Carpentry NC II key terms
Carpentry NC II · Get comfortable with the vocabulary.
- Bar chair
- Related: Concrete cover, Formwork
A small wire or plastic support placed under reinforcing steel to hold the rebar at the specified distance above the formwork surface, keeping the concrete cover correct during pouring.
- Batter board
- Related: Setting out, String line
A horizontal board fixed to stakes outside the building outline, used to hold string lines that mark the exact position and level of walls and foundations during setting out.
- Birdsmouth cut
- Related: Rafter, Top plate
A notch cut into the underside of a rafter so it sits flat and secure on the top plate of a wall, controlling the seat cut and heel of the rafter.
- Brace
- Related: Shoring, Racking
A diagonal member fixed across a frame or formwork to stop it from racking or distorting under load, keeping the structure square and stable during construction.
- Camber
- Related: Formwork, Deflection
A slight upward curve built into a beam or formwork so it becomes level once the concrete or load settles, preventing a sagging appearance in the finished structure.
- Concrete cover
- Related: Bar chair, Rebar
The thickness of concrete between the outer surface of the embedded reinforcing steel and the nearest exposed concrete face, protecting the rebar from corrosion and fire.
- Curing
- Related: Formwork removal, Concrete cover
Keeping freshly placed concrete moist and at a suitable temperature for a set period so it gains strength and durability, usually by wetting, covering, or sealing the surface.
- Dead load
- Related: Live load, Load path
The permanent, stationary weight a structure must carry, such as walls, floors, roofing, and fixed equipment, as opposed to movable live loads.
- Deflection
- Related: Camber, Span
The amount a beam, joist, or form member bends or sags under load, which must stay within allowed limits to avoid cracking finishes or failing the structure.
- Datum
- Related: Benchmark, Setting out
A fixed reference point or line of known elevation from which all other levels on a project are measured and transferred during layout and construction.
- Fall protection
- Related: Personal protective equipment, Toolbox meeting
A system of guardrails, safety nets, harnesses, or anchor points used to prevent workers from falling when working at height above a set threshold.
- Formwork
- Related: Shoring, Formwork removal
The temporary mould of boards, panels, and supports that holds wet concrete in shape and position until it hardens enough to stand on its own.
- Formwork removal
- Related: Curing, Formwork
The controlled stripping of form panels and supports after concrete has reached adequate strength, done in a safe sequence to avoid damage or collapse.
- Hazard identification
- Related: Risk control, Toolbox meeting
The process of spotting conditions or acts at the workplace that could cause injury or damage, then assessing and controlling the risk before work continues.
- Housekeeping
- Related: Material segregation, Hazard identification
Keeping the work area clean and orderly by clearing offcuts, storing materials safely, and removing waste, which reduces slips, trips, and fire hazards.
- Job safety analysis
- Related: Toolbox meeting, Risk control
A written breakdown of a task into steps, with the hazards of each step and the controls required, prepared and discussed before the work begins.
- Joist
- Related: Span, Live load
A horizontal framing member that supports a floor or ceiling and transfers its load to beams, girders, or walls, usually spaced at regular centres.
- Layout
- Related: Setting out, Datum
The process of marking positions, lines, and levels on the ground or on materials according to the drawings, so that construction elements are placed accurately.
- Live load
- Related: Dead load, Joist
The variable, movable weight a structure must support, such as people, furniture, stored goods, and equipment, which changes over the life of the building.
- Load path
- Related: Dead load, Live load
The continuous route by which forces travel from a roof or floor down through beams, columns, and walls into the foundation and the ground.
- Material segregation
- Related: Housekeeping, Waste disposal
Sorting and storing waste and materials by type, such as timber, metal, and concrete, so they can be reused or recycled and do not pollute the site.
- Material take-off
- Related: Bill of materials, Specification
A documented list of the quantities of materials needed for a job, calculated from the drawings and specifications, used for ordering and cost control.
- Method statement
- Related: Job safety analysis, Risk control
A written document describing how a work activity will be carried out safely and in the correct sequence, including resources, controls, and responsibilities.
- Out of plumb
- Related: Plumb bob, Square
Not vertical, describing a wall, post, or frame that leans away from true vertical, which must be corrected before it affects the structure or finishes.
- Personal protective equipment
- Related: Fall protection, Hazard identification
Gear worn by a worker to reduce exposure to hazards, such as a hard hat, safety boots, gloves, eye protection, and hearing protection, used as a last line of defence.
- Plumb bob
- Related: Out of plumb, Spirit level
A pointed weight hung from a string to establish a true vertical line, used to check that posts, walls, and formwork are standing straight.
- Racking
- Related: Brace, Shoring
The distortion of a rectangular frame into a parallelogram under sideways force, prevented by diagonal bracing or sheathing fixed to the frame.
- Rafter
- Related: Birdsmouth cut, Top plate
A sloping framing member that runs from the ridge or wall plate down to the eaves and supports the roof covering, forming the shape of the roof.
- Rebar
- Related: Concrete cover, Bar chair
Steel reinforcing bars placed inside concrete to carry tensile forces, cut, bent, and tied in position according to the structural drawings before pouring.
- Risk control
- Related: Hazard identification, Job safety analysis
The measures taken to eliminate or reduce a hazard, applied in order of preference: remove the hazard, substitute, isolate, engineer controls, then use administrative controls or protective equipment.
- Setting out
- Related: Batter board, Datum
Transferring the dimensions and positions from the drawings onto the ground or building, using lines, pegs, and levels, so the structure is built in the right place.
- Shoring
- Related: Brace, Formwork
Temporary props, posts, or frames used to support an existing structure, excavation, or formwork while work is carried out or until permanent support is in place.
- Span
- Related: Joist, Deflection
The clear horizontal distance between the supports of a beam, joist, or rafter, which determines the member size needed to carry the load safely.
- Specification
- Related: Working drawing, Material take-off
The written part of the contract documents that states the quality, materials, workmanship, and standards required for each part of the work.
- Spirit level
- Related: Plumb bob, Out of plumb
A tool with sealed vials of liquid and an air bubble used to check whether a surface is horizontal or vertical by centring the bubble between the marks.
- String line
- Related: Batter board, Setting out
A taut cord stretched between two points to mark a straight line or level, used to align walls, formwork, and paving during layout and checking.
- Toolbox meeting
- Related: Job safety analysis, Hazard identification
A short, informal safety briefing held at the work area before a shift or task to discuss hazards, controls, and the plan for the day's work.
- Top plate
- Related: Rafter, Birdsmouth cut
The horizontal timber fixed along the top of a wall frame to tie the studs together and carry the ceiling or roof framing above.
- Waste disposal
- Related: Material segregation, Housekeeping
The lawful removal of construction waste from site to approved facilities, following segregation and environmental rules to avoid pollution.
- Working drawing
- Related: Specification, Layout
A detailed drawing, including plans, elevations, and sections, that gives the dimensions and construction information needed to build a specific part of the project.