Construction Painting NC II · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Apply paint and coatings by brush, roller, and spray & Use and maintain painting tools, equipment, and materials

  • Identify and name the parts and controls of a brush, roller assembly, and a conventional spray gun, stating what each control adjusts

  • Demonstrate correct brush loading, tipping off, and laying on for a flat wall panel, keeping the wet edge active

  • Set up a roller with the correct nap for a smooth and a rough surface, and explain the choice aloud

  • Practice spray gun setup: select nozzle and fluid tip, set air pressure, and test the fan pattern on scrap board

  • Log every tool and material used in a personal inventory sheet with its correct name and care instruction

Your checkpoint

A written tool-and-material inventory of at least 20 items with care instructions, plus a timed 1 m2 brush and roller practice panel photographed with notes on defects

Week 2

Apply paint and coatings by brush, roller, and spray & Apply safety practices and environmental protection in construction painting

  • Apply a full coat by brush, roller, and spray to three same-size boards and compare film thickness, texture, and overspray

  • Correct common application faults (sags, runs, brush marks, orange peel) on practice boards by adjusting technique rather than sanding only

  • Select and wear the correct PPE for solvent-based and water-based products, and justify each item

  • Set up ventilation and containment for an indoor spray task, including masking and drop sheeting

  • Read a product data sheet and extract pot life, recoat time, and thinning ratio into a one-page card

Your checkpoint

A one-page comparison sheet of brush, roller, and spray results on identical boards, with defect photos, causes, and corrections, plus a completed PPE and ventilation checklist

Week 3

Prepare surfaces and substrates for painting & Use and maintain painting tools, equipment, and materials

  • Identify common substrates (concrete, plaster, gypsum board, wood, ferrous metal) and state the preparation each requires

  • Perform surface preparation on scrap panels: dust removal, degreasing, sanding sequence, and filling of dents

  • Mix and apply patching compound to joints and holes, then sand flush and check flatness with a straightedge

  • Test surface moisture and alkalinity on a concrete panel and interpret readings against a coating's limits

  • Clean, inspect, and store brushes, rollers, and spray equipment after a full prep-and-paint session

Your checkpoint

Three prepared substrate samples (concrete, wood, metal) with a preparation log recording steps, products, drying times, and moisture or pH readings

Week 4

Prepare and mix paints, coatings, and allied materials & Prepare surfaces and substrates for painting

  • Calculate paint quantity for a given wall area using spreading rate and number of coats

  • Mix primers, undercoats, and topcoats to the stated ratio, and record pot life and thinning limits

  • Prepare a sealed and primed surface ready for topcoat, verifying adhesion and dryness before proceeding

  • Strain a coating and demonstrate correct mixing without introducing air or lumps

  • Match a color to a supplied sample by eye and record the tint additions made

Your checkpoint

A mixing and estimation worksheet for a simulated room showing area calculations, product ratios, quantities ordered, and a color-match record

Week 5

Apply paint and coatings by brush, roller, and spray & Apply specialized finishes and decorative effects

  • Apply a full three-coat system (primer, undercoat, topcoat) to a practice wall with clean cut-in lines at ceiling and trim

  • Produce a decorative finish sample: rag-rolling, sponging, or color washing on a board, and explain the technique sequence

  • Apply a clear finish or varnish to a wood sample, sanding between coats and controlling dust

  • Mask and paint a two-color edge with a crisp line, then remove tape without lifting the film

  • Adjust spray technique to eliminate runs and dry spray on a vertical surface

Your checkpoint

One finished practice wall section with three-coat system and crisp cut-in lines, plus a decorative sample board with written step-by-step method

Week 6

Inspect, repair, and touch up finished painted surfaces & Apply safety practices and environmental protection in construction painting

  • Inspect cured surfaces under proper lighting and list defects by name, cause, and remedy

  • Repair sags, holidays, pinholes, and scratches by scraping, filling, sanding, and recoating to match texture

  • Touch up a repaired area so it blends with the surrounding finish under raking light

  • Handle and store solvents, thinners, and waste according to label instructions and site rules

  • Respond correctly to a simulated spill and a small solvent fire scenario using the right equipment

Your checkpoint

A defect inspection report on your own practice work listing at least eight defects with cause, remedy, and a before-and-after record of three successful touch-ups

Week 7

Perform housekeeping, waste disposal, and quality control documentation & Communicate effectively, work in a team, and demonstrate professional work ethics

  • Complete a daily housekeeping routine: clean tools, segregate waste, label containers, and restore the work area

  • Draft quality control documentation for a painting job: surface approval, coat log, and final inspection sign-off

  • Practice a short toolbox talk on a painting hazard, delivered clearly to a partner or recorder

  • Resolve a simulated team conflict over rework responsibility using a calm, fact-based approach

  • Explain the painter's responsibilities for client property, punctuality, and honest reporting of defects

Your checkpoint

A complete mock job file containing a QC checklist, coat log, waste disposal record, and a written reflection on one teamwork or ethics scenario

Week 8

Apply paint and coatings by brush, roller, and spray & Inspect, repair, and touch up finished painted surfaces & Perform housekeeping, waste disposal, and quality control documentation

  • Complete a timed full-cycle job: prepare, mix, apply three coats, inspect, and touch up a small area

  • Self-assess the finished job against a written checklist and score each criterion honestly

  • Review weak areas from weeks 1 to 7 and redo the two lowest-scoring practical tasks

  • Answer practice questions across all nine domains and correct every wrong answer with a written reason

  • Assemble a portfolio of practice photos, logs, and checklists ready for review

Your checkpoint

A timed end-to-end practical assessment with self-scored checklist and a portfolio binder covering all nine domains

Milestones

Week 2: Can apply a defect-free coat by brush, roller, and spray on a flat board, and can explain the cause and fix for sags, brush marks, and orange peel without notes

Week 4: Can prepare concrete, wood, and metal samples to a paintable standard and correctly calculate paint quantity and mixing ratios for a given wall area

Week 6: Can produce a three-coat finish with clean cut-in lines, one decorative sample, and a written defect report with three successful touch-ups

Week 8: Completes a timed full-cycle painting job with all QC and waste records, scores at least 80 percent on the self-assessment checklist, and answers practice questions across all nine domains with written corrections