SAFe SSM study materials
SAFe SSM study resources

SAFe SSM study plan

SAFe SSM · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Introducing Scrum in SAFe® & Characterizing the role of the Scrum Master

  • Map at least 8 distinct Scrum Master accountabilities in a SAFe environment to the Scrum framework elements they serve

  • Write a one-page comparison contrasting team-level Scrum events with ART-level events, citing one example of each from your own organization or a hypothetical ART

  • Define the three pillars of empiricism and pair each with a concrete SAFe artifact or ceremony that supports it

  • Draft a personal role charter stating your Scrum Master stance (servant leader, coach, facilitator, change agent) in your own words

Your checkpoint

A one-page accountabilities table with 8+ Scrum Master duties, each linked to a framework element and a team- or ART-level scope

Week 2

Characterizing the role of the Scrum Master

  • Categorize 10 realistic impediments by type (technical, organizational, dependency, people) and assign each an escalation path (team, ART, portfolio)

  • Write coaching plans for three scenarios: a blocked developer, a conflict between two team members, and a disengaged team member

  • Contrast servant leadership with directive management by writing 5 behavioral pairs showing what you would do differently in each case

  • Facilitate a 15-minute stand-up or retrospective in practice and record self-observation notes against a facilitation checklist

Your checkpoint

An impediment escalation playbook containing 10 categorized examples, named escalation owners, and target resolution timeframes

Week 3

Facilitating the Iteration Execution

  • Sequence all iteration events into a two-week calendar, listing the inputs, outputs, and Scrum Master responsibility for each

  • Write five facilitation scripts covering iteration planning kickoff, capacity discussion, story-point estimation, daily stand-up, and retrospective opening

  • Diagnose six common iteration anti-patterns (for example, stand-up as a status report) and prescribe a specific countermeasure for each

  • Explain how backlog refinement is scheduled and prepared so the team arrives at iteration planning with ready stories

Your checkpoint

An iteration calendar plus a facilitation cheat sheet covering every iteration event with inputs, outputs, and countermeasures

Week 4

Facilitating the Iteration Execution & Characterizing the role of the Scrum Master

  • Interpret team metrics such as velocity, predictability, and flow on a sample dataset and write three findings from the trends

  • Design a retrospective format that produces at least three improvement items, each with an owner and a due date

  • Run a 30-minute mock iteration-planning session (with a peer or self-recorded) and log every point where you deviated from the script

  • Differentiate when the Scrum Master facilitates versus participates across five concrete situations

Your checkpoint

A recorded or written mock iteration-planning session log plus a self-scored facilitation rubric with three improvement targets

Week 5

Participating in PI Planning

  • Walk through the full PI Planning agenda across both days and list the Scrum Master's specific responsibility in each segment

  • Build a pre-PI readiness checklist with 10 verifiable items covering team backlog, capacity, dependencies, and logistics

  • Draft five team PI objectives and critique each against the SMART criteria and the committed-versus-uncommitted distinction

  • Explain the Scrum Master's role in dependency mapping and in ROAMing risks, including what to escalate to the RTE

Your checkpoint

A PI Planning readiness checklist of 10 items plus five drafted PI objectives with written critique notes on each

Week 6

Finishing the PI

  • Break down the Inspect and Adapt structure and write the Scrum Master's contribution to the system demo, the quantitative measurement, and the problem-solving workshop

  • Create eight retrospective prompts and a facilitation flow for the PI retrospective

  • Build an inspect-and-adapt action log linking five improvements to owners, due dates, and success measures

  • Describe how to close out a PI, including finalizing objectives, capturing carryover work, and preparing the team for the next PI

Your checkpoint

A PI retrospective facilitation guide plus a populated action log template with five owner-assigned improvements

Week 7

Augmenting the Scrum Master Role with AI & Characterizing the role of the Scrum Master

  • Identify six Scrum Master tasks that AI can credibly augment and three that must remain human-owned, justifying each boundary

  • Write and test two prompts (for example, retrospective synthesis and backlog refinement support) and evaluate the outputs against accuracy and usefulness criteria

  • Draft a responsible-AI checklist with five governance points covering data privacy, bias, human review, and transparency

  • Rework every missed item from the Domain 2 quizzes taken in weeks 1 through 4 and record the corrected reasoning

Your checkpoint

An AI augmentation use-case sheet with six use cases, two tested prompts and their evaluated outputs, and a five-point governance checklist

Week 8

Characterizing the role of the Scrum Master & Facilitating the Iteration Execution

  • Complete two full timed practice exams and score at least 85% on the second attempt

  • Condense your notes into a one-page mental model of the Scrum Master role and iteration execution in SAFe

  • Drill 25 previously missed questions until no error type repeats

  • Rehearse 10 scenario-based judgment questions aloud, explaining the reasoning behind each answer choice

Your checkpoint

A final scorecard showing both practice exam scores, remaining weak areas, and a three-item pre-exam checklist

Milestones

Week 2: Explain the Scrum Master role in SAFe from memory for 10 minutes, correctly naming at least 8 accountabilities and 3 escalation paths without notes

Week 4: Score at least 80% on a 30-question practice set covering Domains 1, 2, and 4, and produce a written gap list of every missed concept

Week 6: Complete one full timed 60-question mock exam with a score of at least 75% and a written remediation plan for each weak domain

Week 8: Score at least 85% on a second full timed mock exam and confirm no domain falls below 70%