operators covering USB hygiene, phishing, and reporting anomalies

Your checkpoint

A one-page OT vulnerability triage decision matrix with scoring criteria and approval gate owners

Week 4

Cybersecurity Management & Information Security

  • Draft an OT asset inventory schema (owner, criticality, firmware, network segment, safety impact) and populate it for ten representative assets

  • Compare identity and access controls for OT: MFA at the enterprise edge, jump hosts, privileged access management, and vendor remote access

  • Explain defense-in-depth layering for an ICS and identify where each layer fails if the DMZ is bypassed

  • Review a sample incident response plan and mark which steps assume IT-only assumptions that break in OT

Your checkpoint

An OT asset inventory template populated with ten assets and a criticality rating for each

Week 5

Information Security

  • Explain cryptographic controls relevant to OT (TLS for OPC UA, signed firmware, code signing) and where legacy devices force compensating controls

  • Describe secure remote-access architecture for vendors: bastion host, session recording, time-bound accounts, and approval workflow

  • Map the security controls required by a recognized standard framework to the layers of your architecture

  • Draft a data-classification note for process data, engineering drawings, and safety setpoints, and specify handling rules for each

Your checkpoint

A secure remote-access design one-pager with approval workflow, session recording, and revocation steps

Week 6

Governance, Risk, and Compliance

  • Build a risk register with at least eight OT risks, each scored on likelihood, safety impact, regulatory exposure, and residual risk after controls

  • Map the obligations from relevant regulations and standards (e.g., NERC CIP, IEC 62443, NIS2) to specific controls in your program

  • Draft a governance structure clarifying who owns OT security decisions versus plant operations and who accepts residual risk

  • Write a third-party/vendor risk questionnaire with at least ten questions specific to ICS suppliers and integrators

Your checkpoint

A scored OT risk register with eight risks, owners, treatment plans, and residual ratings

Week 7

Continuity, Resilience, and Recovery

  • Define RTO and RPO for each critical OT system and identify which systems cannot be restored from backup alone

  • Design and document a tested backup and recovery procedure for PLC logic, HMI configurations, and historian data, including offline media handling

  • Distinguish between business continuity, disaster recovery, and incident response in an OT context and assign the trigger for each

  • Write a tabletop exercise scenario for a ransomware infection that reaches the historian and plan the facilitation questions

Your checkpoint

A recovery runbook for PLC and HMI restoration with RTO/RPO targets and a step-by-step verification checklist

Week 8

SCADA Security & Governance, Risk, and Compliance & Continuity, Resilience, and Recovery

  • Synthesize all domains into a single program maturity self-assessment scored across the five exam domains

  • Complete timed practice sets weighted to the domain percentages and log every missed question by domain

  • Re-teach the three weakest domain areas in writing without notes, then verify against source material

  • Rehearse explaining a board-level OT security posture summary in under five minutes

Your checkpoint

A completed maturity self-assessment with a prioritized 90-day remediation plan for the three weakest areas

Milestones

Week 2: Can diagram the Purdue model from memory and explain the ICS kill chain with a real example for each stage

Week 4: Asset inventory and vulnerability triage matrix are complete enough that a colleague could apply them without asking you questions

Week 6: Risk register is scored and reviewed, and you can map at least three regulatory obligations to concrete controls

Week 8: Timed practice scores show no domain below 70% and the 90-day remediation plan is written