A 35,000 dwt product tanker has a 440 V, 60 Hz, three-phase, three-wire insulated system with an earth fault detection relay and indicator lamps on the main switchboard. The ship is approaching a river berth with the pilot on board, two tugs made fast and a strong ebb tide running. Both generators are paralleled: one 1,000 kVA machine at about 60% load and the second at about 30%. During the approach, with the bow thruster and windlass running, the earth fault alarm starts to flicker and then becomes steady. The board insulation monitor shows 0.15 MΩ to earth against a normal 5–20 MΩ. The bridge needs the bow thruster for the final approach in about 15 minutes. The second engineer suggests opening the bus tie and running each generator on its own section so that the manoeuvre can continue.

1. Explain what an earth fault on an insulated system means for continued operation, and advise the master whether to continue the approach.

Read the worked answer

The 440 V system is an IT (insulated) system: the neutral is not earthed, so a single fault to earth has no return path, no fault current flows and no protective device operates. That is why the ship can keep running. But the healthy phases are now raised to line voltage (about 440 V rather than 254 V) to earth, which stresses the insulation of every connected machine, and a second fault on a different phase completes a line-to-line circuit through the hull. If that happens with both generators paralleled, the short circuit can trip both machines and black the ship out with tugs made fast and the pilot committed.

Advice to the master: the fault can be carried, but only deliberately and with the risk managed. Continuing the approach is defensible because the ship is already committed, the tugs are made up, and abandoning the approach to anchor in a strong ebb in a busy channel carries its own risk. The master must be told plainly that the residual risk is a blackout during the final manoeuvre, and the decision is his.

If he decides to berth, I would recommend: keep both generators on the board with load shared so no single machine is near its limit; avoid starting or stopping large consumers such as the bow thruster and windlass unless essential; station a man at the switchboard; confirm the emergency generator is on automatic and has been proven; and leave steering gear and navigation equipment undisturbed.

2. Describe your systematic method for locating the fault, and the order in which you would test loads.

Read the worked answer

Work outward from the board and record every step, because the record is what proves the fault was managed.

  1. Confirm the alarm is real. Read the board insulation monitor and check with a portable insulation tester on the isolated section, using a test voltage compatible with the connected electronics.
  2. Look for environmental causes first. Water in deck junction boxes, a damp windlass or bow thruster motor terminal box, condensation, or a leaking gland after rain or heavy weather are the commonest sources, and they fit the timing because deck machinery was running when the alarm appeared.
  3. Open non-essential feeders one at a time - galley, air conditioning, provision refrigeration, deck machinery, cargo pump auxiliaries - and watch the monitor after each. Restore each feeder before opening the next so you never have two circuits open and lose the comparison.
  4. Test the 440/220 V lighting transformer by opening its primary. If the alarm clears, the fault is downstream on the 220 V side. Never open a transformer secondary while it is live.
  5. Test essential feeders only with the bridge informed, since steering gear, navigation and radio must not be interrupted during an approach.
  6. For each suspect motor, isolate it, lock off, and measure insulation resistance phase-to-earth and phase-to-phase.
  7. Check the portable appliances and the battery charger - a classic source of intermittent alarms that clear and reappear as the charger cycles.

3. If the fault cannot be located before berthing, what do you do?

Read the worked answer

The objective changes from finding the fault to limiting the consequence of a second one.

  • Split the main switchboard. The second engineer's suggestion is sound if it is done properly: open the bus tie and run each generator on its own section, so a second earth fault on one section cannot short the other. Re-share the load carefully before opening the tie, keep each machine well inside its rating, and confirm that essential services (steering gear, navigation, radio, emergency lighting) remain supplied on the section that carries them.
  • Keep the faulted section as lightly loaded as possible and avoid switching large consumers.
  • Post a watchkeeper at the switchboard for the whole manoeuvre, with the emergency generator in automatic and proven, the emergency lighting tested, and the emergency fire pump ready.
  • Inform the master in writing of the condition, the readings, and what has been done; inform the company and, where the local regime requires it, the port state that the ship has a defect affecting the safety of the ship.
  • Arrange a shore electrician and the class surveyor at the berth, and do not close the defect until the insulation is restored to its normal value and the cause has been identified and repaired.
  • Record everything - insulation readings, each feeder opened, times, and the reasoning - in the engine room log and the SMS defect report, because a blackout with this history on file would otherwise look like negligence.