MARINA Second Engineer / Chief Engineer Theoretical Exam study materials
MARINA Second Engineer / Chief Engineer Theoretical Exam study resources

MARINA Second Engineer / Chief Engineer Theoretical Exam cheat sheet

MARINA Second Engineer / Chief Engineer Theoretical Exam · Keep the key ideas within reach.

Quick reference

Marine Engineering Knowledge and Principles

  • Thermal efficiency of an ideal Diesel cycle = 1 − (1/r^(γ−1)) · (ρ^γ − 1)/(γ(ρ − 1)), where r = compression ratio, ρ = cut-off ratio, γ = cp/cv.

  • Indicated power (single-acting four-stroke, one cylinder) = pmi · L · A · N / (2 · 60) in kW, with pmi in kPa, L and bore in m, N in rpm.

  • Brake specific fuel consumption (bsfc) = fuel mass flow (kg/h) ÷ brake power (kW); typical large two-stroke values are 160–175 g/kWh.

  • Volumetric efficiency = actual air mass delivered per cycle ÷ theoretical swept-volume air mass at intake conditions; scavenge air excess ratio λ is typically 2.0–2.5 for two-strokes.

  • Heat balance rule: fuel energy = brake work + jacket cooling + exhaust + radiation/lubricating-oil losses; exhaust and cooling together commonly account for 40–50%.

  • Compression ratio r relates to swept volume Vs and clearance volume Vc by r = (Vs + Vc)/Vc; raising r raises thermal efficiency but raises peak firing pressure.

  • Mean effective pressure pme = 2π · nR · T / Vs for a four-stroke (per cycle work divided by swept volume); pme is the load indicator independent of engine size.

  • For torsional vibration, resonance occurs when a harmonic excitation order equals the shaft natural frequency; barred-speed ranges must be avoided in the operating band.

Quick reference

Marine Propulsion Machinery and Main Engines

  • Propeller law: absorbed power P ∝ N³ and thrust/drag ∝ N² for a fixed-pitch propeller, so a 10% rpm increase raises power demand by about 33%.

  • Diesel engine governor droop (speed droop) = (N_no-load − N_full-load)/N_rated × 100%; 3–5% is typical for propulsion engines, zero droop for alternators in isochronous mode.

  • Two-stroke crosshead engines use a separate cylinder oil feed (often 0.6–1.2 g/kWh, adjusted by sulphur content) and a system oil for bearings; four-strokes use a common sump oil.

  • Starting air: minimum 12 starts for reversible engines and 6 for non-reversible, per SOLAS II-1; air bottles normally at 30 bar (25–30 bar working range).

  • Turbocharger surging is indicated by repeated pressure pulsations and is countered by reducing load, cleaning the air side, or checking nozzle ring and charge-air cooler fouling.

  • Cylinder liner wear rate target is generally below 0.05 mm per 1,000 hours; excessive wear points to incorrect cylinder oil feed, fuel sulphur, or poor combustion.

  • Slow-steaming reduces fuel consumption roughly with N³ but increases fouling, low-load turbocharger efficiency loss, and risk of poor combustion; minimum stable load must be respected.

  • Crankcase explosion prevention: oil mist detector alarm at 2.5% LEL (0.05 mg/l range) triggers immediate load reduction and investigation; never open crankcase doors before cooling.

Quick reference

Marine Auxiliary Machinery and Systems

  • Pump affinity laws: Q ∝ N, H ∝ N², P ∝ N³ for a centrifugal pump at constant impeller diameter; throttling moves the operating point along the system curve.

  • Centrifugal pumps must be primed and started with the discharge valve closed (or partly open); never run dry - cavitation occurs when NPSH available falls below NPSH required.

  • NPSH_a = (p_atm − p_vapour)/(ρg) + static head − friction losses; a rising suction temperature lowers NPSH_a because vapour pressure rises.

  • Purifier bowl separation depends on the Stokes-law settling velocity; throughput must be reduced when viscosity rises or density difference between oil and water falls.

  • Boiler safety valves: at least two, set to lift not later than design pressure; the boiler must not be fired with low water level - low-water interlock cuts fuel.

  • Air compressor intercooler and aftercooler reduce compression work and condensate; drain traps must be checked to prevent water carry-over into air receivers.

  • Freshwater generator uses jacket-water heat; output falls as vacuum is lost or scale builds on the evaporator tubes; scale is removed by acid cleaning per maker's procedure.

  • Steering gear: SOLAS requires two independent power actuating systems or one system with two independent pump units; main and auxiliary steering gear drills are held every 3 months.

Quick reference

Shipboard Electrical, Electronic, and Control Systems

  • Three-phase power P = √3 · V_L · I_L · cos φ; a low power factor increases current for the same kW and raises generator and cable loading.

  • Synchronous generator parallel operation requires matching voltage, frequency, phase sequence, and phase angle; load sharing is set by governor speed droop.

  • Insulation resistance testing: minimum acceptable values per IEC 60092 are typically ≥1 MΩ at 500 V DC for low-voltage circuits; record and trend readings.

  • Short-circuit protection: discrimination requires the downstream breaker to trip before the upstream device; check time-current curves rather than ratings alone.

  • Earthing systems: an IT (isolated) distribution is standard on ships, so a single earth fault does not trip; an earth-fault alarm must be found and cleared promptly.

  • PID control: proportional band, integral time, and derivative time; integral action removes offset, derivative reduces overshoot but amplifies measurement noise.

  • Battery and UPS: lead-acid cells give 2.0 V nominal, vented; charging voltage is temperature-compensated; hydrogen must be ventilated from battery rooms.

  • Automatic voltage regulator maintains generator terminal voltage within ±2.5% steady state; excitation loss causes reactive power import and possible pole slipping.

Quick reference

Engineering Watchkeeping and Operational Procedures

  • STCW rest hours: minimum 10 hours rest in any 24-hour period and 77 hours in any 7-day period; rest may be split into no more than two periods, one at least 6 hours.

  • Watch handover must include: machinery status, ongoing work and permits, abnormal readings, fuel/water/lube levels, and standing orders; never hand over during a critical manoeuvre.

  • Unattended machinery space (UMS) requires alarms and safety systems tested before the ship enters UMS mode; the engineer on call must be within the alarm response time.

  • Manoeuvring: acknowledge bridge order, repeat it, execute, and report; standby time before manoeuvring is typically 1 hour, with steering gear tested and air bottles full.

  • Engine room log readings are taken at fixed intervals (normally hourly at sea) and compared with trends; deviations from baseline trigger investigation, not just recording.

  • Bunkering checklist: agreed transfer rate, tank soundings before/after, scuppers plugged, overflow tank monitored, communication with barge, and drip trays in place.

  • Blackout recovery: emergency generator auto-starts within 45 s per SOLAS; main engine restart requires starting air and fuel supply; the sequence is drilled regularly.

  • Permit-to-work systems cover hot work, enclosed-space entry, working aloft, and electrical isolation; the isolation certificate must be signed by the responsible engineer.

Quick reference

Marine Maintenance, Repair, and Planned Maintenance Systems

  • Planned maintenance system (PMS) schedules by running hours, calendar time, or condition; condition-based tasks use vibration, oil analysis, thermography, and performance trending.

  • Wear limits must come from the maker's manual; for example, cylinder liner wear and piston-ring groove clearance have stated maximum values, and exceeding them requires renewal.

  • Vibration monitoring: overall velocity (mm/s RMS) per ISO 10816 bands; a rising trend or step change indicates misalignment, unbalance, bearing wear, or looseness.

  • Oil analysis: check viscosity, water content, total base number (TBN), insolubles, and wear metals (Fe, Cu, Pb, Sn, Si); trend over time rather than one-off values.

  • Spare parts management: critical spares identified by failure consequence; minimum stock levels set from lead time and consumption rate, with certificates retained.

  • Overhaul records should capture measured clearances before and after, parts replaced, torque values, and running hours, so the next interval can be adjusted.

  • Class surveys: annual, intermediate, and special (5-year) surveys; continuous survey machinery (CSM) spreads items across the cycle and requires a planned schedule.

  • Defect reporting: machinery defects affecting class or safety are reported to class and flag state; temporary repairs need approval and are time-limited.

Quick reference

Maritime Safety, Pollution Prevention, and Environmental Compliance

  • MARPOL Annex I: oily water separator discharge must be ≤15 ppm with an approved alarm and automatic stopping device; discharge is prohibited in special areas.

  • MARPOL Annex VI sulphur limits: 0.50% m/m global and 0.10% m/m in ECAs; compliance by low-sulphur fuel, scrubber, or alternative fuel, with records and changeover logs.

  • NOx Tier limits apply to engines over 130 kW; Tier III applies in NOx ECAs for new engines and requires SCR or equivalent; Tier I/II apply outside.

  • Oil record book entries must be made without delay for each transfer, disposal, or OWS operation; falsification is a criminal offence in most jurisdictions.

  • Garbage management per MARPOL Annex V: food waste discharge limits depend on distance from land and comminution; plastics may never be discharged.

  • Ballast water management: D-1 exchange or D-2 treatment per the BWM Convention; records and a ballast water record book are mandatory.

  • SOPEP and emergency drills: oil spill response equipment must be inventoried and drills logged; reportable spills go to the coastal state without delay.

  • Energy efficiency: EEXI and CII apply to ships over 5,000 GT; SEEMP Part II and III are required, and CII rating (A–E) affects chartering.

Quick reference

Maritime Law, STCW Standards, and Regulatory Framework

  • SOLAS Chapter II-1 covers subdivision and machinery; Chapter II-2 fire safety; Chapter IX ISM; Chapter XI-1/2 surveys and port state control.

  • STCW certification: officer of the watch requires sea service, approved training, and competence assessment; certificates of competency are issued by the flag state.

  • MARPOL certificates (IOPP, ISPP, IAPP, IEEC) are issued after survey and must be on board and valid; expiry stops trading.

  • ISM Code requires a Safety Management System with a designated person ashore, master's authority, and documented procedures; non-conformities are recorded and closed out.

  • MLC 2006 covers crew accommodation, hours of rest, wages, repatriation, and complaint procedures; it is enforced by flag and port state.

  • Port state control: deficiencies can lead to detention; the ship must rectify before departure, and detentions are published in regional databases.

  • UNCLOS and collision regulations: COLREGS Rule 2 (good seamanship) and Rule 5 (lookout) apply to all vessels; engineers must understand manoeuvring signals.

  • Flag state vs port state: flag state exercises jurisdiction over the ship; port state verifies compliance when in port under its jurisdiction.

Quick reference

Ship Construction, Stability, and Damage Control for Engineers

  • Archimedes: displacement (tonnes) = underwater volume (m³) × density (t/m³); for seawater use 1.025 t/m³.

  • GM = KM − KG; positive GM gives initial stability; GZ curve area gives dynamical stability; IMO intact stability criteria include area under GZ to 30° ≥ 0.055 m·rad.

  • Free surface effect reduces effective GM by FSC = i·ρ / (Δ) summed over tanks; longitudinal subdivision reduces free surface moment.

  • Damage control: flooding a compartment raises KG and may create free surface; counter-flooding must consider list and longitudinal strength.

  • Watertight subdivision: collision bulkhead position per SOLAS, double bottom height, and watertight doors must be operable and tested; indicator lights on the bridge.

  • Hull stress: still-water bending moment plus wave-induced bending; engineers must avoid uneven ballast/fuel distribution that raises hogging or sagging stress.

  • Fire triangle and fire classes: A (solid), B (liquid), C (gas), D (metal), F (cooking oil); fixed systems include CO2, foam, water mist, and dry powder.

  • Enclosed space entry: test oxygen (20.9%), hydrocarbons, CO, and H2S before entry; continuous monitoring and a standby person at the entrance are required.

Quick reference

Ship Construction, Stability, and Damage Control for Engineers

  • Archimedes: displacement (tonnes) = underwater volume (m³) × density (t/m³); for seawater use 1.025 t/m³.

  • GM = KM − KG; positive GM gives initial stability; GZ curve area gives dynamical stability; IMO intact stability criteria include area under GZ to 30° ≥ 0.055 m·rad.

  • Free surface effect reduces effective GM by FSC = i·ρ / Δ summed over tanks; longitudinal subdivision reduces free surface moment.

  • Damage control: flooding a compartment raises KG and may create free surface; counter-flooding must consider list and longitudinal strength.

  • Watertight subdivision: collision bulkhead position per SOLAS, double bottom height, and watertight doors must be operable and tested; indicator lights on the bridge.

  • Hull stress: still-water bending moment plus wave-induced bending; engineers must avoid uneven ballast/fuel distribution that raises hogging or sagging stress.

  • Fire triangle and fire classes: A (solid), B (liquid), C (gas), D (metal), F (cooking oil); fixed systems include CO2, foam, water mist, and dry powder.

  • Enclosed space entry: test oxygen (20.9%), hydrocarbons, CO, and H2S before entry; continuous monitoring and a standby person at the entrance are required.