EIM NC II study materials
EIM NC II study resources

EIM NC II flashcards

EIM NC II · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Completed communication
Communication is complete only when the receiver understands the message and confirms it. A message that is sent but not acknowledged is not yet completed.
5W1H report checklist
A reporting framework covering What happened, Who was involved, Where it occurred, When it happened, Why it happened, and How it happened or was handled.
Meeting minutes content
A record containing the date, time, attendees, agenda items, decisions made, and action items with the responsible person and deadline for each.
Active listening steps
Focus on the speaker, avoid interrupting, note key points, paraphrase what was heard to confirm understanding, then respond appropriately.
Need-to-know disclosure
Confidential or personal information is shared only with people who require it to perform their work, and never without proper consent.
Team development stages
Forming, storming, norming, performing, and adjourning. Conflict is normal during storming and is resolved through agreed ground rules.
Consensus decision meaning
All team members can support and commit to the decision even if it is not each person's first choice; it is not unanimous agreement.
Action plan elements
Each task is assigned an owner, a deadline, and a measurable output. Tasks without an owner are not tracked or completed reliably.
Constructive feedback structure
State the observation, describe its impact, and make a specific request. This keeps feedback factual and separates behavior from personal judgment.
When to escalate conflict
Escalate to a supervisor when a conflict blocks deliverables, involves safety or harassment, or breaches policy, not for routine disagreements.
Professionalism indicators
Punctuality, attendance, dress code compliance, honesty, and completion of assigned duties are the observable measures of workplace professionalism.
Career plan components
Self-assessment, target position, required competencies, training needed, timeline, and a scheduled review date for progress.
Grievance procedure order
Raise the issue with the immediate supervisor first, then human resources or the grievance committee, then file a formal written appeal.
Hierarchy of hazard control
From most to least effective: elimination, substitution, engineering controls, administrative controls, then personal protective equipment as the last defense.
Risk assessment formula
Risk equals likelihood multiplied by severity. A five-by-five matrix ranks the result as low, medium, high, or extreme.
Fire class matching
Class A ordinary combustibles, B flammable liquids, C energized electrical, D metals, K cooking oils. The extinguisher must match the class.
Emergency evacuation order
Raise the alarm, secure the area, evacuate by the nearest safe route, assemble at the muster point, and account for all personnel.
QA versus QC
Quality assurance prevents defects through process control; quality control detects defects through inspection and testing of finished output.
PDCA cycle
Plan sets targets, Do implements the plan, Check measures results against targets, Act standardizes the improvement or corrects the deviation.
Corrective versus preventive action
Corrective action removes the cause of a detected nonconformity; preventive action removes the cause of a potential nonconformity before it occurs.
Calibration requirement
Measuring instruments must read correctly within tolerance. An out-of-calibration instrument invalidates every measurement taken with it.
Standard keyboard shortcuts
Ctrl+C copy, Ctrl+X cut, Ctrl+V paste, Ctrl+Z undo, Ctrl+S save, Ctrl+P print, and Alt+Tab switches between open windows.
Save versus Save As
Save overwrites the current file in its existing format; Save As creates a new file or changes the format and location.
Malware warning signs
Unexpected slowdowns, pop-ups, unknown programs, or file corruption. Disconnect from the network and report to the administrator.
Electrical power formula
Watts equal volts multiplied by amperes. Connected load should stay within about eighty percent of the circuit breaker rating.
DMX512 key limits
DMX512 uses 5-pin cable, carries 512 channels per universe, and supports a maximum of 32 devices per daisy-chained segment without a splitter.
Balanced audio cable
Three conductors, hot, cold, and shield, reject electrical noise and allow long cable runs; unbalanced two-conductor cable is limited in distance.
Rigging load rule
Never exceed the rated capacity of truss, motors, or hardware, and fit a safety cable to every suspended fixture.
Throw ratio formula
Throw distance equals throw ratio multiplied by screen width. Use it to place a projector and size the image correctly.
AV sync tolerance
Audio and video must be aligned so lip movement matches sound; a mismatch above roughly one hundred milliseconds is noticeable.
Feedback prevention
Keep microphones behind and away from speakers, reduce gain, apply equalization, and aim speakers toward the audience.
Troubleshooting sequence
Verify power, then connection, then setting, then substitute a known-good cable or component before opening or replacing equipment.