Schedule Strategy

  • The schedule strategy defines the scheduling approach, method, tool, team roles, and governance before schedule model development.

  • Scheduling method selection considers project size, complexity, contractual requirements, stakeholder needs, and organizational standards.

  • A schedule model combines the scheduling method, scheduling tool, and schedule data to produce a dynamic project schedule.

  • Rolling wave planning elaborates near-term activities in detail while future work remains at a higher summary level.

  • The schedule management plan defines units, formats, thresholds, control accounts, performance measurement rules, and reporting requirements.

  • The schedule baseline is the approved schedule version used for performance comparison and changes only through integrated change control.

  • Milestones have zero duration and mark significant events, deliverables, phase gates, or contractual dates; they are not work activities.

  • Schedule governance defines variance thresholds, review cadence, approval authority, and escalation rules for schedule changes.

Quick reference

Schedule Planning and Development

  • WBS decomposition creates work packages that are further decomposed into schedule activities with attributes, durations, and dependencies.

  • Precedence Diagramming Method uses nodes for activities and arrows for logical relationships; it supports FS, SS, FF, and SF dependencies.

  • Finish-to-Start is the most common dependency; leads accelerate a successor and lags delay a successor.

  • Total float = LS - ES = LF - EF; free float = ES of successor - EF of activity.

  • The critical path is the longest path through the network and determines the shortest project duration; its total float is typically zero.

  • Triangular three-point estimate = (O + M + P) / 3; PERT estimate = (O + 4M + P) / 6; PERT standard deviation = (P - O) / 6.

  • Resource leveling resolves over-allocation and may extend the critical path; resource smoothing uses available float without extending the project finish.

  • Crashing adds resources or cost to shorten duration; fast tracking overlaps activities and increases risk.

  • Calendars define working time, shifts, holidays, and nonworking periods used to calculate activity dates and durations.

Quick reference

Schedule Monitoring and Controlling

  • SV = EV - PV; negative SV indicates behind schedule. SPI = EV / PV; SPI below 1.0 indicates slower than planned progress.

  • CV = EV - AC; CPI = EV / AC; cost performance is separate from schedule performance but both inform forecasts.

  • Earned schedule: ES is the point on the PV curve matching current EV; SV(t) = ES - actual time; SPI(t) = ES / actual time.

  • Negative total float indicates the project cannot meet a constraint or required date without schedule change or corrective action.

  • Near-critical paths have low total float and can become critical after small delays; monitor float consumption, not only the critical path.

  • Progress updates record actual start and finish dates, remaining duration, percent complete, and revised forecasts against the baseline.

  • Corrective actions include crashing, fast tracking, resequencing, resource reassignment, and scope change through integrated change control.

  • Trend analysis compares schedule performance across periods; what-if analysis models alternative durations, resources, or constraints.

  • Schedule change control reviews and approves baseline changes and is integrated with scope and cost change control.

Quick reference

Schedule Closeout

  • Schedule closeout verifies all activities and deliverables are complete, residual float is documented, and control accounts are closed.

  • The as-built schedule records actual start and finish dates, durations, sequence, and resource use for final comparison.

  • Final schedule variance compares the approved baseline with the as-built schedule to evaluate delivery performance.

  • Schedule closeout archives the schedule model, baselines, reports, and change records with version control and retention rules.

  • Lessons learned capture schedule planning and control successes, failures, root causes, and recommendations for future projects.

  • Organizational process assets are updated with historical durations, productivity data, templates, and schedule lessons learned.

  • Resource release, contract closure, and transition to operations are coordinated with schedule closeout.

  • Post-project schedule reviews document risks, issues, assumptions, and forecast accuracy for organizational learning.

Quick reference

Stakeholder Communications Management

  • The communication management plan defines stakeholders, information needs, formats, frequency, methods, and escalation paths for schedule reporting.

  • The stakeholder register records roles, interests, influence, and communication needs used to tailor schedule reports.

  • Push communication sends reports by email or portal; pull communication lets stakeholders access schedule data; interactive communication supports dialogue.

  • Executive schedule reports summarize milestones, critical path status, forecast completion, and major variances; detailed reports include activity data.

  • RACI charts clarify who is responsible, accountable, consulted, and informed for schedule updates and approvals.

  • Schedule review meetings document progress, variances, forecasts, risks, corrective actions, decisions, and action owners.

  • Escalation thresholds define when schedule issues move to higher authority for resolution.

  • Communication cadence and reporting formats are adjusted for stakeholder influence, impact, and information needs.