SAFe SSM · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Three pillars of empiricism
Scrum's empirical foundation: transparency makes work and results visible, inspection checks progress toward goals, and adaptation adjusts process or product when results deviate.
Scrum values
Commitment, focus, openness, respect, and courage. In SAFe these values underpin team self-management and the Lean-Agile mindset.
Iteration in SAFe
SAFe's term for the Scrum Sprint: a fixed-length timebox, typically two weeks, in which the team delivers a working, tested increment.
Scrum artifacts
Product Backlog, Sprint Backlog, and Increment. Each carries a commitment: the Product Goal, the Sprint Goal, and the Definition of Done respectively.
Scrum events
The Sprint container, Sprint Planning, Daily Scrum, Sprint Review, and Sprint Retrospective. SAFe complements the review with an iteration demo and an ART-level System Demo.
Servant leader
The Scrum Master's stance: serving the team through impediment removal, coaching, and enabling self-management, rather than directing or assigning work.
Scrum Master process authority
The SM owns how Scrum is applied, teaching and upholding the framework's rules, while the team owns its technical and delivery decisions.
Impediment escalation path
Team-level blockers are handled by the Scrum Master; blockers beyond team authority are escalated to the RTE or STE for ART-level resolution.
Coaching stance
The Scrum Master favors questions, observation, and feedback over instruction, moving between teaching, coaching, mentoring, and facilitating as the team matures.
SM support to Product Owner
The Scrum Master helps the Product Owner by facilitating backlog refinement, story splitting, and PI objective definition without taking over product decisions.
Scrum Master Community of Practice
A self-organizing group of Scrum Masters and team coaches in the ART who share patterns, tools, and improvement ideas to raise overall flow.
PI Planning duration
A two-day event at the start of each Program Increment where all ART teams align on a shared mission and draft iteration-by-iteration plans.
PI Objectives
SMART statements describing what a team intends to deliver in the Program Increment; Business Owners assign each objective a business value from 1 to 10.
Committed versus uncommitted objectives
Committed objectives are what the team will deliver; uncommitted or stretch objectives are aspirational and excluded from predictability calculations.
ROAM
A risk-handling technique used in PI Planning: each risk is Resolved, Owned, Accepted, or Mitigated, with a named owner and follow-up action.
Confidence vote
A fist-of-five poll at the end of PI Planning; a team average of three or more allows the plan to proceed, while lower scores trigger replanning.
ART planning board
The visual board of team objectives, features, and cross-team dependencies arranged by iteration across the PI; it was formerly called the program board.
Iteration Goal
A single sentence describing the business value the team intends to deliver in the iteration; it guides story selection during Iteration Planning.
Daily Stand-up
A 15-minute event at the same time and place where team members inspect progress toward the Iteration Goal and surface impediments; it is not a status report.
WIP limits
Explicit caps on work in each Kanban column that expose bottlenecks and force the team to finish existing work before starting new items.
Iteration Review
A team-level demonstration of the working increment to stakeholders, combined with a review of metrics and adjustment of the team backlog.
Predictability measure
Actual business value delivered divided by planned business value for a Program Increment; it is calculated at PI level, not per iteration.
Built-in quality
Embedding quality in every increment through XP techniques such as continuous integration, test-driven development, refactoring, and an up-to-date Definition of Done.
Inspect and Adapt
The final event of the PI, combining a PI System Demo, quantitative measurement, and a problem-solving workshop that produces improvement backlog items.
PI System Demo
An ART-level integrated demonstration at the end of the Program Increment where stakeholders assess whether the solution met the PI objectives.
Problem-solving workshop
The I&A segment where the ART root-causes its biggest issues using techniques such as 5 Whys or fishbone, then creates owned improvement backlog items.
Planned versus actual business value
At Inspect & Adapt, the business value a team planned is compared with what it delivered, feeding ART predictability and next-PI capacity.
Improvement backlog
A prioritized list of actions from the I&A workshop; items carry owners, may be planned into the next PI, and are tracked by the RTE.
AI as co-pilot
AI drafts agendas, summaries, and retrospective themes to save the Scrum Master time, but a human reviews, decides, and stays accountable for outcomes.
Prompt structure
A well-formed prompt states role, context, constraints, desired output format, and examples; specificity directly drives the usefulness of the result.
AI hallucination risk
Generative AI can produce plausible but false content, so every AI-generated summary, metric, or recommendation must be verified before use.
Responsible AI in SAFe
Transparency, accountability, privacy, and fairness govern AI use, and no sensitive customer data or intellectual property goes into unapproved tools.