PECB Six Sigma Green Belt study materials
PECB Six Sigma Green Belt study resources

PECB Six Sigma Green Belt study plan

PECB Six Sigma Green Belt · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Six Sigma fundamentals and Lean concepts & Project identification, selection, and definition

  • Distinguish Six Sigma from Lean and from TQM by writing a one-page comparison of scope, primary metric, and typical project trigger.

  • Define DMAIC phase inputs, outputs, and exit criteria from memory, then verify against a control-chart-style checklist you build yourself.

  • Explain the roles of Champion, Sponsor, Master Black Belt, Black Belt, Green Belt, and process owner in terms of decision rights and time allocation.

  • Select three candidate projects from your own work area and score each against a written screening matrix covering financial impact, process stability, data availability, and scope.

  • Convert each candidate's problem statement into a SMART goal with a baseline, target, and entitlement estimate.

Your checkpoint

A project charter for one selected project containing problem statement, SMART goal, scope boundaries, business case, team roles, and milestone schedule, reviewed against a 10-point self-audit checklist.

Week 2

Project identification, selection, and definition & Measure phase: data collection and process characterization

  • Construct a SIPOC for your chosen process with at least six process steps and explicit start and stop boundaries.

  • Translate the charter into a data collection plan naming each metric, operational definition, data type, sampling method, and owner.

  • Classify each metric as continuous or discrete and justify the measurement scale chosen.

  • Draft a stakeholder analysis and communication plan identifying who must approve the charter and who can block data access.

Your checkpoint

A complete data collection plan plus SIPOC diagram, covering at least five metrics with operational definitions that a colleague could use to collect the same data independently.

Week 3

Measure phase: data collection and process characterization

  • Perform a Gage R&R or attribute agreement analysis on one of your metrics and interpret the percent contribution and number of distinct categories.

  • Build a value stream map or detailed process map for the target process and mark value-added, non-value-added, and necessary non-value-added steps.

  • Calculate baseline capability (Cp, Cpk, Pp, Ppk) or sigma level for your primary metric and state which indices are appropriate for the data type.

  • Identify and document at least three sources of measurement variation or definition ambiguity you found.

Your checkpoint

A baseline capability summary for the primary metric including measurement system verdict, baseline sigma level, and a chart set (run chart, histogram, or control chart) with written interpretation.

Week 4

Measure phase: data collection and process characterization & Analyze phase: root cause and statistical analysis

  • Apply the correct control chart to each baseline metric and justify the choice using data type and subgroup size.

  • Calculate and interpret descriptive statistics including mean, median, standard deviation, and IQR for your baseline data.

  • Formulate at least five potential root causes using a cause-and-effect diagram and a why-why chain for the two most likely branches.

  • Separate occurrence, detection, and escape causes so the analysis does not stop at the operator level.

Your checkpoint

A baseline report combining control chart interpretation, descriptive statistics, and a prioritized cause-and-effect diagram with at least five causes ranked by current evidence strength.

Week 5

Analyze phase: root cause and statistical analysis

  • Run a hypothesis test appropriate to your data (two-sample t, paired t, proportion test, or chi-square) and state null, alternative, alpha, and p-value conclusion in plain language.

  • Check the assumptions behind each test you use and describe the remedy when an assumption fails.

  • Complete a multi-vari or stratification analysis to determine whether variation is within-unit, between-unit, or temporal.

  • Quantify the practical significance of your finding separately from its statistical significance.

Your checkpoint

A root cause verification memo naming the confirmed root cause, the statistical evidence supporting it, the effect size, and the causes you eliminated with reasons.

Week 6

Analyze phase: root cause and statistical analysis & Improve and Control phases: solution implementation and sustainment

  • Generate at least eight improvement alternatives using brainstorming, benchmarking, and mistake-proofing lenses.

  • Evaluate alternatives against impact, effort, cost, and risk in a weighted selection matrix and document the rejection rationale.

  • Design a pilot or DOE-lite experiment with defined response, factors, levels, and success criteria.

  • Write a failure mode and effects analysis for the proposed change covering at least six failure modes with severity, occurrence, and detection ratings.

Your checkpoint

A solution selection package containing the weighted matrix, the chosen countermeasure with its link to the verified root cause, and a pilot plan with success criteria and a rollback trigger.

Week 7

Improve and Control phases: solution implementation and sustainment

  • Implement or simulate the pilot and record before-and-after results on the primary metric.

  • Construct a control plan specifying metric, specification, monitoring frequency, sample size, chart type, reaction plan, and owner.

  • Design a mistake-proofing device or standard work document that prevents recurrence rather than detecting it.

  • Draft a control chart with revised limits and state the rules you will use to detect drift.

Your checkpoint

A control plan plus post-improvement capability calculation showing the new sigma level and the gap to target, with reaction plan triggers written as specific actions.

Week 8

Six Sigma fundamentals and Lean concepts & Project identification, selection, and definition & Improve and Control phases: solution implementation and sustainment

  • Standardize the improvement through updated work instructions, training material, and a named process owner sign-off.

  • Complete a lessons-learned review that identifies which DMAIC phase consumed the most effort and why.

  • Rehearse the full project story in a 20-minute presentation and defend it against ten likely reviewer questions.

  • Take a timed 100-question practice set and map every error back to its domain and phase.

Your checkpoint

A final project report and closure package including control plan, benefit validation, lessons learned, and a scored practice-exam error log with a remediation list.

Milestones

Week 2: Charter approved against the 10-point self-audit and SIPOC complete; if the charter still lacks a measurable baseline, rework it before starting measurement.

Week 4: Baseline capability and measurement system verdict documented; you can state your baseline sigma level without notes.

Week 5: Root cause verified with statistical evidence and effect size; at least three alternative causes formally eliminated.

Week 7: Control plan in place and post-improvement capability recalculated; the primary metric shows a documented shift in the intended direction.

Week 8: Practice exam score at or above 80 percent with every missed item traced to a domain and a written remediation action.