EIM NC II study materials
EIM NC II study resources

EIM NC II: Practice occupational health and safety procedures

EIM NC II · Work through your exam, one topic at a time.

All guide sections

Practice occupational health and safety procedures

What the exam tests

This domain covers hazard identification, risk control, electrical safety, lockout/tagout, working at heights, manual handling, emergency response, and incident reporting under Philippine OSH law, principally RA 11058 and its implementing rules, DOLE Department Order 198-18.

Core rules

  • Apply the hierarchy of controls: eliminate, substitute, engineer, administrate, then PPE as the last layer.
  • Use a permit-to-work and lockout/tagout for isolation; each worker applies a personal lock.
  • Test for dead with a proven tester, and prove the tester before and after the test.
  • Provide PPE free of charge and ensure it fits: insulated gloves, arc-rated clothing, hard hat, safety shoes, fall protection.
  • Keep walkways clear, control cables, and use cable ramps or matting.
  • Inspect tools and cords; remove damaged equipment from service.
  • Report incidents and near misses; preserve the scene where required.
  • Know emergency procedures: isolation point, exits, assembly area, first aid, and contact numbers.

Worked example

Before working on a distribution board, you identify the upstream breaker, notify affected users, open the breaker, apply your lock and tag, test the outgoing terminals with a proven tester, and confirm zero voltage. Reasoning: opening the breaker alone is not isolation; another person could reclose it or a backfeed could be present.

Traps that cost marks

  • Relying on PPE alone instead of engineering controls.
  • Skipping the tester proving step.
  • Working live because "it will only take a minute."
  • Letting one person hold all the locks for a crew.
  • Ignoring housekeeping and trip hazards.

Key points

  • Apply the hierarchy of controls, with PPE last.
  • Use personal locks and tags for every isolated worker.
  • Prove the tester before and after testing for dead.
  • Remove damaged cords and tools from service.
  • Report near misses, not only injuries.