Springboard (Level 2) key terms
Springboard (Level 2) · Get comfortable with the vocabulary.
- Stakeholder
- Related: Stakeholder Mapping, RACI Matrix
Any person or group who affects, is affected by, or has an interest in the outcome of a piece of work. Stakeholders include sponsors, users, regulators, and delivery staff, each with different needs and influence.
- Deliverable
- Related: Acceptance Criteria, Scope
A tangible or intangible output produced as a result of work and handed over to a recipient. Deliverables are usually contractual or formally accepted items, distinct from internal work products that never leave the team.
- Scope
- Related: Scope Creep, Change Control
The boundary defining what work is included in an effort and, by implication, what is excluded. Clear scope statements prevent uncontrolled expansion and give a baseline against which changes can be assessed.
- Acceptance Criteria
- Related: Definition of Done, Deliverable
The conditions a deliverable must satisfy to be accepted by the recipient. They are written before work starts, are testable, and are used to decide whether an item is complete rather than merely finished.
- Assumption
- Related: Risk, Issue
Something accepted as true for planning purposes without proof. Assumptions carry risk, so they should be recorded, owned, and validated as work progresses; an invalidated assumption often becomes an issue.
- Constraint
- Related: Triple Constraint, Assumption
A limit that restricts available options, such as fixed budget, deadline, regulation, or available skills. Constraints are not problems to solve but boundaries within which solutions must be designed.
- Triple Constraint
- Related: Constraint, Scope Creep
The interdependent trade-off between scope, time, and cost, with quality affected by how the three are balanced. Changing one dimension normally forces adjustment in at least one other, which is why trade-offs must be explicit.
- Iterative Development
- Related: Increment, Minimum Viable Product
An approach that delivers work in repeated cycles, refining the product based on feedback after each cycle. It accepts that requirements emerge over time and favours early partial delivery over one large final release.
- Increment
- Related: Iterative Development, Definition of Done
A usable, potentially shippable addition to the product produced within an iteration. Each increment builds on previous ones, so value accumulates and the product is never wholly unfinished at any checkpoint.
- Minimum Viable Product
- Related: Iterative Development, Prototype
The smallest version of a product that lets a team test core assumptions with real users while spending the least effort. Its purpose is validated learning, not a cheap final product.
- Lean Thinking
- Related: Value Stream, Work in Progress Limit
A principle set focused on maximising value and removing waste from a process. Common wastes include waiting, rework, overproduction, and handoffs; lean practice maps value streams and limits work in progress.
- Systems Thinking
- Related: Root Cause Analysis, Value Stream
Analysing a problem as a set of interacting parts rather than isolated components, so that feedback loops and side effects are visible. It guards against local optimisations that damage overall performance.
- Requirements Elicitation
- Related: User Story, Stakeholder
The structured activity of drawing out needs from stakeholders through interviews, workshops, observation, or document analysis. Good elicitation uncovers underlying problems, not just stated feature requests.
- User Story
- Related: Acceptance Criteria, Requirements Elicitation
A short statement of a need written from a user's perspective, typically naming the role, the goal, and the reason. It is a placeholder for conversation rather than a full specification.
- Definition of Done
- Related: Acceptance Criteria, Increment
A shared checklist describing the quality conditions every item must meet before the team counts it complete. It prevents items being declared finished while testing, documentation, or review remain outstanding.
- Change Control
- Related: Scope Creep, Baseline
A formal process for logging, assessing, approving, or rejecting proposed changes to an agreed baseline. It records impact on scope, cost, and schedule so decisions are made deliberately rather than absorbed silently.
- Baseline
- Related: Change Control, Earned Value
An approved, frozen version of a plan or specification against which actual progress is compared. Baselines allow meaningful variance analysis; they change only through formal change control.
- Scope Creep
- Related: Scope, Change Control
The gradual, unapproved expansion of work beyond what was agreed. It typically appears as small helpful additions that are never assessed, and it erodes schedule and budget without any single visible decision.
- Root Cause Analysis
- Related: Five Whys, Systems Thinking
A structured technique for finding the underlying reason a problem occurred rather than treating its symptoms. Common methods include the five whys, fishbone diagrams, and fault tree analysis.
- Five Whys
- Related: Root Cause Analysis
A simple root cause technique that repeatedly asks why a problem happened, typically about five times, until the underlying cause is reached. It works best when answers are checked against evidence rather than guessed.
- Gap Analysis
- Related: Root Cause Analysis, Requirements Elicitation
Comparing the current state with a desired future state to identify what is missing and what must change. The output is usually a prioritised list of actions that close the difference.
- Earned Value
- Related: Baseline, Variance Analysis
A progress measure combining planned value, actual cost, and value of work completed to show cost and schedule performance. It answers whether work done is worth the money spent so far.
- Variance Analysis
- Related: Earned Value, Baseline
Comparing planned figures with actual figures to explain differences in cost, schedule, or quality. The aim is to understand causes and decide on corrective action, not merely to report the number.
- Kanban Board
- Related: Work in Progress Limit, Value Stream
A visual display of work items moving through defined stages, used to expose bottlenecks and limit simultaneous work. Columns represent process steps and cards represent items, making flow visible to the whole team.
- Work in Progress Limit
- Related: Kanban Board, Lean Thinking
A cap on how many items may be in a given stage at once. Limiting concurrent work reduces context switching, shortens cycle time, and forces the team to finish work before starting more.
- Value Stream
- Related: Lean Thinking, Kanban Board
The full sequence of steps required to take a need from request to delivered value, including waiting time and handoffs. Mapping it reveals where delay and waste accumulate, which is often not where work happens.
- Prototype
- Related: Minimum Viable Product, Requirements Elicitation
A rough early model of a product or process built to test understanding with users before full investment. Low-fidelity prototypes are cheap and invite criticism; high-fidelity ones test detailed interaction.
- Risk Register
- Related: Risk Appetite, Issue
A maintained log of identified risks, each with an owner, likelihood, impact, and planned response. It is a living document reviewed regularly, not a one-off list produced at kickoff.
- Risk Appetite
- Related: Risk Register, Mitigation
The amount of risk an organisation is willing to accept in pursuit of its objectives. It guides whether a given risk is tolerated, treated, transferred, or avoided, and should be set at leadership level.
- Mitigation
- Related: Risk Register, Risk Appetite
An action taken to reduce the likelihood or impact of a risk before it occurs. Mitigation differs from a contingency plan, which is triggered only if the risk actually materialises.
- Issue
- Related: Risk Register, Assumption
A problem that has already occurred and is currently affecting the work, unlike a risk which is still uncertain. Issues need an owner and a resolution date, and are tracked separately from risks.
- Compliance Obligation
- Related: Constraint, Audit Trail
A requirement imposed by law, regulation, contract, or internal policy that the work must satisfy. Obligations are non-negotiable constraints and should be identified early, since late discovery is costly.
- Audit Trail
- Related: Compliance Obligation, Change Control
A recorded history of decisions, changes, and approvals that allows an independent party to reconstruct what happened and why. It supports accountability and is often required by regulation.
- RACI Matrix
- Related: Stakeholder, Stakeholder Mapping
A chart assigning each activity to people who are Responsible, Accountable, Consulted, or Informed. It clarifies decision rights; exactly one person should be accountable for each row to avoid ambiguity.
- Stakeholder Mapping
- Related: Stakeholder, RACI Matrix
Plotting stakeholders by influence and interest to decide how closely each must be engaged. High-influence, high-interest parties need active management; low-interest parties need only summary communication.
- Active Listening
- Related: Requirements Elicitation, Stakeholder Mapping
Concentrating fully on a speaker to grasp both content and intent, then confirming understanding by summarising. It reduces misunderstanding and is especially valuable when requirements are being elicited from busy stakeholders.
- Conflict of Interest
- Related: Professional Integrity, Confidentiality
A situation where a person's private interest could improperly influence a professional judgement. It must be disclosed promptly, and the person may need to withdraw from the affected decision.
- Professional Integrity
- Related: Conflict of Interest, Confidentiality
Acting honestly and consistently with stated values, including when no one is checking and when honesty is inconvenient. It includes reporting bad news early rather than concealing problems until they become unavoidable.
- Confidentiality
- Related: Professional Integrity, Compliance Obligation
Protecting information entrusted to you from unauthorised disclosure, including after a working relationship ends. It applies to client data, personal information, and commercially sensitive material alike.