HEO Tower Crane NC III study materials
HEO Tower Crane NC III study resources

HEO Tower Crane NC III key terms

HEO Tower Crane NC III · Get comfortable with the vocabulary.

Load moment

The product of a lifted load and its horizontal distance from the crane's slewing centre, used to compare actual loading against the rated capacity curve for a given configuration.

Related: Load chart, Radius, Rated capacity
Load chart

Manufacturer-issued table or curve showing the maximum permitted load at each radius for a specific jib length, counterweight arrangement, and hoist rope fall configuration.

Related: Load moment, Rated capacity, Parts of line
Rated capacity

The maximum load a crane configuration may lift at a stated radius under the manufacturer's chart, before any deductions for lifting attachments or site-specific derating.

Related: Load chart, Radius, Gross load
Radius

The horizontal distance from the crane's slewing centre to the centre of gravity of the suspended load, measured with the jib positioned as it will be during the lift.

Related: Load moment, Rated capacity
Gross load

The total suspended mass comprising the payload plus hook block, slings, spreaders, and any other rigging below the rope, all of which must be deducted from chart capacity.

Related: Net load, Rated capacity
Net load

The mass of the actual material or component being lifted, excluding hooks, slings, and other below-the-hook equipment that count toward gross load.

Related: Gross load
Parts of line

The number of rope falls supporting the load between the hook block and the trolley or jib head, which determines the hoist capacity and line speed available.

Related: Load chart, Hook block
Lifting plan

A documented method statement that defines the load, crane position, radii, rigging, personnel roles, sequence of operations, exclusion zones, and contingency measures for a specific lift.

Related: Critical lift, Rigging study, Exclusion zone
Critical lift

A lift that exceeds a defined threshold such as a percentage of chart capacity, involves multiple cranes, lifts personnel, or carries unusual risk, requiring a higher level of planning and approval.

Related: Lifting plan, Tandem lift
Tandem lift

A coordinated lift using two or more cranes on the same load, requiring a shared plan, defined load share per crane, and continuous communication between operators and the lift supervisor.

Related: Critical lift, Lift supervisor
Sling angle factor

A multiplier applied to a load's weight to account for the increased tension in sling legs as the angle between the legs and the horizontal decreases.

Related: Sling, Shackle
Sling

A flexible assembly of wire rope, chain, or synthetic webbing used to connect the load to the hook, selected for its working load limit and the hitch used.

Related: Sling angle factor, Working load limit, Shackle
Shackle

A U-shaped connector closed by a pin or bolt, used to join slings to hooks, eyes, or lifting points; the pin must be fully seated and moused where required.

Related: Sling, Rigging hardware
Working load limit

The maximum mass or force a rigging component is rated to withstand in a specified configuration, marked on the item and never exceeded during a lift.

Related: Sling, Rigging hardware, Proof load
Rigging hardware

The collective term for shackles, hooks, swivels, turnbuckles, and master links used to assemble a lifting arrangement, each requiring inspection before use.

Related: Shackle, Working load limit
Centre of gravity

The point at which the total weight of an object acts; if it is not directly below the hook, the load will tilt, so lifting points must be chosen to keep it controlled.

Related: Load balance, Tag line
Load balance

The condition in which a suspended load hangs level because the lifting points and sling lengths are arranged symmetrically about the load's centre of gravity.

Related: Centre of gravity, Sling angle factor
Tag line

A rope attached to a load and controlled by a person on the ground to restrain rotation and sway, keeping the load clear of structures and personnel during the lift.

Related: Load balance, Exclusion zone
Hook block

The assembly of sheaves, frame, and hook that travels on the hoist rope; its weight forms part of the gross load and it must be inspected for sheave and latch condition.

Related: Parts of line, Anti-two-block
Anti-two-block

A safety device that detects when the hook block approaches the trolley or jib head too closely and stops the hoist motion to prevent rope and component damage.

Related: Hook block, Limit switch
Slew limit

A configured restriction on the crane's slewing arc, used to keep the jib and load clear of adjacent structures, power lines, or other cranes on site.

Related: Slewing, Exclusion zone
Slewing

The rotating motion of the crane's upper structure about its vertical axis, controlled by the operator and subject to braking and free-slew considerations when handling loads.

Related: Slew limit, Load moment
Exclusion zone

A marked ground area beneath and around the lifting operation where unauthorised people are prohibited, sized to account for the load, its swing, and foreseeable failure.

Related: Tag line, Lifting plan
Slew radius

The horizontal reach of the jib from the slewing centre at a given trolley position, which together with the load determines the load moment the crane must resist.

Related: Radius, Slewing
Outrigger

A retractable or fixed beam that extends a crane's support base to the ground, increasing stability and reducing ground bearing pressure during lifting.

Related: Ground bearing pressure, Foundation
Ground bearing pressure

The load per unit area transmitted through crane supports to the ground, which must be checked against soil capacity and reduced using mats or pads where needed.

Related: Outrigger, Foundation
Foundation

The engineered base, such as a reinforced concrete footing or ballasted raft, that supports a tower crane and transfers its loads safely into the ground.

Related: Ground bearing pressure, Anchor bolt
Anchor bolt

A threaded steel fastener embedded in the crane foundation or mast base to secure the structure against uplift and overturning forces, tightened to a specified torque.

Related: Foundation, Mast section
Mast section

A prefabricated lattice or tubular segment of the tower crane's vertical mast, bolted or pinned together to build the crane to its required freestanding or tied height.

Related: Anchor bolt, Climbing
Climbing

The process of raising a tower crane's working height by adding mast sections or using a climbing frame, carried out under a documented procedure with wind limits.

Related: Mast section, Wind speed limit
Tie-in

A structural connection between the crane mast and a building or other support that provides lateral restraint at defined heights, installed to the manufacturer's specification.

Related: Mast section, Climbing
Counterweight

Ballast mounted at the rear of the jib to balance the load moment; its quantity and position must match the load chart used for the lift.

Related: Load moment, Rated capacity
Pre-operation inspection

The documented check of crane structure, ropes, brakes, limit devices, and safety systems carried out before the first lift of a shift or after any significant event.

Related: Limit switch, Anti-two-block
Limit switch

A device that automatically stops a crane motion at a preset travel point, such as maximum hoist height or trolley travel, and must be tested before work begins.

Related: Anti-two-block, Pre-operation inspection
Wind speed limit

The maximum wind speed at which lifting, climbing, or erecting may proceed, defined by the manufacturer and monitored on site with an anemometer.

Related: Climbing, Weather monitoring
Weather monitoring

The practice of tracking wind speed and direction, lightning, and visibility during operations, with defined actions to suspend work when conditions exceed limits.

Related: Wind speed limit
Rigger signalperson

A qualified worker who directs the crane operator using standard hand, voice, or radio signals and who has authority to stop the lift when conditions become unsafe.

Related: Hand signal, Stop signal, Lift supervisor
Hand signal

A standardised arm and hand movement used to command crane motions such as hoist, lower, slew, and trolley, understood identically by operator and signalperson.

Related: Rigger signalperson, Stop signal
Stop signal

A single emergency command, given by anyone on site regardless of role, that requires the operator to halt all crane motion immediately and hold position.

Related: Hand signal, Rigger signalperson
Lift supervisor

The competent person responsible for planning and controlling a lifting operation, confirming rigging, briefing the team, and authorising the lift to proceed.

Related: Lifting plan, Rigger signalperson
Toolbox talk

A short pre-task briefing covering the method, hazards, roles, and emergency arrangements for the day's work, recorded and attended by all involved personnel.

Related: Lifting plan, Lift supervisor
Lockout/tagout

The procedure of isolating energy sources, applying a personal lock and tag, and verifying zero energy before maintenance or repair work on crane systems.

Related: Pre-operation inspection, Shutdown procedure
Shutdown procedure

The defined sequence for parking the crane, lowering and securing the hook, applying brakes and storm locks, and recording the machine's condition at the end of a shift.

Related: Lockout/tagout, Storm lock
Storm lock

A mechanical device that pins the slewing mechanism in the parked position to prevent uncontrolled rotation in high winds when the crane is left unattended.

Related: Shutdown procedure, Wind speed limit
Wire rope inspection

The examination of hoist and pendant ropes for broken wires, corrosion, kinks, and diameter reduction against rejection criteria before and during use.

Related: Pre-operation inspection, Proof load
Proof load

A test load applied to lifting equipment or a crane structure to verify strength and integrity, typically exceeding the rated capacity by a defined factor.

Related: Working load limit, Wire rope inspection
Rigging study

A drawing or calculation showing sling lengths, angles, hardware, and lifting points for a specific load, used to confirm the arrangement is within component limits.

Related: Lifting plan, Sling angle factor
Personal protective equipment

Mandatory safety gear such as a hard hat, safety footwear, high-visibility clothing, gloves, and fall protection worn by everyone in the crane operating area.

Related: Exclusion zone, Permit to work
Permit to work

A formal written authorisation that defines the scope, hazards, controls, and validity period for higher-risk activities such as crane erection, climbing, or maintenance.

Related: Lifting plan, Lockout/tagout
Competent person

A person who has the training, experience, and authority to identify hazards and take corrective action in the task assigned, as required by workplace safety regulations.

Related: Lift supervisor, Permit to work
Risk assessment

A structured evaluation of hazards and their likelihood and severity, used to select controls before lifting, erection, or maintenance work begins.

Related: Lifting plan, Permit to work
Incident reporting

The documented notification of near misses, equipment damage, or injuries to the responsible person, enabling investigation and correction of the underlying cause.

Related: Risk assessment, Pre-operation inspection