Agile Team

A small, cross-functional group of typically five to eleven people who define, build, test, and deliver value in short iterations; in SAFe, the team is the basic building block of an Agile Release Train.

Related: Agile Release Train (ART), Iteration
Agile Release Train (ART)

A long-lived team of Agile teams, usually 50 to 125 people, that plans, commits, and delivers together on a shared cadence to produce integrated value for a value stream.

Related: Program Increment (PI), PI Planning
Program Increment (PI)

A fixed timebox, usually eight to twelve weeks, during which an Agile Release Train delivers a set of planned features and enablers; it contains several iterations plus an Innovation and Planning iteration.

Related: PI Planning, Innovation and Planning (IP) Iteration
Iteration

A short, fixed timebox, typically two weeks, in which an Agile team plans, builds, tests, and demonstrates a small increment of value, ending with a review and a retrospective.

Related: Iteration Planning, Agile Team
Cadence and Synchronization

Cadence gives teams a regular rhythm of events and deliverables; synchronization makes multiple teams in an ART plan, integrate, and demonstrate on the same schedule so dependencies surface early.

Related: PI Planning, Agile Release Train (ART)
Built-in Quality

The practice of building quality into every step rather than inspecting it in at the end, using standards, test automation, and technical practices that keep the solution releasable at all times.

Related: Definition of Done, Iteration
Lean-Agile Principles

The ten SAFe principles, such as taking an economic view, applying systems thinking, assuming variability, and decentralizing decision-making, that guide behaviors and choices across the organization.

Related: Built-in Quality, Cadence and Synchronization
Three Pillars of Empiricism

Transparency, inspection, and adaptation: the Scrum foundation holding that work must be visible, regularly examined, and adjusted when it drifts, so decisions rest on observed reality.

Related: Iteration Review, Iteration Retrospective
Team Backlog

The team's list of work to do, including stories, enablers, and other items derived from the ART's features and refined by the team into small, estimable pieces.

Related: Backlog Refinement, Feature
Scrum Master

The SAFe team role accountable for the team's effectiveness: facilitating events, coaching the team and the Product Owner, removing impediments, and fostering a culture of continuous improvement.

Related: Servant Leader, Impediment
Servant Leader

A leadership stance in which the Scrum Master puts the team's needs first, listening, supporting growth, and removing obstacles, rather than directing or controlling the work itself.

Related: Scrum Master, Self-Managing Team
Impediment

Anything blocking the team's progress or reducing its effectiveness, such as a missing skill, a broken environment, or an unresolved dependency, which the Scrum Master helps surface, track, and remove.

Related: Scrum Master, Daily Stand-up
Release Train Engineer (RTE)

The servant leader and chief Scrum Master for the Agile Release Train, facilitating ART events such as PI Planning and Inspect and Adapt and helping teams manage cross-team dependencies.

Related: PI Planning, Inspect and Adapt (I&A)
Product Owner

The team member accountable for defining and prioritizing the Team Backlog, clarifying stories, and ensuring the team builds what delivers the most value.

Related: Team Backlog, Iteration Planning
Self-Managing Team

A team that owns how it does its work, including planning, estimating, assigning tasks, and improving its process, while leaders set direction and guardrails instead of giving instructions.

Related: Servant Leader, Iteration Planning
PI Planning

A regular, usually two-day, in-person or virtual event where all ART teams align on a shared mission, agree on dependencies, and produce team PI Objectives and a draft plan.

Related: PI Objectives, Program Board, Draft PI Plan
PI Objectives

A summary of the business and technical outcomes a team intends to achieve in the coming PI, stated in plain language and scored for business value to guide decisions.

Related: PI Planning, Confidence Vote
Program Board

A visual planning aid used during PI Planning that shows features by team and iteration along with the dependencies and milestones that must be managed across the ART.

Related: PI Planning, Draft PI Plan
Draft PI Plan

The preliminary set of team objectives, features, and dependencies captured during PI Planning and refined in breakout sessions before the final plan review.

Related: PI Planning, PI Objectives
Confidence Vote

A quick, typically fist-of-five poll taken at the end of PI Planning to show how confident each team is in delivering its plan, prompting discussion when confidence is low.

Related: PI Planning, Management Review and Problem Solving
Management Review and Problem Solving

A session during PI Planning where management and stakeholders review the draft plans, resolve cross-team issues and resource constraints, and adjust scope so the ART can commit.

Related: PI Planning, Confidence Vote
Feature

A service or capability that delivers value to the customer, sized to be completed by one team within a PI and broken down into stories for the team's backlog.

Related: Team Backlog, PI Objectives
Iteration Planning

A team event at the start of an iteration where the team selects backlog items, agrees on iteration goals, and defines the work needed to deliver them.

Related: Iteration Goals, Team Backlog
Iteration Goals

A short set of outcomes the team commits to for the current iteration, summarizing the value of the selected backlog items and helping the team keep focus and alignment.

Related: Iteration Planning, Iteration Review
Daily Stand-up

A brief daily team event to inspect progress toward the iteration goals, re-plan the day's work, and surface impediments and dependencies.

Related: Impediment, Iteration Goals
Iteration Review

An end-of-iteration event where the team demonstrates the working increment to stakeholders, inspects results against the iteration goals, and adapts the backlog.

Related: System Demo, Iteration Retrospective
Iteration Retrospective

A team event at the end of each iteration to reflect on how the team worked, identify improvement actions, and track progress on actions from earlier retrospectives.

Related: Inspect and Adapt (I&A), Problem-Solving Workshop
System Demo

A regularly scheduled demonstration of the integrated work of all teams in the ART, giving stakeholders a view of the whole solution as it evolves across the PI.

Related: Iteration Review, PI Objectives
Backlog Refinement

The ongoing practice of reviewing, splitting, and clarifying backlog items so they are small, understood, and ready to be pulled into an upcoming iteration.

Related: Team Backlog, Definition of Done
Definition of Done

A team's shared checklist of criteria an item must meet to be considered complete, supporting built-in quality and consistent, transparent increments.

Related: Built-in Quality, Iteration Review
Inspect and Adapt (I&A)

An ART-level event at the end of each PI where teams demonstrate the solution, review metrics, and run a structured problem-solving workshop to improve the system.

Related: System Demo, Problem-Solving Workshop
Problem-Solving Workshop

A structured I&A activity in which ART members analyze a significant problem using root cause analysis, agree on actions, and assign owners for the next PI.

Related: Inspect and Adapt (I&A), Iteration Retrospective
Innovation and Planning (IP) Iteration

A special iteration at the end of each PI that provides time for innovation, hackathons, PI Planning preparation, and learning, while the ART also delivers planned work.

Related: Program Increment (PI), PI Planning
Quantitative Measurement (I&A metrics)

The practice of using data, such as predictability measures, flow metrics, and team self-assessments, during Inspect and Adapt so improvement decisions rest on facts rather than opinions.

Related: Inspect and Adapt (I&A), Problem-Solving Workshop
Generative AI

AI systems that produce text, images, or code from prompts, useful to Scrum Masters for drafting, summarizing, and brainstorming, always with human review of the output.

Related: Prompt Engineering, Responsible AI
Prompt Engineering

The skill of writing clear, contextual instructions, including role, context, constraints, and desired format, so an AI tool produces useful and accurate responses.

Related: Generative AI, Responsible AI
Responsible AI

The practice of using AI transparently, fairly, and securely, protecting sensitive data, checking for bias and errors, and keeping humans accountable for decisions.

Related: Generative AI, Prompt Engineering
AI-Augmented Facilitation

Using AI tools to support Scrum Master duties such as summarizing meetings, analyzing retrospective themes, drafting communications, and surfacing trends, while the Scrum Master retains judgment.

Related: Generative AI, Iteration Retrospective