Mistake 1

Treating 'Lean' and 'Six Sigma' as interchangeable labels, so any question about waste elimination gets answered with a statistical tool (and vice versa).

Both terms appear together in the course title, so candidates memorise a single blended definition instead of two distinct lineages with different objectives.

What to do instead

Write a two-column contrast before the exam: Lean targets flow and the seven wastes with tools like value stream mapping, 5S, kanban and takt time; Six Sigma targets variation and defects with DMAIC, capability indices and statistics. For each practice question, first ask 'is this a speed/flow problem or a variation/defect problem?' and only then pick the tool.

Mistake 2

Confusing the defect rate implied by a sigma level (3.4 DPMO at six sigma) with the sigma level itself, or misplacing the 1.5 sigma shift.

The 3.4 DPMO figure is the most quoted number in Six Sigma marketing, so it gets memorised as 'the sigma level' rather than as the long-term defect rate of a 4.5 sigma short-term process.

What to do instead

Memorise a small anchor table: 1 sigma ≈ 691,462 DPMO, 3 sigma ≈ 66,807, 4 sigma ≈ 6,210, 5 sigma ≈ 233, 6 sigma ≈ 3.4. State explicitly that 3.4 DPMO corresponds to 4.5 sigma short-term with the 1.5 sigma shift, and practise converting in both directions.

Mistake 3

Listing the seven wastes but misclassifying a scenario - for example calling a queue of approvals 'overproduction' instead of 'waiting', or labelling rework as 'inventory'.

Candidates memorise the acronym (TIMWOOD) without a working definition of each waste, and exam scenarios describe office or service settings rather than factory floors.

What to do instead

Attach one concrete service example to each waste: transport = moving documents between offices; inventory = unprocessed claims sitting in a queue; motion = walking to a shared printer; waiting = approval delays; overproduction = reports nobody requested; overprocessing = duplicate data entry; defects = rejected applications. Classify by asking 'what resource is being consumed wastefully?'

Mistake 4

Calling a process 'capable' because Cpk is positive, or comparing Cp and Cpk without checking whether the process is centred.

The formulas look similar and candidates remember only that 'higher is better', missing that Cp ignores centring while Cpk penalises off-target processes.

What to do instead

Remember: Cp measures spread only (specification width ÷ 6 sigma); Cpk measures spread plus centring and is always ≤ Cp. A process can have Cp = 2.0 and Cpk = 0.6 if it is badly off-centre. Practise interpreting a pair of values and stating which problem - variation or offset - each one reveals.

Mistake 5

Describing DMAIC phases by name only, so questions that ask 'what happens in Measure?' or 'which phase produces the charter?' get answered with the wrong phase.

The five letters are easy to memorise in order, and candidates never build a phase-by-phase deliverable list.

What to do instead

Build a deliverables table: Define - charter, VOC/CTQ, SIPOC, problem statement; Measure - operational definitions, data collection plan, baseline capability, MSA; Analyse - root cause verification, hypothesis tests, Pareto/fishbone; Improve - pilot, DOE, mistake-proofing, implementation plan; Control - control charts, response plan, standard work, handover. Map every practice question to the phase that produces the named output.

Mistake 6

Treating DMADV/DFSS and DMAIC as interchangeable, or applying DMAIC to a product that does not yet exist.

Both are five-phase methodologies with similar acronyms, and the course often presents them side by side without drilling the selection criterion.

What to do instead

Use a single decision rule: if the process or product exists and needs fixing, use DMAIC; if it must be designed new or radically redesigned to meet a CTQ, use DMADV (Define, Measure, Analyse, Design, Verify). Note that DMADV is design-focused and its 'Verify' phase validates the design against the CTQ rather than controlling an existing process.

Mistake 7

Answering 'who does what' questions by assigning Yellow Belt responsibilities that belong to Green or Black Belts - for example claiming the Yellow Belt leads a DMAIC project or performs hypothesis testing independently.

Candidates study the tools without studying the role boundaries, and the belt hierarchy is assumed rather than learned.

What to do instead

Memorise the boundary: Yellow Belts contribute as team members, collect and validate data, use basic tools (check sheets, Pareto, fishbone, run charts, 5S), and support improvement events; Green Belts lead projects part-time within their area and apply basic statistics; Black Belts lead cross-functional projects, coach belts and handle advanced statistics and DOE; Master Black Belts own strategy and training. When a question names a tool or a leadership scope, match it to the lowest belt that owns it.

Mistake 8

Confusing the roles of sponsor/champion and process owner, or omitting the sponsor when asked who removes organisational barriers.

All three appear in project charters and candidates treat them as synonyms for 'the boss'.

What to do instead

Fix three distinct definitions: the sponsor/champion provides resources, approves the charter and removes barriers at management level; the process owner is accountable for the process after handover and sustains the control plan; the team leader/belt runs the day-to-day project work. Questions about funding, escalation and barrier removal point to the sponsor; questions about sustaining gains point to the process owner.

Mistake 9

Confusing a Pareto chart with a histogram or a fishbone with a flowchart, and choosing the wrong tool for a question that asks how to display or prioritise data.

The quality tools are learned as a list of names and pictures, not as answers to specific questions.

What to do instead

Learn each tool by the question it answers: Pareto - which few causes account for most of the effect (80/20, ranked bars plus cumulative line); histogram - what is the shape and spread of a single variable; fishbone - what candidate causes exist across Man, Machine, Material, Method, Measurement, Environment; check sheet - how often does it happen; run chart/control chart - is the process stable over time; flowchart/SIPOC - how does the process flow. Match the verb in the question (prioritise, display, brainstorm, monitor) to the tool.

Mistake 10

Answering root-cause questions with the first plausible cause, or accepting a correlation as proof of causation, instead of following the verify-the-cause step in Analyse.

Exam scenarios describe a symptom and a plausible explanation together, and candidates stop at the explanation rather than asking whether it has been tested against data.

What to do instead

Apply a fixed routine to every Analyse question: state the effect, generate candidate causes with a fishbone, narrow with a Pareto or stratification, then confirm with data (a 'therefore' test or a simple comparison) before proposing a countermeasure. Reject any option that jumps from symptom to solution without a verification step, and treat 'we have always known it is the machine' as an unverified opinion.