- Load moment
- Related: Load chart, Radius, Rated capacity
The product of a lifted load and its horizontal distance from the crane's slewing centre, used to compare actual loading against the rated capacity curve for a given configuration.
- Load chart
- Related: Load moment, Rated capacity, Parts of line
Manufacturer-issued table or curve showing the maximum permitted load at each radius for a specific jib length, counterweight arrangement, and hoist rope fall configuration.
- Rated capacity
- Related: Load chart, Radius, Gross load
The maximum load a crane configuration may lift at a stated radius under the manufacturer's chart, before any deductions for lifting attachments or site-specific derating.
- Radius
- Related: Load moment, Rated capacity
The horizontal distance from the crane's slewing centre to the centre of gravity of the suspended load, measured with the jib positioned as it will be during the lift.
- Gross load
- Related: Net load, Rated capacity
The total suspended mass comprising the payload plus hook block, slings, spreaders, and any other rigging below the rope, all of which must be deducted from chart capacity.
- Net load
- Related: Gross load
The mass of the actual material or component being lifted, excluding hooks, slings, and other below-the-hook equipment that count toward gross load.
- Parts of line
- Related: Load chart, Hook block
The number of rope falls supporting the load between the hook block and the trolley or jib head, which determines the hoist capacity and line speed available.
- Lifting plan
- Related: Critical lift, Rigging study, Exclusion zone
A documented method statement that defines the load, crane position, radii, rigging, personnel roles, sequence of operations, exclusion zones, and contingency measures for a specific lift.
- Critical lift
- Related: Lifting plan, Tandem lift
A lift that exceeds a defined threshold such as a percentage of chart capacity, involves multiple cranes, lifts personnel, or carries unusual risk, requiring a higher level of planning and approval.
- Tandem lift
- Related: Critical lift, Lift supervisor
A coordinated lift using two or more cranes on the same load, requiring a shared plan, defined load share per crane, and continuous communication between operators and the lift supervisor.
- Sling angle factor
- Related: Sling, Shackle
A multiplier applied to a load's weight to account for the increased tension in sling legs as the angle between the legs and the horizontal decreases.
- Sling
- Related: Sling angle factor, Working load limit, Shackle
A flexible assembly of wire rope, chain, or synthetic webbing used to connect the load to the hook, selected for its working load limit and the hitch used.
- Shackle
- Related: Sling, Rigging hardware
A U-shaped connector closed by a pin or bolt, used to join slings to hooks, eyes, or lifting points; the pin must be fully seated and moused where required.
- Working load limit
- Related: Sling, Rigging hardware, Proof load
The maximum mass or force a rigging component is rated to withstand in a specified configuration, marked on the item and never exceeded during a lift.
- Rigging hardware
- Related: Shackle, Working load limit
The collective term for shackles, hooks, swivels, turnbuckles, and master links used to assemble a lifting arrangement, each requiring inspection before use.
- Centre of gravity
- Related: Load balance, Tag line
The point at which the total weight of an object acts; if it is not directly below the hook, the load will tilt, so lifting points must be chosen to keep it controlled.
- Load balance
- Related: Centre of gravity, Sling angle factor
The condition in which a suspended load hangs level because the lifting points and sling lengths are arranged symmetrically about the load's centre of gravity.
- Tag line
- Related: Load balance, Exclusion zone
A rope attached to a load and controlled by a person on the ground to restrain rotation and sway, keeping the load clear of structures and personnel during the lift.
- Hook block
- Related: Parts of line, Anti-two-block
The assembly of sheaves, frame, and hook that travels on the hoist rope; its weight forms part of the gross load and it must be inspected for sheave and latch condition.
- Anti-two-block
- Related: Hook block, Limit switch
A safety device that detects when the hook block approaches the trolley or jib head too closely and stops the hoist motion to prevent rope and component damage.
- Slew limit
- Related: Slewing, Exclusion zone
A configured restriction on the crane's slewing arc, used to keep the jib and load clear of adjacent structures, power lines, or other cranes on site.
- Slewing
- Related: Slew limit, Load moment
The rotating motion of the crane's upper structure about its vertical axis, controlled by the operator and subject to braking and free-slew considerations when handling loads.
- Exclusion zone
- Related: Tag line, Lifting plan
A marked ground area beneath and around the lifting operation where unauthorised people are prohibited, sized to account for the load, its swing, and foreseeable failure.
- Slew radius
- Related: Radius, Slewing
The horizontal reach of the jib from the slewing centre at a given trolley position, which together with the load determines the load moment the crane must resist.
- Outrigger
- Related: Ground bearing pressure, Foundation
A retractable or fixed beam that extends a crane's support base to the ground, increasing stability and reducing ground bearing pressure during lifting.
- Ground bearing pressure
- Related: Outrigger, Foundation
The load per unit area transmitted through crane supports to the ground, which must be checked against soil capacity and reduced using mats or pads where needed.
- Foundation
- Related: Ground bearing pressure, Anchor bolt
The engineered base, such as a reinforced concrete footing or ballasted raft, that supports a tower crane and transfers its loads safely into the ground.
- Anchor bolt
- Related: Foundation, Mast section
A threaded steel fastener embedded in the crane foundation or mast base to secure the structure against uplift and overturning forces, tightened to a specified torque.
- Mast section
- Related: Anchor bolt, Climbing
A prefabricated lattice or tubular segment of the tower crane's vertical mast, bolted or pinned together to build the crane to its required freestanding or tied height.
- Climbing
- Related: Mast section, Wind speed limit
The process of raising a tower crane's working height by adding mast sections or using a climbing frame, carried out under a documented procedure with wind limits.
- Tie-in
- Related: Mast section, Climbing
A structural connection between the crane mast and a building or other support that provides lateral restraint at defined heights, installed to the manufacturer's specification.
- Counterweight
- Related: Load moment, Rated capacity
Ballast mounted at the rear of the jib to balance the load moment; its quantity and position must match the load chart used for the lift.
- Pre-operation inspection
- Related: Limit switch, Anti-two-block
The documented check of crane structure, ropes, brakes, limit devices, and safety systems carried out before the first lift of a shift or after any significant event.
- Limit switch
- Related: Anti-two-block, Pre-operation inspection
A device that automatically stops a crane motion at a preset travel point, such as maximum hoist height or trolley travel, and must be tested before work begins.
- Wind speed limit
- Related: Climbing, Weather monitoring
The maximum wind speed at which lifting, climbing, or erecting may proceed, defined by the manufacturer and monitored on site with an anemometer.
- Weather monitoring
- Related: Wind speed limit
The practice of tracking wind speed and direction, lightning, and visibility during operations, with defined actions to suspend work when conditions exceed limits.
- Rigger signalperson
- Related: Hand signal, Stop signal, Lift supervisor
A qualified worker who directs the crane operator using standard hand, voice, or radio signals and who has authority to stop the lift when conditions become unsafe.
- Hand signal
- Related: Rigger signalperson, Stop signal
A standardised arm and hand movement used to command crane motions such as hoist, lower, slew, and trolley, understood identically by operator and signalperson.
- Stop signal
- Related: Hand signal, Rigger signalperson
A single emergency command, given by anyone on site regardless of role, that requires the operator to halt all crane motion immediately and hold position.
- Lift supervisor
- Related: Lifting plan, Rigger signalperson
The competent person responsible for planning and controlling a lifting operation, confirming rigging, briefing the team, and authorising the lift to proceed.
- Toolbox talk
- Related: Lifting plan, Lift supervisor
A short pre-task briefing covering the method, hazards, roles, and emergency arrangements for the day's work, recorded and attended by all involved personnel.
- Lockout/tagout
- Related: Pre-operation inspection, Shutdown procedure
The procedure of isolating energy sources, applying a personal lock and tag, and verifying zero energy before maintenance or repair work on crane systems.
- Shutdown procedure
- Related: Lockout/tagout, Storm lock
The defined sequence for parking the crane, lowering and securing the hook, applying brakes and storm locks, and recording the machine's condition at the end of a shift.
- Storm lock
- Related: Shutdown procedure, Wind speed limit
A mechanical device that pins the slewing mechanism in the parked position to prevent uncontrolled rotation in high winds when the crane is left unattended.
- Wire rope inspection
- Related: Pre-operation inspection, Proof load
The examination of hoist and pendant ropes for broken wires, corrosion, kinks, and diameter reduction against rejection criteria before and during use.
- Proof load
- Related: Working load limit, Wire rope inspection
A test load applied to lifting equipment or a crane structure to verify strength and integrity, typically exceeding the rated capacity by a defined factor.
- Rigging study
- Related: Lifting plan, Sling angle factor
A drawing or calculation showing sling lengths, angles, hardware, and lifting points for a specific load, used to confirm the arrangement is within component limits.
- Personal protective equipment
- Related: Exclusion zone, Permit to work
Mandatory safety gear such as a hard hat, safety footwear, high-visibility clothing, gloves, and fall protection worn by everyone in the crane operating area.
- Permit to work
- Related: Lifting plan, Lockout/tagout
A formal written authorisation that defines the scope, hazards, controls, and validity period for higher-risk activities such as crane erection, climbing, or maintenance.
- Competent person
- Related: Lift supervisor, Permit to work
A person who has the training, experience, and authority to identify hazards and take corrective action in the task assigned, as required by workplace safety regulations.
- Risk assessment
- Related: Lifting plan, Permit to work
A structured evaluation of hazards and their likelihood and severity, used to select controls before lifting, erection, or maintenance work begins.
- Incident reporting
- Related: Risk assessment, Pre-operation inspection
The documented notification of near misses, equipment damage, or injuries to the responsible person, enabling investigation and correction of the underlying cause.