PECB Six Sigma Green Belt study materials
PECB Six Sigma Green Belt study resources

PECB Six Sigma Green Belt cheat sheet

PECB Six Sigma Green Belt · Keep the key ideas within reach.

Quick reference

Six Sigma Fundamentals and Lean Concepts

  • Six Sigma performance target: 3.4 defects per million opportunities (DPMO), i.e., a process centered within ±1.5 sigma of specification limits over the long term.

  • DPMO = (defects / (units × opportunities per unit)) × 1,000,000; use it to compare processes with different complexity.

  • DMAIC is applied to existing processes; DMADV (Define, Measure, Analyze, Design, Verify) is applied to new designs or redesigns.

  • Y = f(X1, X2, … Xn): Y is the output/CTQ, X's are the process inputs; improvement acts on X's, control monitors X's.

  • Lean identifies the eight wastes: defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion, extra processing.

  • Value-added test: the step changes the form/fit/function of the product, the customer cares about it, and it is done right the first time.

  • Rolled throughput yield (RTY) = product of each step's first-pass yield; hidden factory losses appear when RTY is far below final yield.

  • Cost of poor quality (COPQ) includes internal failure, external failure, appraisal, and prevention costs; prevention is cheapest in the long run.

  • Belt roles: Champion sponsors and removes barriers, Master Black Belt provides technical coaching, Green Belt leads projects part-time, Yellow Belt supports.

Quick reference

Project Identification, Selection, and Definition

  • A defensible Six Sigma project links to strategic/business goals, has a measurable Y with a baseline, has a clear owner, and is completed in roughly 3–6 months.

  • Prioritization matrices score candidate projects against weighted criteria (financial impact, customer impact, feasibility, cycle time); higher weighted score wins.

  • Project charter essentials: problem statement, goal statement, scope/boundaries, business case, team, milestones, and constraints.

  • Problem statement rules: describe the gap with data, state time, location, and magnitude, and avoid naming a cause or a solution.

  • SMART goal: specific, measurable, achievable, relevant, time-bound; include the metric, baseline, target, and date.

  • SIPOC maps Suppliers, Inputs, Process, Outputs, Customers at a high level and defines project boundaries (start and stop points).

  • Scope creep control: state explicitly what is in and out of scope, and require a charter revision for changes.

  • Voice of the Customer (VOC) is translated into CTQ characteristics via Kano analysis or CTQ trees; CTQs must be measurable and actionable.

  • Stakeholder analysis maps influence vs. interest; high-influence/high-interest stakeholders get active engagement and early updates.

Quick reference

Measure Phase: Data Collection and Process Characterization

  • Measurement system analysis: repeatability = equipment variation (same appraiser), reproducibility = appraiser variation (between operators).

  • Gage R&R acceptance: %GRR < 10% acceptable, 10–30% conditionally acceptable depending on application and cost, >30% unacceptable.

  • Attribute agreement: use kappa or percent agreement; kappa > 0.75 indicates good agreement beyond chance.

  • Data types: continuous (variable) data supports more powerful tests; discrete (attribute) data needs larger samples.

  • Sampling: random sampling reduces bias; rational subgrouping captures only common-cause variation within a subgroup.

  • Baseline capability: Cp = (USL − LSL) / 6σ (spread); Cpk = min[(USL − μ)/3σ, (μ − LSL)/3σ] (centering plus spread).

  • Process capability requires a stable process in statistical control; capability indices are meaningless for an unstable process.

  • MSA should be done before capability studies; measurement variation must be small relative to the process and tolerance variation.

  • Data collection plan specifies what to measure, operational definitions, who collects, when, how many, and how it is recorded.

Quick reference

Analyze Phase: Root Cause and Statistical Analysis

  • Root cause tools: 5 Whys, fishbone (Ishikawa) diagram with 6M categories, Pareto chart, and process mapping.

  • Pareto principle: roughly 80% of problems come from 20% of causes; prioritize the vital few categories.

  • Hypothesis test logic: H0 assumes no difference/effect; p-value < α rejects H0; α is the risk of a Type I error (false alarm).

  • Type II error (β) is failing to detect a real effect; power = 1 − β, commonly targeted at 0.80 or higher.

  • t-test compares means (1-sample vs. target, 2-sample for two groups, paired for before/after on the same units); ANOVA compares 3+ group means.

  • Chi-square tests association between two categorical variables; use it for attribute data contingency tables.

  • Correlation coefficient r ranges −1 to +1 and measures linear association only; correlation does not establish causation.

  • Regression models the relationship Y = b0 + b1X + error; check R², residual plots, and p-values of coefficients.

  • Control charts separate common from special cause variation; a point beyond control limits or a non-random run signals special cause.

Quick reference

Improve and Control Phases: Solution Implementation and Sustainment

  • Solution selection uses weighted criteria (impact, cost, risk, time to implement) and a pilot before full deployment.

  • Design of Experiments (DOE): screening designs (fractional factorial) identify significant factors; full factorial estimates main effects and interactions.

  • FMEA: RPN = Severity × Occurrence × Detection; higher RPN gets priority action, and severity alone can force action regardless of RPN.

  • Mistake-proofing (poka-yoke) prevents errors at the source; it is preferred over inspection and training alone.

  • Kaizen events are short, focused improvement bursts; 5S (sort, set in order, shine, standardize, sustain) organizes the workplace.

  • Control plan documents the monitored CTQ, specification, measurement method, sample size/frequency, control method, and reaction plan.

  • SPC control chart choice: X-bar/R for continuous subgroups (n ≤ 8), X-bar/S for larger subgroups, p/np for defectives, c/u for defects.

  • Standard work and visual management sustain gains; document the new procedure and train operators before handover.

  • Project closure requires verified results against the goal, control plan ownership transfer, documented lessons learned, and financial validation.