PECB Six Sigma Green Belt flashcards
PECB Six Sigma Green Belt · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Six Sigma definition
- A disciplined, data-driven methodology that reduces process variation and defects to 3.4 DPMO, using DMAIC to improve existing processes and DMADV for new designs.
- DPMO formula
- Defects per million opportunities equals defects divided by (units multiplied by opportunities per unit), then multiplied by one million. Used to compare processes of differing complexity.
- DMAIC phases
- Define, Measure, Analyze, Improve, Control. A structured improvement cycle for existing processes, each phase gated by deliverables such as the charter, baseline data, and verified results.
- Eight wastes (Lean)
- Defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion, and extra processing. Each consumes resources without adding customer value and is a target for elimination.
- Rolled throughput yield
- The product of first-pass yields at each process step. It exposes hidden factory losses that final inspection yield masks, because rework and scrap reduce true throughput.
- Value-added criteria
- A step is value-added only if it changes form, fit, or function, the customer is willing to pay for it, and it is done correctly the first time.
- Belt roles and responsibilities
- Champion sponsors projects and removes barriers; Master Black Belt provides technical coaching; Green Belt leads projects part-time; Yellow Belt supports with basic tools and data collection.
- Project selection criteria
- Candidates should link to strategic goals, have a measurable output with a baseline, a clear owner, feasible resources, and be completable in roughly three to six months.
- Project charter elements
- Problem statement, goal statement, scope and boundaries, business case, team members, milestones, and constraints. The charter authorizes the project and aligns stakeholders on expectations.
- Problem statement rules
- State the gap with data, including magnitude, time, and location. Do not name a cause or a solution, which would bias the analysis before data are collected.
- SMART goal statement
- Specific, measurable, achievable, relevant, and time-bound. A Six Sigma goal includes the metric, baseline, target, and completion date, stated without implying a solution.
- SIPOC diagram purpose
- Maps Suppliers, Inputs, Process, Outputs, and Customers at a high level. It clarifies project boundaries and shows where the process starts and stops.
- CTQ tree
- A tool that translates voice of the customer needs into measurable critical-to-quality characteristics, then into specifications that can be measured and controlled.
- Stakeholder influence-interest grid
- Plots stakeholders by influence and interest. High-influence, high-interest parties receive active engagement; low-interest parties receive periodic updates only.
- Repeatability vs reproducibility
- Repeatability is variation when the same appraiser measures the same item repeatedly with one instrument. Reproducibility is variation between different appraisers using the same instrument.
- Gage R&R acceptance
- Percent GRR below 10 percent is acceptable, 10 to 30 percent is conditionally acceptable depending on cost and application, and above 30 percent is unacceptable.
- Attribute agreement kappa
- A chance-corrected agreement statistic for attribute measurement systems. Values above 0.75 indicate good agreement; values near zero indicate agreement no better than chance.
- Cp capability index
- Cp equals (USL minus LSL) divided by six sigma. It measures process spread relative to tolerance width and ignores centering, so it can look good while the process is off target.
- Cpk capability index
- Cpk equals the minimum of (USL minus mean) divided by three sigma and (mean minus LSL) divided by three sigma. It accounts for both spread and centering.
- Rational subgrouping
- Subgroups are formed so that units within a subgroup share conditions and capture only common-cause variation, while subgroups span time to reveal special causes.
- Operational definition
- A precise, agreed description of how a characteristic is measured, including instrument, procedure, and decision criteria, so different people collect comparable data.
- Continuous vs discrete data
- Continuous data are measured on a scale and support powerful tests with small samples. Discrete or attribute data are counted and typically require larger samples to detect differences.
- MSA before capability
- Measurement system analysis is performed before capability studies, because measurement variation inflates observed variation and can make an adequate process appear incapable.
- Five Whys technique
- Repeatedly asking why a problem occurs to move from symptoms to root cause. Each answer is verified with data rather than assumed, typically stopping when the cause is actionable.
- Fishbone diagram
- An Ishikawa cause-and-effect diagram organizing potential causes into categories such as man, machine, material, method, measurement, and environment. It structures brainstorming before data verification.
- Pareto principle
- Roughly 80 percent of problems arise from 20 percent of causes. A Pareto chart ranks categories by frequency or cost to identify the vital few worth attacking first.
- Type I and Type II error
- Type I error rejects a true null hypothesis (false alarm, risk alpha). Type II error fails to reject a false null hypothesis (missed effect, risk beta).
- Statistical power
- Power equals one minus beta, the probability of detecting a real effect. It increases with larger sample size, larger effect size, and lower variability, commonly targeted at 0.80.
- ANOVA purpose
- Analysis of variance compares the means of three or more groups by testing whether between-group variation exceeds within-group variation. A significant result indicates at least one mean differs.
- FMEA RPN
- Risk Priority Number equals Severity multiplied by Occurrence multiplied by Detection. Higher values prioritize action, and high severity alone can require action regardless of RPN.
- Poka-yoke
- Mistake-proofing that prevents errors from being made or from passing to the next step, through design features such as fixtures, sensors, or checklists. Preferred over inspection.
- Control plan contents
- Documents the monitored characteristic, specification, measurement method, sample size and frequency, control method, and reaction plan when out-of-control conditions occur.