PECB Six Sigma Yellow Belt study materials
PECB Six Sigma Yellow Belt study resources

PECB Six Sigma Yellow Belt study plan

PECB Six Sigma Yellow Belt · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Principles and foundations of Lean Six Sigma

  • Define Six Sigma, Lean, and Lean Six Sigma in your own words and state how each one differs in primary aim and typical tools

  • Explain the DMAIC roadmap phase by phase and list the key outputs of each phase

  • Distinguish CTQ (critical-to-quality) characteristics from internal process metrics and give two examples of each

  • Calculate process sigma level from DPMO for three worked examples and interpret the result in plain language

Your checkpoint

A one-page glossary of 15 core terms (Six Sigma, Lean, DMAIC, CTQ, DPMO, sigma level, variation, muda, value stream, VOC, and five more you define yourself) plus a table converting three DPMO values to sigma levels with a one-sentence interpretation each

Week 2

Principles and foundations of Lean Six Sigma

  • Describe the three types of variation (common cause, special cause, and structural) and identify which control-chart signals point to special cause

  • Explain the cost-of-poor-quality categories (appraisal, prevention, internal failure, external failure) and classify five sample costs

  • Summarize the roles and responsibilities of Yellow Belt, Green Belt, Black Belt, Master Black Belt, Champion, and Process Owner

  • Explain how Lean thinking reduces waste and name the eight wastes with a concrete example from a workplace you know

Your checkpoint

A written case analysis of 400+ words describing one real or realistic process problem, classifying its variation, estimating its cost-of-poor-quality impact, and naming which belt role would lead the improvement

Week 3

Principles and foundations of Lean Six Sigma & Lean Six Sigma methodology

  • Explain the purpose of the Define phase and the components of a project charter (problem statement, goal statement, scope, business case, team, milestones)

  • Write a problem statement that is measurable, time-bound, and free of an assumed root cause, then rewrite a deliberately bad example to fix it

  • Build a SIPOC diagram for a process you know, capturing at least five process steps and their inputs and outputs

  • Identify stakeholders and explain how a stakeholder analysis shapes project communication

Your checkpoint

A complete project charter and SIPOC diagram for one process of your choice, including a problem statement and goal statement that pass a self-check against SMART criteria

Week 4

Lean Six Sigma methodology

  • Explain the purpose of the Measure phase and how data-collection planning prevents garbage-in data

  • Distinguish continuous from discrete data and select an appropriate measurement scale for five scenarios

  • Describe operational definitions and write one for a metric in your own process

  • Compute basic descriptive statistics (mean, median, range, standard deviation) by hand or in a spreadsheet and explain what each tells you

  • Explain measurement system analysis at a conceptual level and state why repeatability and reproducibility matter

Your checkpoint

A data-collection plan for your project process with at least one operational definition, the chosen data type, sample size rationale, and a spreadsheet showing descriptive statistics for a small sample you collected or simulated

Week 5

Lean Six Sigma methodology

  • Interpret a histogram, run chart, Pareto chart, and control chart and state what decision each supports

  • Explain the purpose of the Analyze phase and how it links back to the charter problem statement

  • Describe root-cause analysis tools (5 Whys, fishbone, cause-and-effect matrix) and apply 5 Whys to a real problem to reach a testable cause

  • Distinguish correlation from causation and give an example where confusing them would mislead a project team

Your checkpoint

A root-cause analysis package: a fishbone diagram with at least four cause categories, a completed 5 Whys chain, and a Pareto chart ranking candidate causes, with a short paragraph justifying the leading hypothesis

Week 6

Lean Six Sigma methodology

  • Explain the purpose of the Improve phase and how solution selection criteria are set

  • Describe brainstorming, benchmarking, and piloting as ways to generate and test countermeasures

  • Explain mistake-proofing (poka-yoke) and give two examples of error prevention versus error detection

  • Outline a pilot plan with success criteria, a defined time box, and a rollback condition

Your checkpoint

A one-page pilot plan for a countermeasure addressing the root cause you identified in week 5, including success metric, baseline value, target value, pilot duration, and decision rule for adopting or abandoning

Week 7

Lean Six Sigma methodology & Principles and foundations of Lean Six Sigma

  • Explain the purpose of the Control phase and the elements of a control plan (metric, owner, frequency, response plan)

  • Describe how standard work, visual management, and response plans sustain gains after a project closes

  • Explain how Lean Six Sigma connects to broader quality frameworks and why project benefits must be verified before handover

  • Identify what could cause a project to regress and design a monitoring signal for each risk

Your checkpoint

A control plan document for your project with at least three monitored metrics, named owners, monitoring frequency, control limits or targets, and a documented reaction plan for out-of-target results

Week 8

Principles and foundations of Lean Six Sigma & Lean Six Sigma methodology

  • Review all eight weeks of notes and consolidate them into a single condensed reference sheet covering definitions, DMAIC outputs, and key formulas

  • Answer at least 60 practice questions across both domains and log every miss with the reason it was missed

  • Re-teach the weakest three topics aloud or in writing without notes, then correct any gaps you find

  • Confirm readiness by scoring consistently above 80 percent on mixed-domain practice and listing any remaining weak areas

Your checkpoint

A final readiness report: a two-page condensed reference sheet, a practice-question error log with corrections, and a scored mixed-domain self-test showing your result and the three topics you will review once more before exam day

Milestones

Week 2: You can define the core Six Sigma and Lean terms from memory and correctly convert DPMO to sigma level without notes

Week 4: Your project charter and SIPOC are complete and a reviewer can state the problem, goal, and scope from them alone

Week 6: You can explain every DMAIC phase output and defend a root cause with evidence rather than opinion

Week 8: You score 80 percent or higher on a mixed 60-question self-test and your error log shows no repeated mistake category