Quick reference

Principles and Foundations of Lean Six Sigma

  • Sigma level expresses process capability as defects per million opportunities (DPMO): 1σ ≈ 691,462 DPMO, 2σ ≈ 308,537, 3σ ≈ 66,807, 4σ ≈ 6,210, 5σ ≈ 233, 6σ ≈ 3.4 DPMO (with the conventional 1.5σ shift).

  • DPMO = (defects / (units × opportunities per unit)) × 1,000,000; it normalizes defect counts so processes of different complexity can be compared.

  • Rolled Throughput Yield (RTY) = product of the first-pass yields of all process steps; a five-step process each at 90% yield gives RTY = 0.9^5 ≈ 59%, not 90%.

  • Lean targets the eight wastes (TIMWOODS): Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, Skills underutilized; Six Sigma targets variation and defects.

  • The five Lean principles are: specify value from the customer's view, map the value stream, create flow, establish pull, and pursue perfection.

  • Cost of poor quality (COPQ) covers internal failure, external failure, appraisal, and prevention costs; the first two are failure costs and are the primary target of improvement.

  • DMAIC applies to improving an existing process; DMADV/DFSS applies to designing a new process or product that does not yet exist.

  • Y = f(x): the output Y (CTQ characteristic) is a function of process inputs x; improvement work identifies and controls the critical few x's.

  • A CTQ (critical to quality) translates a vague customer need into a measurable, verifiable requirement with a defined specification limit.

Quick reference

Lean Six Sigma Methodology (DMAIC and Supporting Tools)

  • DMAIC phases in order: Define, Measure, Analyze, Improve, Control; each phase ends with a tollgate review before the next begins.

  • Define phase deliverables: project charter (problem statement, goal, scope, business case, team, milestones), SIPOC diagram, and voice-of-customer translated into CTQs.

  • A good problem statement states what, where, when, and how much, with no cause and no solution embedded in it; the goal statement is SMART and measurable.

  • Measure phase: operational definitions, measurement system analysis (Gage R&R), data collection plan, baseline capability, and process maps.

  • Gage R&R rule of thumb: under 10% of tolerance study variation is acceptable, 10–30% may be acceptable depending on application, over 30% is not acceptable.

  • Analyze phase tools: Pareto chart, cause-and-effect (fishbone) diagram, 5 Whys, hypothesis tests, scatter plots, and FMEA for prioritizing failure modes by severity × occurrence × detection.

  • Improve phase: generate and select solutions, pilot, run DOE or kaizen events, and verify the improvement with the same measurement system used for the baseline.

  • Control phase: control plan, control charts, standard work, mistake-proofing (poka-yoke), response plan, and handover of the process to the process owner.

  • Control charts: X-bar/R charts for variable data in subgroups; p, np, c, and u charts for attribute data (defective vs defect, constant vs variable sample size).