RETA CIRO · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Industrial Refrigeration I

  • Define pressure, temperature, heat, and latent/sensible heat in your own words and give one plant example of each

  • Convert between psig and psia and look up ammonia saturation temperatures for at least ten pressures without a chart error

  • Sketch the four basic stages of the refrigeration cycle and label the state of the refrigerant entering and leaving each component

  • Identify the function of the compressor, condenser, expansion device, and evaporator and state what happens to pressure and enthalpy across each

Your checkpoint

Hand-drawn pressure-enthalpy diagram of a single-stage ammonia cycle with all state points labeled, plus a 10-item psig/psia and saturation-temperature conversion worksheet scored at 90% or better

Week 2

Industrial Refrigeration I & Industrial Refrigeration II (Systems)

  • Compare reciprocating, screw, and rotary vane compressors on capacity control method and typical industrial application

  • Explain the purpose of the intercooler, oil separator, receiver, accumulator, and purger and state where each sits in the flow path

  • Trace refrigerant flow through a two-stage compression system from evaporator back to evaporator, naming every vessel and valve in order

  • Describe how compressor capacity is reduced and what happens to suction and discharge pressures when it is

Your checkpoint

A fully labeled two-stage system flow diagram with a written walk-through of refrigerant path and a one-page comparison of compressor types

Week 3

Industrial Refrigeration II (Systems)

  • Distinguish direct-expansion, gravity-flooded, and pumped-recirculated feed methods by refrigerant charge, coil performance, and common use case

  • Describe the sequence and purpose of hot-gas, water, and electric defrost and state which is used in which application

  • Explain how evaporative condensers reject heat and list the water-treatment and freeze-protection checks they require

  • Describe the operating role of high-side floats, low-side floats, hand expansion valves, and thermostatic expansion valves in an industrial plant

Your checkpoint

A three-column comparison table of liquid-feed methods judged against coil performance, refrigerant charge, and maintenance burden, with a one-paragraph recommendation for a freezer application

Week 4

Industrial Refrigeration IV (Plant Operation and Safety)

  • List the PPE required for ammonia work and state the exposure threshold at which you must evacuate versus wear respiratory protection

  • Sequence the response to an ammonia release from detection through notification, isolation, evacuation, and re-entry

  • Apply lockout/tagout and permit-to-work steps to a pump repair scenario, naming each energy source to be isolated

  • Write the normal startup and normal shutdown sequence for a compressor and state the readings you verify at each step

  • Identify the logs, rounds, and recordkeeping items an operator is responsible for during a shift

Your checkpoint

A written ammonia-release response checklist and a compressor startup/shutdown sequence card, self-quizzed with a 20-question set at 80% or higher

Week 5

Industrial Refrigeration IV (Plant Operation and Safety) & Basic Electricity I

  • Describe safe handling of oil draining, hot work, and confined-space entry in a machinery room and name the permit each requires

  • Solve Ohm's law problems for voltage, current, and resistance and apply them to a motor circuit

  • Calculate total resistance and current in series and parallel circuits and explain why parallel is used for plant loads

  • Demonstrate correct use of a multimeter to measure voltage, current, and resistance, including where the meter is placed in each case

Your checkpoint

A worked problem set of 15 Ohm's law and series/parallel calculations with a one-page summary of the safety permits required for three plant tasks

Week 6

Basic Electricity I & Basic Electricity II (Ladder Diagrams)

  • Read common electrical symbols for contacts, coils, switches, overloads, and timers and match each to its ladder-diagram symbol

  • Trace a motor starter circuit from control transformer through stop, start, seal-in contact, and overload to the coil

  • Explain the difference between a line and a control circuit and state the typical control voltage and where it comes from

  • Troubleshoot a non-starting motor by listing the test points to check in order, from power supply to coil

Your checkpoint

Hand-drawn ladder diagram of a start/stop station with seal-in and overload protection, plus a numbered troubleshooting checklist for a motor that will not start

Week 7

Basic Electricity II (Ladder Diagrams) & Industrial Refrigeration I

  • Draw a ladder diagram for a pump-down or defrost control cycle and explain each rung in one sentence

  • Diagnose three given control-circuit faults by describing the symptom and the test that isolates the cause

  • Re-derive the refrigeration cycle from memory and connect each safety control to the part of the cycle it protects

  • Explain how a high-pressure cutout, low-pressure cutout, and oil-pressure safety switch each act on the compressor control circuit

Your checkpoint

Two original ladder diagrams (pump-down and defrost) with a written explanation of every rung and a fault-isolation table for three scenarios

Week 8

Industrial Refrigeration I & Industrial Refrigeration II (Systems) & Industrial Refrigeration IV (Plant Operation and Safety) & Basic Electricity I & Basic Electricity II (Ladder Diagrams)

  • Complete a timed 60-question mixed practice set covering all five domains and review every missed item to root cause

  • Re-state the key formulas, safety thresholds, and control sequences from memory in a single reference sheet

  • Re-work the weakest two topics identified by practice scores until you can explain them aloud without notes

  • Walk through a full plant scenario from startup to a simulated alarm and justify each operator action

Your checkpoint

A one-page personal formula and safety reference sheet written from memory, plus a practice exam log showing 80% or higher overall and no domain below 70%

Milestones

Week 2: Draw the two-stage system flow diagram from blank paper in under 15 minutes with all vessels and valves correctly placed

Week 4: Pass a 20-question safety and plant-operation quiz at 80% or higher and recite the ammonia release response sequence aloud without notes

Week 6: Trace a start/stop ladder circuit and name every component and its function within 10 minutes with no reference material

Week 8: Score 80% or higher on the timed 60-question mixed practice set, with every domain at or above 70%