A 3.5-hectare linear park runs 900 m along the Iloilo River on city-owned land. The 1-in-25-year flood level is 1.8 m above existing grade; the site currently inundates 0.4–1.2 m deep for two to six days, two or three times a year, at velocities around 0.5 m/s. The mayor wants a continuous concrete promenade raised to +2.0 m, a 1,000 m² sunken garden, and an events lawn for 2,000 people. The budget is PHP 80 million, and the city's maintenance crew has four staff and one mower. An adjacent 12-hectare subdivision is asking to discharge its storm drainage directly into the park through a 900 mm outfall at the north end. A 300 m strip of bamboo and mangrove fringe lines the river.
1. Which program elements belong in the floodable zone, and at what elevations? Justify your answer using flood storage, velocity, and risk.
Read the worked answer
A continuous promenade at +2.0 m is a levee in all but name. It would cut the park off from the river, reduce floodplain storage, and concentrate flow and scour at its ends and at every opening. When it is overtopped - and it will be, since the 1-in-25-year level is 1.8 m - the river will attack the structure from behind.
Recommended elevation strategy:
- Below +1.0 m: multi-use lawn, native meadow, and planted basins that are designed to be inundated. No electrical services, no fixed furniture, no vulnerable materials.
- +1.0 to +1.5 m: a pervious or boardwalk promenade on piles in the most frequently flooded reach, so water passes under and debris does not dam against it. Where a solid edge is needed, use a sloped, riprap or vegetated revetment rather than a vertical wall.
- Above +2.0 m: the only places for permanent structures - toilets, storage, kiosks, stage - set back from the river and connected by an accessible route that stays dry.
Hardscape should be limited to what can be hosed down after a flood. Everything in the floodable zone must be replaceable and liftable, because the maintenance crew, not the design, determines whether the park survives its first wet season.
2. The subdivision wants to discharge through a 900 mm outfall into the park. How do you respond, and what would you require?
Read the worked answer
A raw 900 mm outfall dumps sediment, trash, hydrocarbons, and high-velocity flow into the park at its most erodible point. The park would become the subdivision's sedimentation basin, at the city's cost. Accept the discharge only as a designed, treated, and maintained system.
Requirements:
- An energy dissipater and riprap apron at the outlet so the jet does not scour the bank.
- A treatment train before discharge: trash screen, sedimentation basin sized for the design storm, and a vegetated swale or constructed wetland polishing stage. These can be designed as park features but must be maintained as infrastructure.
- A flow control structure limiting the discharge rate to the park's capacity, with the subdivision retaining the difference on site.
- A drainage permit and compliance with the Clean Water Act, plus water quality monitoring at the outlet.
- A written maintenance agreement and a legal easement making the subdivision responsible for desilting and repair, with the obligation running with the land.
- A performance bond for the first years of operation.
Without these, the answer is no. The park cannot absorb another development's drainage problems by default.
3. Evaluate the 1,000 m² sunken garden and the 2,000-person events lawn against the flood regime and the four-person maintenance crew. What would you recommend?
Read the worked answer
Sunken garden - delete or redesign. In a floodplain, a sunken garden is a sediment and debris trap, a drowning hazard during flash inundation, and a pumping problem for a crew that has no pump. If a depressed landscape is wanted, make it a designed bioretention basin with a shallow, gently sloped profile, a hardened inlet, and a planted palette that tolerates both inundation and drought - a feature that floods is acceptable if it is meant to.
Events lawn - reduce and harden. A 2,000-person lawn implies irrigation, mowing, aeration, trash service, and toilets, which four staff and one mower cannot sustain. Reduce the lawn to 600–800 m², use a robust flood-tolerant grass or a native groundcover meadow, and put the stage and the crowd on a raised, free-draining terrace above the 1-in-25-year level. Bookings then do not depend on the river.
Budget and maintenance. PHP 80 million buys a lot of concrete and very little maintenance. Set aside a defined annual maintenance budget, specify materials that survive inundation, and design so that post-flood cleanup is sweeping and hosing, not rebuilding. The design should be judged by what it looks like the week after a flood, not the week it opens.