Carpentry NC II flashcards
Carpentry NC II · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Accomplishment report
- A daily record listing the tasks completed, crew names, man-hours, materials used, and equipment deployed on a site, signed by the foreman and verified by the supervisor.
- Request for information
- A written query sent to the designer to resolve a conflict, omission, or ambiguity in the plans; work proceeds only on the written response, which is logged in the project file.
- Hierarchy of control
- The order of risk controls from most to least effective: elimination, substitution, engineering controls, administrative controls, and personal protective equipment as the last resort.
- Fall protection threshold
- In general construction, fall protection is required at heights of 1.8 meters (6 feet) or more, using guardrails, personal fall-arrest systems, or equivalent controls.
- Scaffold inspection tag
- A tag attached to a scaffold recording the date of inspection by a competent person and the pass or fail status; scaffolds are inspected before each shift and after alteration.
- Waste segregation
- Sorting site waste into biodegradable, recyclable, and residual or hazardous streams; used oil, paint cans, and solvent rags are hazardous and never poured into drains.
- Sticker stacking
- Placing lumber on spacers called stickers over level bearers, off the ground and under cover, so air circulates and boards do not warp or stain.
- Residual current device
- A protective device on a power circuit that trips when it detects current leaking to earth, reducing electric shock risk from damaged tools and cords.
- First-in first-out storage
- A stock rule in which the oldest cement or material is issued first; bags are kept dry on pallets, and expired bags are tested or rejected before use.
- Tool tag-out
- Marking a defective tool as out of service and removing it from the work area until repaired, so no one uses equipment that fails inspection.
- Drawing scale ratio
- The ratio of drawing distance to actual distance; at 1:50, one millimeter on paper represents fifty millimeters on site, so a 20 mm line is 1,000 mm actual.
- Elevation datum
- A stated reference level, such as finished floor at 0.00, from which all vertical dimensions on the drawings are measured rather than from the existing ground.
- Door and window schedule
- A table listing each door and window by tag, with size, type, material, and hardware, used to order materials and set rough openings.
- 3-4-5 squaring method
- A layout method that marks 3 units along one line and 4 along the other; when the diagonal between the marks measures 5 units, the corner is square.
- Equal diagonals check
- A squareness check for a rectangle in which both corner-to-corner diagonals are measured; equal diagonals confirm square, and unequal ones require adjustment.
- Batter boards
- Horizontal boards set beyond the excavation line, carrying stretched strings that mark the building outline and can be re-stretched after digging disturbs the lines.
- Site benchmark
- A fixed, protected point of known elevation used as the reference for all level transfers; it is never moved without recording the new elevation.
- Form release agent
- A coating applied to clean form panels before placing reinforcement so concrete does not bond to the forms; it must not contaminate reinforcement or construction joints.
- Camber in formwork
- A slight upward curve built into long-span beams and slabs to offset deflection; the specified camber is measured at midspan before the concrete pour.
- Form stripping strength
- The concrete strength at which soffit forms and props may be removed; removal depends on tested strength, not on a fixed number of days.
- Double top plate
- Two plates at the top of a wall that distribute loads and lap at corners and intersections, tying adjoining walls together in platform framing.
- Jack and king studs
- King studs run full height beside an opening, while jack studs support the header; both are sized and placed per the structural plans.
- Roof pitch
- Rise over run expressed as a ratio, such as 4:12 meaning 4 units of rise for every 12 units of run; the angle is the arctangent of rise divided by run.
- Rafter length multiplier
- A factor derived from the unit rise per unit run that, multiplied by the rafter run, gives the rafter length for a given roof pitch.
- Collar tie
- A horizontal member connecting opposing rafters, usually in the upper third of the roof, that resists rafter separation and adds stability to the roof frame.
- Mortise and tenon
- A joint in which a projecting tenon on one member fits into a cut mortise in another; the tenon is typically about one-third of the rail thickness.
- Dado joint
- A groove cut across the grain of a board to receive another board, commonly used for shelving and cabinet carcasses, with depth about one-third of board thickness.
- Coped inside corner
- A trim joint in which the end of one molding is cut to the profile of the adjoining piece, producing a tight inside corner that resists seasonal movement gaps.
- Wood movement allowance
- Solid wood expands and contracts across the grain with moisture; panels are floated in grooves and fasteners leave room so the wood does not split or buckle.
- Hold point
- A stage in construction where work cannot proceed until an inspection is completed and signed off, such as before pouring concrete or closing a wall.
- Punch list
- A record of defects found at inspection, giving location, description, and responsible trade; items are closed and verified before final acceptance of the work.
- As-built drawings
- Drawings revised to show the actual installed conditions, including changes from the original plans, submitted as part of the project completion documents.